Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1 set per 5 days |
Delivery Time | 5-8 working days |
Packaging Details | Carton |
Product Name | Water survey Equipment |
Type | Digital |
Application | Water Detection |
OM/ODM | Acceptable |
SP compensation range | ±10V |
Feature | Light and Portable |
Weight | ≤ 4.4 Kg |
Input impedance | ≥50MΩ |
Brand Name | Gold |
Model Number | WDJD-3A |
Place of Origin | Chongqing, China |
View Detail Information
Explore similar products
Underground Geophysical Resistivity Meter Gold Finder Water Detect
Earth Electrical Resistivity Test For Groundwater Exploration
1D VRS Electrical Resistivity Survey Geophysical Of Subsurface Materials
Dustproof Induced Polarization Geophysical Resistivity Meter Land Prospecting
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1 set per 5 days |
Delivery Time | 5-8 working days | Packaging Details | Carton |
Product Name | Water survey Equipment | Type | Digital |
Application | Water Detection | OM/ODM | Acceptable |
SP compensation range | ±10V | Feature | Light and Portable |
Weight | ≤ 4.4 Kg | Input impedance | ≥50MΩ |
Brand Name | Gold | Model Number | WDJD-3A |
Place of Origin | Chongqing, China | ||
High Light | Electrodes Underground Water Survey Equipment ,Underground Water Survey Equipment Terrameter ,Water Resistivity Meter |
Water Survey Terrameter With 4 Iron Electrodes Survey Method
The so-called electric method is to use the electric field to measure the apparent resistivity of underground rocks. Since the apparent resistivities of rocks are different, a method of drawing the rock interface can be drawn.
The electrical resistivity of water is very low, and a method of finding the location of water by using the obvious electrical difference between water and surrounding rock is called electrical method to find water.
The most commonly used are the apparent resistivity method and the apparent polarizability method (also known as the excited polarization method).
The theoretical basis for finding water by the electric method is to use the electrical difference of rocks. When we use two electrodes on the ground to supply power underground, an electric field is formed between the two electrodes. In this electric field, we use a meter to measure the temperature of a certain point. Point position and current intensity, and find the apparent resistivity of the point.
If there is water between the electric fields, then a low resistance value will appear above the water level. It is according to such means that the electric method is used to find water.
Product Display
Technical Parameter
Receiving Part | |
Voltage channel | 士 6V,士1 %土 1LSB |
lnput impedance | >50MQ |
Apparent polarizability precision | 士1%土 1LSB
|
SP compensation range
| 士1V
|
current channel | 6A,24 bit A/D
|
suppression
| suppression is over 80dB for 50Hz industrial frequency (common mode interference or differential mode interference)
|
Transmitting Part | |
Maximum transmitting power | 6600w |
Maximum voltage range
| 士1100v
|
Maximum current range
| 6A
|
Voltage channel
| 士24A,24 bit A/D
|
lnput resistance
| ≥50MQ
|
Others
| |
working temperature
| -10°℃~+50°℃,95 %RH
|
Storage temperature
| -20°℃~+60°℃
|
lnstrument power
| internal 12v rechargeable lithum battery or external 12v car battery, for 30 hours continously work
|
overall current
| ≤55mA
|
weight
| ≤4.4Kg
|
Dimension (L×WXH)
| 270mm * 246mm* 175mm
|
Certificate Display
Company Details
Business Type:
Manufacturer
Employee Number:
60~80
Ecer Certification:
Verified Supplier
Chongqing Gold Mechanical Electrical Equipment Co. Ltd. has been actively involved in the design, development, and manufacturing of geophysical exploration equipment for over four decades. Our expertise encompasses various techniques used to capture images and map subsurface features and structures ... Chongqing Gold Mechanical Electrical Equipment Co. Ltd. has been actively involved in the design, development, and manufacturing of geophysical exploration equipment for over four decades. Our expertise encompasses various techniques used to capture images and map subsurface features and structures ...
Get in touch with us
Leave a Message, we will call you back quickly!