Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1 set per 5 days |
Delivery Time | 5-8 working days |
Packaging Details | Carton |
Product name | Deep Well Logging Equipment |
Model number | DJ |
Power | Electronic |
Cable material | Stainless steel |
Application | Deep Well Detect |
Power supply | AC 220V 50Hz |
Usage | Carry probes |
OEM/ODM | YES |
Brand Name | Gold |
Model Number | GDQ-2D |
Place of Origin | Chongqing, China |
View Detail Information
Explore similar products
Geophysical Electrical Wireline Logging System Automatic Winch
300m Geophysical Well Logging Equipment Magnetic / Electrical / Nuclear
Electronic Geophysical Borehole Logging Winch Vehicle Mounted
Portable Geophysical Well Logging Geophysics Winch Light Weight
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1 set per 5 days |
Delivery Time | 5-8 working days | Packaging Details | Carton |
Product name | Deep Well Logging Equipment | Model number | DJ |
Power | Electronic | Cable material | Stainless steel |
Application | Deep Well Detect | Power supply | AC 220V 50Hz |
Usage | Carry probes | OEM/ODM | YES |
Brand Name | Gold | Model Number | GDQ-2D |
Place of Origin | Chongqing, China | ||
High Light | ODM Well Logging Tools ,Well Logging Tools Geophysical ,Well Logging Equipment 220V |
Deep Well Logging Equipment Well Logging Tools
Well logging tools are used to obtain information about the geology, structure, and fluids present in a wellbore. Here are the general steps for using well logging tools:
1. Preparation: Before logging, the wellbore must be properly prepared. This includes cleaning the well, removing debris, and ensuring that the tool can be lowered and raised safely.
2. Tool selection: Different well logging tools are used to obtain different types of information. The tools selected depend on the purpose and goals of the logging.
3. Tool deployment: The logging tool is lowered into the wellbore either on a cable. The logging tool is then run vertically through the wellbore.
4. Data collection: As the logging tool moves through the wellbore, it collects data such as temperature, pressure, and electrical conductivity. This data is transmitted to the surface for analysis.
5. Interpretation: After the data is collected, it is analyzed by geologists and other experts. The information collected from the logs can be used to create a log or cross section of the wellbore, which can help to identify potential oil and gas reserves.
Technical Specification
Dip (inclination): | 0° -- 50° | Accuracy: | ±0.5° | |
Azimuth: | 0° -- 360° | Accuracy: | ±3°(typical @dip≥4°) | |
Resolution: | Azimuth:1° | Dip:0.1° | ||
Endurance: | About 6 hours (Using DC Power) | |||
Pressure: | 250 bar | |||
Dimensions: | Diameter Ø40 mm, Length 1230 mm, Weight 6 kg | |||
Storage: | 10 Projects with 99 shots each | |||
Temperature: | -10°C -- +60°C | |||
Power Supply: | 220V AC input or use internal DC battery |
Product Display
Company Details
Business Type:
Manufacturer
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Chongqing Gold Mechanical Electrical Equipment Co. Ltd. has been actively involved in the design, development, and manufacturing of geophysical exploration equipment for over four decades. Our expertise encompasses various techniques used to capture images and map subsurface features and structures ... Chongqing Gold Mechanical Electrical Equipment Co. Ltd. has been actively involved in the design, development, and manufacturing of geophysical exploration equipment for over four decades. Our expertise encompasses various techniques used to capture images and map subsurface features and structures ...
Get in touch with us
Leave a Message, we will call you back quickly!