China factories

China factory - Chengdu Sevenpower Generating Equipment Co., Ltd.

Chengdu Sevenpower Generating Equipment Co., Ltd.

  • China,Chengdu ,Sichuan
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 220KW 280KVA 3 Phase Natural Gas CHP , Cogeneration Combined Heat And Power
China 220KW 280KVA 3 Phase Natural Gas CHP , Cogeneration Combined Heat And Power

  1. China 220KW 280KVA 3 Phase Natural Gas CHP , Cogeneration Combined Heat And Power

220KW 280KVA 3 Phase Natural Gas CHP , Cogeneration Combined Heat And Power

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Delivery Time 30days
Payment Terms L/C, T/T
Fuel Natural gas, Biogas is available on request
Frequency 60Hz
Electrical Output 220kw
Color White or Black, other colors please consult with the sales
Emissions Available on request
Sounproof Canopy With or without
Brand Name SevenPower
Model Number SP220N
Certification CE
Place of Origin Chengdu,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Delivery Time 30days Payment Terms L/C, T/T
Fuel Natural gas, Biogas is available on request Frequency 60Hz
Electrical Output 220kw Color White or Black, other colors please consult with the sales
Emissions Available on request Sounproof Canopy With or without
Brand Name SevenPower Model Number SP220N
Certification CE Place of Origin Chengdu,China
High Light natural gas cogenerationnatural gas combined heat and power

60HZ 220KW 280KVA 3 Phase Natural Gas CHP Natural Gas Cogeneration Natural Gas Generator Set With Heat Recovery System
 

Production
- Keep customers posted on the progress of production.
- Systematical and strict testing before delivering to customers
- Testing

  • Including 0%,25%,50%, 75%, 100%, 110% load
  • Emergency stop
  • All protections(high temperature, low oil pressure, over speed, over load, over frequency and phase failure etc.)
  • Electrical and thermal power output
  • Synchronization

STORAGE TIME

RECOMMENDED SERVICE PROCEDURE TO

PREVENT HARD STARTING

Less than 1 month Drain all CHP water.
More than 1 month

Change engine oil.

 

Remove the spark plug, and pour about a tablespoon of clean engine oil into the cylinder. Crank the engine several revolutions to distribute the oil, then reinstall the spark plug.

 

Slowly pull the starter grip until resistance is felt. At this point, the piston is coming up on its compression stroke and both the intake and exhaust valves are closed. Storing the engine in this position will help to protect it from internal corrosion.

 

CHP Main Specifications

 

Item   Model SP220N
  fuel Natural Gas
  marks Synchro CHP
CHP electrical output(KWe) kVA/kWe Continuous Power
275/220
thermal output(KWt) kWt 300
electrical efficiency % 34.4%
thermal efficiency % 47.6%
overall efficiency % 82%
frequency Hz 60
voltage V 440/254
gas inlet pressure kPa 3-5
dimension (soundproof type) mm*mm*mm 2900*1600*1800
net weight kgs 3500
NG consumption m3/kW.h 0.295
standard type-db(A)@7m 59
Certificate CE
water-water heat exchanger SWEP
water-exhaust heat exchanger made of full stainless steel
ignition system Altronic
speed governor Woodward or Hainzmann
mixer Venturi type
gas filter Madas
zero regulator Kromschroeder
Lambda auto control Available on request
emission standard Available on request
MCB ABB
GCB ABB
Controller     ComAp IC
Engine Engine model STYER T12
Engine type 6 cylinders,4stroke,water-coolled
RPM 1800
Compression Ratio 11.0
Displacement 11.6L
Oil capacity 36L
Charging voltage 24V(DC)
Charging current 5A(DC)
Starting system Electic-start
Alternator model Meccalte
phase 3 phase 4 wires
insulation system class H
protection IP23
Cooling Type air cooled

 

Why SevenPower?

 
- Environmentally friendly design
- Long time research and development and testing for high reliability
- Comprehensive heat insulation to minimize heat losses
- Water-to-water heat exchanger/SWEP, self-developed exhaust heat exchanger which is made of full stainless steel #316 instead of universal carbon steel which get rusty easily.
- CHP inner pipeline is made of full stainless steel.
- Maximum lower the noise level
- Maintenance friendly thanks to easy access
- Long service intervals
- Suitable for mains parallelling
- CE approved
 
For more information about the 220KW CHP, please consult with your sales representative.Thanks.

 

Our Packing

Our Hannover Exhibition

Our Showroom In Germany

 

Our Customers' Visiting

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Trading Company,Seller

  • Year Established:

    2013

  • Employee Number:

    40~50

  • Ecer Certification:

    Verified Supplier

Chengdu Sevenpower Generating Equipment Co., Ltd is an energy saving and environmental protection high-tech enterprise specialized in gas generator,gas CHP,CCHP and diesel generator set,hybrid power system under the registered trademark WeTeam.   Factory is located in Chengdu city, the te... Chengdu Sevenpower Generating Equipment Co., Ltd is an energy saving and environmental protection high-tech enterprise specialized in gas generator,gas CHP,CCHP and diesel generator set,hybrid power system under the registered trademark WeTeam.   Factory is located in Chengdu city, the te...

+ Read More

Get in touch with us

  • Reach Us
  • Chengdu Sevenpower Generating Equipment Co., Ltd.
  • No.255 Rd.WanXing.Avenue Longhu.Industrial East Zone, Xindu,Chengdu,Sichuan,China
  • https://www.gas-chp.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement