China factories

China factory - Gennki Group

Gennki Group

  • China,Shanghai ,Shanghai
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China TS16949 Steel Home Appliance Mold NAK80 S50C DME Cooling Electric Fan Leaf
China TS16949 Steel Home Appliance Mold NAK80 S50C DME Cooling Electric Fan Leaf

  1. China TS16949 Steel Home Appliance Mold NAK80 S50C DME Cooling Electric Fan Leaf
  2. China TS16949 Steel Home Appliance Mold NAK80 S50C DME Cooling Electric Fan Leaf

TS16949 Steel Home Appliance Mold NAK80 S50C DME Cooling Electric Fan Leaf

  1. MOQ: 1 mold
  2. Price: Discuss base on certain RFQ
  3. Get Latest Price
Payment Terms T/T
Supply Ability 40 sets/Monthly
Delivery Time 45 days~60 days
Packaging Details plastic film wrapped or vacuumed, and sustained in the wooden crate
Application cooling
Shaping mode Injection mold
Mold steel Prehard steel
Cavity No. base on the production requirement
Surface finish Mirror Polishing
Mold standard DME
Design software Solidworks, Proe, Catia
Exportation NA
Brand Name Gennki
Certification ISO9001 / TS 16949
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 40 sets/Monthly
Delivery Time 45 days~60 days Packaging Details plastic film wrapped or vacuumed, and sustained in the wooden crate
Application cooling Shaping mode Injection mold
Mold steel Prehard steel Cavity No. base on the production requirement
Surface finish Mirror Polishing Mold standard DME
Design software Solidworks, Proe, Catia Exportation NA
Brand Name Gennki Certification ISO9001 / TS 16949
Place of Origin China
High Light NAK80 S50C Home Appliance MoldTS16949 steel Home Appliance MoldDME cooling electric fan leaf

Electric Fan manufactured by injection mold

At Gennki, providing the customers the turn-key solution from the concept to the real product, are committed to manufacturing the products for end-users efficiently.

The plastic product begins life in the mold. The mold produces the final shape of the product before it is ejected out into the world to perform its intended function. The mold can be designed and built to create totally finished product, including painted surfaces, assembled units from individual components, and molded-in metal inserts. However, if more features and functions are required from the mold, then costs and time will increase during its construction. Therefore, a great deal of thought should go into exactly what is required from the mold before the first mold design is even considered.

 

Parameter

Brand Name Gennki Group
Description Plastic Injection Mould
Material Steel
Plastic Material PP,PC,PE,PA6,ABS,PET,PVC,POM,.etc
Gate system Cold Runner/Hot Runner
Ejection Pin/Stripper Plate. etc
Movement Slider/lifter
A.B plate 1.1730/P20.etc
Tool Life 1M shots (Prototype tooling 2000pcs)
Mold Base Copy DME or Hasco steel
Cavity&Core P20/H13/NAK80/S50C/S136/738H.etc
Surface Finish Polish/Texture/Heat Treatment.etc
Cavities Single/Multiple/Family mold Lead Time: 3~8 weeks
Place of Origin China EAST

 

 

Frequently Asked Question:

Q1. What is required of RFQ?

1) 3D formats with .stp.(preferred) igs,.prt.

2) 2D drawing for tolerance/material/surface finish/test requirement/regulations

3) Quantity (by order, month and Year)

Q2. How do you ensure product quality?

Gennki applies assessment, planning, monitors every single process. Some bullet points:

1) Apply APQP Product development analysis

2) Lay emphasis on prevention and planning

3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?

1) Detailed planning, details per hour/person/machine number/stakeholder…

2) Main material is managed efficiently

3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is a delay.

4) If a delay happens on delivery in the course, extras hours will help to turn it on schedule

Q4. How can you if we don’t have the CAD data?

Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.

Q5. Can we test the plastic injection mold?

You are always welcome to company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.

Q6. How long does an injection mold last?

Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.

Q7. How about your guarantee or aftersales?

The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.

Q8. How Can I visit your company from abroad?

Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2000

  • Total Annual:

    3.2M-4M

  • Employee Number:

    100~200

  • Ecer Certification:

    Active Member

Gennki Group, the headquarter office located in the metropolitan city of  Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer.  It will be convenient... Gennki Group, the headquarter office located in the metropolitan city of  Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer.  It will be convenient...

+ Read More

Get in touch with us

  • Reach Us
  • Gennki Group
  • 6F, 2008 JF Plaza HuqingPing Road, Qingpu district, Shanghai, PRC. 201702
  • https://www.gennkimfg.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement