Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 50 sets per month |
Delivery Time | 25 working days |
Packaging Details | Packaged by Wooden Case with Soft Protective Material |
Max Load Power | Apparent Power: 3000kW |
Fan Control Power | 190V/380V,50Hz/60Hz |
Max Protection Grade | IP56 |
Dimensions | 9000*2438*2591 |
Weight | 6000KG |
Ambient Temperature | -10℃~+50℃ |
Brand Name | Fullde |
Model Number | LB-3000KW-10.5KV |
Certification | CE, ISO9001 |
Place of Origin | Dongguan,China |
View Detail Information
Explore similar products
Automatic Permanent Load Bank / Capacitive Load Bank With High Performance
1kw - 1500kw Dummy Medium Voltage Load Bank With Sound - Light Alarm System
Step Control Medium Voltage Load Bank With Stainless Steel Sheathed Elements
Adjustable Generator Testing Load Bank With Control Pattern Interlock Function
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 50 sets per month |
Delivery Time | 25 working days | Packaging Details | Packaged by Wooden Case with Soft Protective Material |
Max Load Power | Apparent Power: 3000kW | Fan Control Power | 190V/380V,50Hz/60Hz |
Max Protection Grade | IP56 | Dimensions | 9000*2438*2591 |
Weight | 6000KG | Ambient Temperature | -10℃~+50℃ |
Brand Name | Fullde | Model Number | LB-3000KW-10.5KV |
Certification | CE, ISO9001 | Place of Origin | Dongguan,China |
High Light | ups load bank ,load bank testing equipment |
3000KW 10.5KV Resistance Medium Voltage Load Bank Test for Bank Date Center
Such equipment is used for testing the backup diesel generator of large data center.To ensure the continuous operation,UPS is required by large data center and backup generator unit is an important part to maintain the continuous power supply.Long time empty load or light load may easily lead to the carbon deposition of backup generator unit thus the capacity decreasing and failed start easily occurring.Therefore,the backup generator unit needs to be tested and maintained with such equipment.
Long time empty load or light load may easily lead to the carbon deposition of backup generator unit thus the capacity decreasing and failed start easily occurring.The product can be used for testing performance indicators of data center's generator unit,regularly check,repair and maintain generator unit.It is crucial for data center to guarantee power steady.
Specification | |
Rating voltage/frequency | 10.5KV/50Hz |
Max Load Power | Apparent Power: 3000kW |
Load Resolution | step:200KW |
Power Factor | 1 |
Load Tolerance | ±5% |
Fan Control Power | 190V/380V,50Hz/60Hz |
Wire Connection | Load bank input——Copper bar |
Control power input——Connector-bar | |
Max Protection Grade | IP56 |
Way of Working | Continuous Working |
Cooling | Forced air cooling, horizontal inlet air and upwards exhaust cooling |
Transportation | Hoisting |
Color | RAL7032 |
Dimensions | 9000*2438*2591 |
Weight | 6000KG |
Accessories | Switch: ABB, Siemens and Schneider, PLC: Panasonic and Siemens; |
Operating Environment Parameter | |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
20,000,000-30,000,000
Employee Number:
300~500
Ecer Certification:
Active Member
Company Profile Guangdong Fullde Electrical Technology Co.,Ltd, is the leading manufacturer with more than 11 years experience, which locates in China fashion city – Humen Town, Dongguan city, and near by the High-speed rail station, registered capit... Company Profile Guangdong Fullde Electrical Technology Co.,Ltd, is the leading manufacturer with more than 11 years experience, which locates in China fashion city – Humen Town, Dongguan city, and near by the High-speed rail station, registered capit...
Get in touch with us
Leave a Message, we will call you back quickly!