Supply Ability | 3000 Ton/Tons per Year |
Delivery Time | Within 20 working days |
Packaging Details | PE films packed the electric boiler's main-body, spare parts packed with PE film and metal boxes |
Fuel | Electric |
Output | Steam |
Electricity Consumption | 360KW, 720KW, 1080KW, 1440KW, 2160KW, 2820KW/H |
Steam Capacity | 500KG, 1000KG, 1500KG, 2000KG, 3000KG, 4000KG/H |
Style | Horizontal |
Pressure | Low Pressure |
Structure | Fire Tube |
After-sales Service Provided | Engineers available to service machinery overseas |
Brand Name | LEWAY BOILER |
Model Number | WDR |
Certification | SGS, ISO, OHSAS |
Place of Origin | Henan, China (Mainland) |
View Detail Information
Explore similar products
Laundry Machine Industrial Electric Steam Boiler ≤184℃ Steam Temperature
Fuel Electric Low Pressure Steam Boiler , Electric Fired Boiler Large Steam
Horizontal Style Electric Steam Generator ON - OFF Stepwise Control Operation
Environmental Protection Industrial Electric Steam Boiler Fire Tube Structure
Product Specification
Supply Ability | 3000 Ton/Tons per Year | Delivery Time | Within 20 working days |
Packaging Details | PE films packed the electric boiler's main-body, spare parts packed with PE film and metal boxes | Fuel | Electric |
Output | Steam | Electricity Consumption | 360KW, 720KW, 1080KW, 1440KW, 2160KW, 2820KW/H |
Steam Capacity | 500KG, 1000KG, 1500KG, 2000KG, 3000KG, 4000KG/H | Style | Horizontal |
Pressure | Low Pressure | Structure | Fire Tube |
After-sales Service Provided | Engineers available to service machinery overseas | Brand Name | LEWAY BOILER |
Model Number | WDR | Certification | SGS, ISO, OHSAS |
Place of Origin | Henan, China (Mainland) | ||
High Light | industrial steam generator ,electric heating steam boiler |
Electric Heating Steam Boiler 350 - 2800KW for Industrial Use
Product Description
Product Name |
Industrial Electric Steam Boiler
|
Fuel Type |
Electric
|
Thermal Efficiency |
98%
|
Operation Control |
PLC Programmable Control
|
After-sales Service Provided |
Engineers Available To Service Machinery Overseas
|
Features
1. All the electrical components have the CE and CCC certification
2. Cartridge Heaters can work for about 20000 hours
3. PLC full automatic intelligent control cabinet, operate conveniently.
4. Full automatic interlock protection program, operate safely.
5. Reliable boiler auxiliaries, i.e. pressure controller, pressure transmitter, water level alarm, safety valve,
etc.
6. Large steam space, high steam quality.
7. Environmental protection.
8. Small occupation, save construction investment.
Steam Boiler Model
Item /Unit/Model | WDR0.5-1.0-D | WDR-1.0-1.0-D | WDR1.5-1.0-D | WDR-2.0-1.0-D | WDR3.0-1.0-D | WDR4.0-1.0-D | ||
Rated Heat Capacity | Kg/h | 500 | 1000 | 1500 | 2000 | 3000 | 4000 | |
Working Pressure | Mpa | 1 | 1 | 1 | 1 | 1 | 1 | |
Rated Steam Temp | ℃ | 184 | 184 | 184 | 184 | 184 | 184 | |
Feedwater Temp | ℃ | 20 | ||||||
Thermal Efficiency | % | 98 | ||||||
Water Volume | L | 2000 | 2600 | 2850 | 3415 | 5850 | 8100 | |
Steam Outlet | DN | 40 | 50 | 65 | 80 | 80 | 100 | |
Water Inlet | DN | 25 | 25 | 40 | 40 | 40 | 40 | |
Drain Valve | DN | 40 | 40 | 40 | 40 | 40 | 40 | |
Relief Valve | DN | 40 | 40 | 2×40 | 2×40 | 2×50 | 2×50 | |
Heating-Tube | Kw/h | 24 | 60 | 60 | 60 | 60 | 60 | |
Heating-Tube Unit | Qty | 15 | 12 | 18 | 24 | 36 | 47 | |
Dimensions | Length | mm | 2720 | 2970 | 3200 | 3700 | 4180 | 4790 |
Width | mm | 1760 | 1860 | 1860 | 1800 | 2100 | 2180 | |
Height | mm | 1730 | 1830 | 1830 | 1830 | 1980 | 2100 | |
Base Dimensions | mm | 2220×900 | 2350×1000 | 2700×1000 | 3200×1000 | 3800×1100 | 4200×1200 | |
Transport Weight | Kg | 1650 | 2001 | 2228 | 2525 | 2930 | 3460 |
Our services
We have professional engineers service team. According to the customers’ requirement and site specific condition, they can make the suitable and optimal solution about the after-sales service. Moreover, LEWAY Boiler set up sales and after sale facilitating agencies around over 30 regions, to offer the high quality services.
1. 24hours service hotline.
2. 24 months warranty after delivery.
3. Spare parts are equipped during shipment.
4. Provide instllation, commissioning and maintance service anytime.
Packaging & Shipping
1. Packing way: nude packaging for boiler main part and wood box packaging for boiler accessories.
2. Container packing: 20 container
3. All goods will be reforced after packing into containers.
4. We have stable shipping company to cooperate. They will confirm the safty of the goods.
5. Shipping way is different according to customer's country. Mostly by sea. Some country by train.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2007
Total Annual:
30 Milion-40 Milion
Employee Number:
100~200
Ecer Certification:
Active Member
Established in 2007, Henan Leway Thermal Equipment Manufacture Co Ltd is a professional manufacturer that specialized in the environment-friendly boiler's design, manufacture, installation, maintenance. Our factory is located in beautiful Jiaozuo City which neary Zhengzhou Airport, Zhengzhou Rai... Established in 2007, Henan Leway Thermal Equipment Manufacture Co Ltd is a professional manufacturer that specialized in the environment-friendly boiler's design, manufacture, installation, maintenance. Our factory is located in beautiful Jiaozuo City which neary Zhengzhou Airport, Zhengzhou Rai...
Get in touch with us
Leave a Message, we will call you back quickly!