CertifiCAT-partsion | CE SGS ROHS UL |
Payment Terms | L/C, T/T |
Supply Ability | 1000 tons per month |
Delivery Time | 5-7working days after received deposit |
Packaging Details | Export package |
Warranty | 1month |
Voltage | 24V |
model | 650-045 |
authentiCAT-partsion certifiCAT-partse | CE SGS ROHS UL |
appliCAT-partsion | generator |
Brand Name | GSKA |
Model Number | 650-045 |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
FG Wilson Generator Spare Parts Control Panel 650-092 24V DC
Digital FG Wilson Generator Parts , Stable Olympian Data Line 8923-1061,Woodward
Heavy Duty FG Wilson Generator Parts 2001 Generator Control Box
FG Wilson Generator Parts Generator Oil Pressure Sensor VDO-S-003B-H
Product Specification
CertifiCAT-partsion | CE SGS ROHS UL | Payment Terms | L/C, T/T |
Supply Ability | 1000 tons per month | Delivery Time | 5-7working days after received deposit |
Packaging Details | Export package | Warranty | 1month |
Voltage | 24V | model | 650-045 |
authentiCAT-partsion certifiCAT-partse | CE SGS ROHS UL | appliCAT-partsion | generator |
Brand Name | GSKA | Model Number | 650-045 |
Place of Origin | Guangdong, China | ||
High Light | 650-045 PCB Circuit Board ,24V FG Wilson Generator Parts |
PCB Circuit Board 24V 650-045 For FG Wilson Generator Parts Accessories
product presentation:
The PCB board 650-045 is part of the FG Wilson generator control system. The board is designed for use with 24V power supplies and is used in a variety of FG Wilson generator models.
The main function of the PCB circuit board is to control and monitor the electrical system of the generator, including voltage, frequency and current. It also provides protection against overload and other electrical failures.
If you need to replace the faulty PCB circuit board in the FG Wilson generator, you can rest assured to buy from our company
Ensure the MPU (Magnetic Pickup) is installed correctly. | |||
1) Unscrew and pull out the magnetic pickup that is loCAT-parts-partsed near the flywheel of the engine. | |||
2) Inspect the magnetic tip and ensure that it is clean and free of debris. | |||
3) Screw the MPU in until the tip makes contact with the top of the flywheel teeth. | |||
4) Back out the magnetic pickup ½ to ¾ of a turn. | |||
EIM (Engine Interface Module) | |||
1) Turn the ten-turn potentiometer between five to seven turns clockwise or just until you feel a small click - signifying the full span of the pot. | |||
2) Start the generator set. You will notice the overspeed calibration LED illuminated. | |||
3) Slowly turn the potentiometer counter-clockwise until the LED just turns off. | |||
5) As soon as the LED turns off, start to slowly turn back the potentiometer clockwise just until the led starts to flicker. |
Warranty | 1month |
Place of Origin | Guangdong, China |
Voltage | 24V |
model | 650-045 |
authentiCAT-parts-partsion certifiCAT-parts-partse | CE SGS ROHS UL |
appliCAT-parts-partsion | generator |
FAQ:
Q1:Are you a maunfacture or a trading company?
A: We are a manufacture & Trading company with over 10 years’experience for parts supply service.
Q2: Do you have anything Special compete with others?
A: We will accord customer’s specail needs to have a special processing. And we have nearly a year of warranty period. In addition to the above
two points. We also ensure on time delivery.
Q3: How to ensure the quality of products?
A: Our relationship factory product by professional workers. In addition, We are also testing every product before delivery. And all material we
used as international standard.
Q4: How can i do if i find the quality of the products with problem?
A: First of all, We have confidence in the quality of our products. If really found someting wrong. Please provide the picture. We have warranty
within one year. So you can set your heart at rest to buy our products.
Q5. What is your terms of packing?
A: Generally, we pack our goods in Original box.
Q6. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q7. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q8. How about your delivery time?
A: Generally, most of items we keep stock for all season. It will take 7to 10 days after receiving your advance payment. If we didn’t have stock ,
The delivery time depends on the items and the quantity of your order. Normaly 4 to 5 days.
Q9. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q10. Do you inspect all your goods before delivery?
A: Yes, we have 100% test before delivery.
Company Details
Business Type:
Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company
Year Established:
1985
Total Annual:
4Million-5Million
Employee Number:
50~100
Ecer Certification:
Active Member
Since establishment in 1985, Guangdong ALI Testing Equipment Co., Ltd, a wholly-owned subsidiary of GSKA Group has been providing a wide and complete range of products and services to the society. GSKA has now 16 offices, warehouses and service centres in China, with head office loCAT-part... Since establishment in 1985, Guangdong ALI Testing Equipment Co., Ltd, a wholly-owned subsidiary of GSKA Group has been providing a wide and complete range of products and services to the society. GSKA has now 16 offices, warehouses and service centres in China, with head office loCAT-part...
Get in touch with us
Leave a Message, we will call you back quickly!