Payment Terms | T/T |
Supply Ability | as much as possible |
Delivery Time | 3 days to 7 days |
Packaging Details | plastic film wrapped or vacuumed, and sustained in the wooden crate |
Material | Aluminum |
Precision | +/-0.02mm |
Measurement | CMM |
Dimension control | 2D print |
Tolerance | GD&T |
Processing | CNC milling |
Lead time | Quick turnaround |
Incoterm | EXW |
Brand Name | Gennki |
Certification | ISO9001 / TS 16949 |
Place of Origin | China |
View Detail Information
Explore similar products
EDM Process CNC Milling Parts Parts Wire Cutting Quick Turnaround
Brass Alloy CNC Machining Parts EDM Wire Cut Machine Parts
GD Brass CNC Machining Parts Wire Cutting EDM Milling Parts
Nitride CNC Aluminum Milling Parts Hardening Stainless Steel 304
Product Specification
Payment Terms | T/T | Supply Ability | as much as possible |
Delivery Time | 3 days to 7 days | Packaging Details | plastic film wrapped or vacuumed, and sustained in the wooden crate |
Material | Aluminum | Precision | +/-0.02mm |
Measurement | CMM | Dimension control | 2D print |
Tolerance | GD&T | Processing | CNC milling |
Lead time | Quick turnaround | Incoterm | EXW |
Brand Name | Gennki | Certification | ISO9001 / TS 16949 |
Place of Origin | China | ||
High Light | 2D print aluminum cnc milling ,CMM compressor aluminum cnc milling ,aviation turbocharger turbine wheel |
Turbine wheel for aviation and automotive, locomotive industry
Gennki can use advanced equipment to precision machine turbocharger compressor housing, turbine housing, bearing housing, compressor wheel, turbine shaft wheel, back plate/seal plate, and other parts.
Type | Broaching, Drilling, Etching / Chemical Machining, Laser Machining, Milling, Other Machining Services, Rapid Prototyping, Turning, Wire EDM |
Material Capabilities | Aluminum, Brass, Bronze, Copper, Hardened Metals, Precious Metals, Stainless Steel, Steel Alloys, |
Tolerance | +/-0.02mm |
Material | Aluminum alloy 6061,6063, 7075,2024 |
Quality control | CP and 2D Projector inspection |
products name | OEM case aluminum mechanical cnc parts |
Finish | anodizing, Plating |
Sample time | 7 days |
Service | Precision Custom Aluminum Turning Parts |
Color | all kinds of color can be made |
Frequently Asked Question:
Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process. Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is delayed.
4) If a delay happens on delivery in the course, extra hours will help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.
Q5. Can we site-visit to experiment with the finished component?
You are always welcome to the company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2000
Total Annual:
3.2M-4M
Employee Number:
100~200
Ecer Certification:
Active Member
Gennki Group, the headquarter office located in the metropolitan city of Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer. It will be convenient... Gennki Group, the headquarter office located in the metropolitan city of Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer. It will be convenient...
Get in touch with us
Leave a Message, we will call you back quickly!