China factories

China factory - Guangdong ALI Testing Equipment Co,.Ltd

Guangdong ALI Testing Equipment Co,.Ltd

  • China,Dongguan ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW
China Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW

  1. China Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW
  2. China Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW
  3. China Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW
  4. China Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW
  5. China Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW

Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW

  1. MOQ: 1 unit
  2. Price: Negotiable
  3. Get Latest Price
CertifiCAT-partsion ISO9001
Payment Terms T/T L/C, 30% deposit,70% before delivery
Supply Ability 100 units/ Per month
Delivery Time 30 days
Packaging Details Open type
Port: HongKong or ShenZhen,ShangHai,Dalian as required
Cooling method Water-cooled
CertifiCAT-partse CE/ISO9001
Alternator Leroy somer,Stamford, Marathon
Frequency 50HZ, 60HZ
Speed 1500rpm, 1800rpm
Rated Voltage 110/220V, 220/380V, 230/400V
Brand Name GSKA
Model Number 1004NG
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

CertifiCAT-partsion ISO9001 Payment Terms T/T L/C, 30% deposit,70% before delivery
Supply Ability 100 units/ Per month Delivery Time 30 days
Packaging Details Open type Port: HongKong or ShenZhen,ShangHai,Dalian as required
Cooling method Water-cooled CertifiCAT-partse CE/ISO9001
Alternator Leroy somer,Stamford, Marathon Frequency 50HZ, 60HZ
Speed 1500rpm, 1800rpm Rated Voltage 110/220V, 220/380V, 230/400V
Brand Name GSKA Model Number 1004NG
Place of Origin China
High Light diesel generator setelectric generator set

Three Phase Natural Gas 4 Cylinder Generator 4 Stroke 1004NG 100KW

 

Cutting edge appliCAT-parts-partsions:


1. Coordinated control of battery energy storage and diesel generator in independent AC microgrid


In the independent AC microgrid system, the coordination control between the diesel generator and the battery energy storage is the key to ensure the stable operation of the system. Based on the fast response characteristic of battery energy storage, a coordinated control method of diesel generator and energy storage battery was proposed. When the diesel generator is used as the main power supply, the auxiliary power control signal is introduced into the traditional droop control of the energy storage system to prevent the system collapse caused by the diesel engine overcurrent for a long time and improve the system stability. Aiming at the short-time power outage problem when the main power supply in the microgrid changes from the energy storage system to the diesel generator or from the diesel generator to the energy storage system, a seamless switching control strategy of the two main power supplies of the diesel generator and the energy storage battery is proposed.


2. Modeling and operation simulation of Marine Diesel generator Set


The operation process of Marine diesel generator set is an important part of power plant operation. The number of diesel generators operating in parallel determines the capacity of a Marine power station. The stability of parallel operation is closely related to the stability of Marine power station. It is of great significance to establish a mathematical model which can accurately reflect the operation of diesel generator set for operation control, simulation and performance analysis of power station. The study of parallel operation of diesel generator sets involves the establishment of diesel generator model, parallel operation control model and electric load model. Although there are some different modeling methods for diesel generator model, most of them are limited to single model simulation. Taking diesel generator model as the core, the mathematical model of parallel operation of multiple diesel generator sets is established. Taking the "Yu-kun" ship power station as the reference object, the diesel generator model, power load model and parallel operation control system model are established respectively

 

SpecifiCAT-parts-partsions :

 

Generator Genset Model GSKA-30
Rated Frequency 50HZ
Power Factor 0.8
Rated Voltage 400/230V
Rated Power (KW/KVA) 30/37.5
Standby Power (KW/KVA) 33/41.25
Phase/Wire 3Ph, 4Wr
Overall Size (mm) 2200×845×1650
Weight (kg) 780
Engine Brand Lovol
Model   1004NG
Type Closed water-cooled,in line,4-stroke,1500RPM
Rated Power(kw) 40
Intake Type Natural
No. of Cylinder 4.L
Bore×Stroke(mm) 100×127
Piston Speed (m/s) 7.62
Compression Ratio 10.5:01
Mechanical Governor Rated ≦5%
Electronical Governor Rated ≦1%
Noise Level (dBA) ≦95
Exhaust Temperature (℃) 600
Lube Oil Capacity(L) 8.1
Rated gas Consumption(CUM/kwh) 0.33
Alternator Model  PIC30
Rated Power(KW/KVA) 30/37.5
Power Efficiency  88.60%
Voltage Regulation ≦±1
Excitation Type Brushless
Insulation Class H

 

 

Customer Support Services:

 

Ø Installation


Ø Training (Training customer employees)


Ø Calibration


Ø Preventative maintenance


Ø Replacement parts


Ø Assistance via phone or internet

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company

  • Year Established:

    1985

  • Total Annual:

    4Million-5Million

  • Employee Number:

    50~100

  • Ecer Certification:

    Active Member

  Since establishment in 1985, Guangdong ALI Testing Equipment Co., Ltd, a wholly-owned subsidiary of GSKA Group has been providing a wide and complete range of products and services to the society. GSKA has now 16 offices, warehouses and service centres in China, with head office loCAT-part...   Since establishment in 1985, Guangdong ALI Testing Equipment Co., Ltd, a wholly-owned subsidiary of GSKA Group has been providing a wide and complete range of products and services to the society. GSKA has now 16 offices, warehouses and service centres in China, with head office loCAT-part...

+ Read More

Get in touch with us

  • Reach Us
  • Guangdong ALI Testing Equipment Co,.Ltd
  • No. 2, Shajiao Sijia Gate, Humen Town, Dongguan City, Guangdong Province, China
  • https://www.genset-dieselgenerator.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement