China factories

China factory - Gennki Group

Gennki Group

  • China,Shanghai ,Shanghai
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Cold Runner FDA PP Home Appliance Mold DME Coffee Cup Mould
China Cold Runner FDA PP Home Appliance Mold DME Coffee Cup Mould

  1. China Cold Runner FDA PP Home Appliance Mold DME Coffee Cup Mould
  2. China Cold Runner FDA PP Home Appliance Mold DME Coffee Cup Mould
  3. China Cold Runner FDA PP Home Appliance Mold DME Coffee Cup Mould

Cold Runner FDA PP Home Appliance Mold DME Coffee Cup Mould

  1. MOQ: 1 mold
  2. Price: Discuss base on certain RFQ
  3. Get Latest Price
Payment Terms T/T
Supply Ability 60 sets/Monthly
Delivery Time 45 days~60 days
Packaging Details plastic film wrapped or vacuumed, and sustained in the wooden crate
Application water utensile
Shaping mode Plastic Injection Mould
Mold steel Harden steel or stainless steel
Cavity No. base on the production requirement
Surface finish Mirror Polishing
Plastic material FDA PP
Life expectancy 500K
Design standard DME or Hasco
Brand Name Gennki
Certification ISO9001 / TS 16949
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 60 sets/Monthly
Delivery Time 45 days~60 days Packaging Details plastic film wrapped or vacuumed, and sustained in the wooden crate
Application water utensile Shaping mode Plastic Injection Mould
Mold steel Harden steel or stainless steel Cavity No. base on the production requirement
Surface finish Mirror Polishing Plastic material FDA PP
Life expectancy 500K Design standard DME or Hasco
Brand Name Gennki Certification ISO9001 / TS 16949
Place of Origin China
High Light FDA PP Home Appliance MoldCold Runner Home Appliance MoldDME coffee cup mould

Plastic cups made by Injection mold

Plastic cups are incredibly cheap and have broad usage in our lives. These types of molds are the easy ones that are less complex features than others such as the parts from automotive and household industries.

With reference to mold manufacturing, the following sequence may make sense.

Step 1 --Loading in a Part Model

  • Load in the product model,
  • assign the mold pull direction and scale factor,
  • Create the containing box

Step 2 --Creating the Layout, Gates, and Runners,

  • Define the cavitation of the mold
  • Create gating for the part mode,
  • Create the runners between gate

Step 3 --Loading in a Mold Base

  • define the style of  the mold base
  • select the series of moldbase
  • enter the size any necessary customized specification of mold base

Step 4 --Creating the parting line and inserts

  • define the parting line for the creation of core and cavity
  • create necessary inserts

Step 5 --Designing the Hot Runner System (Optional)

  • define the style of manifold,
  • design the nozzle and runner system

Step 6 --Designing the Sliders, Lifters

  • Using the slider design will create the lifter head and lifter body that are required in the design for interior undercuts.

Step 7 --Designing the Cooling system

  • define the cooling channels for the core, cavity, plates, slides, or lifters
  • add standard cooling accessories to the cooling system.

Step 8 --Designing the Part Ejection system

  • define the ejector pins needed to eject the part from mold
  • choose the different styles and sizes of ejector pins that are needed in the design

Step 9 --Adding in Standard Parts

  • define and locate standard parts like the socket head cap screw and location locating rings to complete the mold desigh

 

Step 10 --Design of Electrodes for CAM

  • define the boundaries of geometry for electrodes
  • select an electrode tool holder for electrode designed

 

 

Product Description
Make injection molds and produce plastic injection molding parts
Plastic Materials: PS, ABS, PP, PVC, PMMA, PBT, PC, POM, PA66, PA6, PBT+GF, PC/ABS, PEEK, HDPE, TPU, PET, PPO,...etc.
Other materials: Rubber, Slilcone rubber, LSR, Aluminum, Zinc, Copper...Metal...etc.
Quality: RoSH and SGS standard
Feature: Non marking and Non flash
Size: According to your 2D or 3D Drawing
Color,Quantity,Unit price,Tooling cost,Tooling size: To be discussed
Package: Standard exported Wooden box packed, Fumigation process(upon required)
Mold Building Lead Time: T1, 4-5 weeks, Part measurement report (upon required).
Export Country: Europe, America, Australian, UK, Canada, France, Germany, Italy, Japan...etc.:
To be discussed In-Mold Decoration, Injection Mould, Plastic Mold, Overmould, 2K Mould, Die-Casting Mould, Thermoset Mold, Stack Mold,
Interchangeable Mold, Collapsible Core Mold, Die Sets, Compression Mold, Cold Runner System LSR Mold,...etc.
Mould Base: Hasco Standard, European Standard, World Standard
Mould Base Material: LKM, FUTA, HASCO, DME,...etc. Or as per Customer's requirement.
Surface Finish: Texture(MT standard), High gloss polishing
Cavity/Core Steel: P20, 2311, H13, 2344, Starvax 420, 236, AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 ...etc.
Hot/ Cold Runner HUSKY, INCOE, YDDO, HASCO, DME, MoldMaster, Masterflow, Mastip
Mould Life: 5,000 to 1,000,000 Shots. (According to your working environment.)
Design & Program Softwares: CAD, CAM, CAE, Pro-E, UG, Soildworks, Moldflow, CATIA....etc.
Facilities:
High-speed CNC, Standard CNC, EDM, Wire Cutting, WEDM, Grinder, Plastic Injection Molding Machine for trial out mold from 50-300

 

 

 

 

Frequently Asked Question:

Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process. Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is a delay.
4) If a delay happens on delivery in the course, extras hours will help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.
Q5. Can we test the plastic injection mold?
You are always welcome to company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2000

  • Total Annual:

    3.2M-4M

  • Employee Number:

    100~200

  • Ecer Certification:

    Active Member

Gennki Group, the headquarter office located in the metropolitan city of  Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer.  It will be convenient... Gennki Group, the headquarter office located in the metropolitan city of  Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer.  It will be convenient...

+ Read More

Get in touch with us

  • Reach Us
  • Gennki Group
  • 6F, 2008 JF Plaza HuqingPing Road, Qingpu district, Shanghai, PRC. 201702
  • https://www.gennkimfg.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement