Supply Ability | 300 Ton/Tons per Month hot water boiler |
Delivery Time | Average 15 Days |
Packaging Details | PE films for hot water boiler main body; plywood boxes for all auxiliaries |
Payment Terms | L/C, T/T |
Output | Hot Water |
Inlet Outlet Water Temp | 85/65℃ |
Fuel Type | Natural Gas, LNG, LPG, CNG |
Thermal Efficiency | 95% |
Warranty | 24 Months |
Product Name | Natural Gas Hot Water Boiler |
Brand Name | LEWAY BOILER |
Model Number | CWNS |
Certification | SGS, ISO, OHSAS |
Place of Origin | Henan, China (Mainland) |
View Detail Information
Explore similar products
Overheating Protection Gas Fired Hot Water Boiler , Natural Gas Hot Water
Fire Tube Natural Gas Hot Water Boiler Big Volume Combustion Room Design
0.35MW Horizontal Gas Fired Boiler , Gas Hot Water Tank Sufficient Heated
Compact Natural Gas Hot Water Boiler Natural Circulation 24 Months Warranty
Product Specification
Supply Ability | 300 Ton/Tons per Month hot water boiler | Delivery Time | Average 15 Days |
Packaging Details | PE films for hot water boiler main body; plywood boxes for all auxiliaries | Payment Terms | L/C, T/T |
Output | Hot Water | Inlet Outlet Water Temp | 85/65℃ |
Fuel Type | Natural Gas, LNG, LPG, CNG | Thermal Efficiency | 95% |
Warranty | 24 Months | Product Name | Natural Gas Hot Water Boiler |
Brand Name | LEWAY BOILER | Model Number | CWNS |
Certification | SGS, ISO, OHSAS | Place of Origin | Henan, China (Mainland) |
High Light | gas hot water furnace ,gas fired hot water boiler |
Full Automatic High Efficiency Natural Gas Hot Water Boiler For Industrial Heating
Product Name |
Natural Gas Hot Water Boiler
|
Fuel Type |
Natural Gas, LNG, LPG, CNG |
Thermal Efficiency |
95%
|
Operation Control |
PLC Programmable Control
|
After-sales Service Provided |
Engineers Available To Service Machinery Overseas
|
High Quality
The manufacture strictly in accordance with CHINA GB/T Standards. Boiler has automatic control, automatic water-level regulate; most important, also realizes autoamtic ignition, water-shortage protection, over-heat protection, flameout protection.
Quality Assurance
1. Strength calculation test report of applied materials
2. Whole set of pure water processor line featured with RO anti-saturation and advanced testing devices
3. Hydraulic test report: ensure the standard working pressure and safety
4. Third-party inspection report-Jiaozuo Special Equipment Inspection & Technical Research
Hot Water Boiler Model
Item / Unit / Model |
CWNS 0.35- 85/65-Y(Q) |
CWNS 0.48- 85/65-Y(Q) |
CWNS 0.58-85/65-Y(Q) |
CWNS 0.7- 85/65-Y(Q) |
CWNS 1.05-85/65- Y(Q) | CWNS 1.4-85/65-Y(Q) | CWNS 2.1-85/65-Y(Q) | CWNS 2.8-85/65-Y(Q) | CWNS 4.2-85/65-Y(Q) | CWNS 5.6-85/65-Y(Q) | CWNS 7.0-85/65-Y(Q) | ||
Rated Heat Capacity |
MW | 0.35 | 0.48 | 0.58 | 0.7 | 1.05 | 1.4 | 2.1 | 2.8 | 4.2 | 5.6 | 7.0 | |
Working Pressure | MPa | Non Pressure | |||||||||||
Inlet/Outlet Water Temperature |
℃ | 85/65 | 85/65 | 85/65 | 85/65 | 85/65 | 85/65 | 85/65 | 85/65 | 85/65 | 85/65 | 85/65 | |
Heating Surface |
㎡ | 19.5 | 21 | 31 | 34.2 | 50.2 | 65.76 | 93.61 | 113.44 | 187.1 | 260.36 | 273.7 | |
Thermal Efficiency |
% | 91-98% | |||||||||||
Fuel Consumption | Natural Gas | Nm³/h | 36/38 | 49/52 | 59/63 | 71/76.7 | 104/112 | 142/153.4 | 208/226.1 | 280/304.8 | 414/440.3 | 547/602.5 | 680/730 |
Diesel | Kg/h | 32.5 | 44.5 | 53.8 | 64.9 | 97.4 | 139.9 | 194.8 | 259.8 | 376.5 | 497.6 | 623.7 | |
Electric Consumption |
KW/h | 1.1 | 2.3 | 2.3 | 2.3 | 4.0 | 4.7 | 7.5 | 8.2 | 11 | 15 | 22 | |
Transport Weight | Kg | 1550 | 1650 | 1950 | 2100 | 2900 | 3500 | 4950 | 5190 | 10600 | 16000 | 19104 | |
Water Volume | L | 700 | 850 | 1100 | 1500 | 1848 | 2700 | 3600 | 5000 | 9000 | 13300 | 13300 | |
Dimension | Length | mm | 2260 | 2280 | 2395 | 2695 | 3205 | 3685 | 3915 | 4415 | 5300 | 6420 | 6822 |
Width | mm | 1120 | 1120 | 1475 | 1475 | 1475 | 1665 | 1750 | 1900 | 2380 | 2528 | 2550 | |
Height | mm | 1550 | 1590 | 1750 | 1750 | 1750 | 2015 | 2160 | 2300 | 2742 | 3015 | 3064 | |
Water Outlet Pipe |
mm | 80 | 80 | 100 | 100 | 125 | 150 | 150 | 200 | 200 | 250 | 250 | |
Water Inlet Pipe | mm | 80 | 80 | 100 | 100 | 125 | 150 | 150 | 200 | 200 | 250 | 250 | |
Atmosphere Open Pipe | mm | 80 | 80 | 100 | 100 | 125 | 150 | 150 | 200 | 200 | 250 | 250 | |
Drain Pipe | mm | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | |
Chimney | mm | 250 | 250 | 250 | 250 | 250 | 300 | 350 | 400 | 600 | 700 | 800 | |
Basement Dimensions | Length | mm | 1950 | 1980 | 2050 | 2120 | 2620 | 3100 | 3100 | 3560 | 4100 | 5200 | 5380 |
Width | mm | 800 | 810 | 1000 | 1000 | 1000 | 1100 | 1200 | 1300 | 1750 | 2000 | 2100 |
Complate Boiler Room System
Product Show
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2007
Total Annual:
30 Milion-40 Milion
Employee Number:
100~200
Ecer Certification:
Active Member
Established in 2007, Henan Leway Thermal Equipment Manufacture Co Ltd is a professional manufacturer that specialized in the environment-friendly boiler's design, manufacture, installation, maintenance. Our factory is located in beautiful Jiaozuo City which neary Zhengzhou Airport, Zhengzhou Rai... Established in 2007, Henan Leway Thermal Equipment Manufacture Co Ltd is a professional manufacturer that specialized in the environment-friendly boiler's design, manufacture, installation, maintenance. Our factory is located in beautiful Jiaozuo City which neary Zhengzhou Airport, Zhengzhou Rai...
Get in touch with us
Leave a Message, we will call you back quickly!