Payment Terms | T/T, L/C |
Supply Ability | 1-10set/year |
Delivery Time | 7-10 months |
Packaging Details | Wooden box; |
Application | building material, panel, roof |
Material | Hot rolled coil, cold rolled coil |
Width | 1250mm |
Thickness | 0.4mm-1.8mm |
Zinc coating | 30-300g/m2 |
name | 0.4-1.8mm 1250mm Continuous Galvanizing Line Process For Steel Industry |
keyword | Steel Continuous Galvanizing Line |
type | continuous |
process | hot dip |
material | steel metal ss cs |
componet | entry looper |
capacity | 400,000t/year |
Brand Name | JJRS |
Place of Origin | China |
View Detail Information
Explore similar products
Vertical Continuous Galvanizing Line Electro Steel Galvanizing Plant Design
Automatic Hot Dip Galvanizing Plant Equipment For Steel Strip Coil Post Metal
Custom Continuous Galvanizing Line With Acid Smoke Collection Treatment
Annealing Hot Dip Continuous Galvanizing Line Furnace 0.12-0.6mm 650-1350mm
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 1-10set/year |
Delivery Time | 7-10 months | Packaging Details | Wooden box; |
Application | building material, panel, roof | Material | Hot rolled coil, cold rolled coil |
Width | 1250mm | Thickness | 0.4mm-1.8mm |
Zinc coating | 30-300g/m2 | name | 0.4-1.8mm 1250mm Continuous Galvanizing Line Process For Steel Industry |
keyword | Steel Continuous Galvanizing Line | type | continuous |
process | hot dip | material | steel metal ss cs |
componet | entry looper | capacity | 400,000t/year |
Brand Name | JJRS | Place of Origin | China |
High Light | 0.4mm continuous galvanizing line process ,steel industry continuous galvanizing line process ,1.8mm cgl line |
This production line is galvanizing line of cold rolled steel. It mainly includes uncoiling section, welding platform, entry looper, annealing furnace, zinc pot, air knife system, cooling system after galvanizing, tension leveler, passivation section, exit looper, reserve postion for electrostatic oiler and some other equipments. The production line's product position is architectural material, roof, panels, etc. Its function inlcudes annealing, galvanizing, finishing, straighterning, pre-painting oil. etc.
According to technical operation, this line could be divided into three sections: Entry section, process section and exit section
1. In Entry section
Entry coil skids I# & II# →Coil Loading Car I# & II# → Pay off Reel I# & II# → Decoiling guide board I# & II# →I# & II# Decoiling Pinch Delivery Machine I# & II# → Hydraulic Transverse crop and end Shearer →Scrap collecting disposal device →1# Deflector Roll→ Carry over conveyer →automotive welder→ Crescent shearer →Pinch Delivery Machine after welding →Tension Bridle Roll I#→ Entry Accumulator → CPC Single Roll Centering Machine I#& II# &3#
2. In process section
CPC single Roll Centering Machine IV# →Tension Bridle Roll II#→ CPC Single Roll Centering Machine V#→Tension Bridle Roll III#→Tensional strength Measuring Machine →Annealing Furnace → Furnace nose →Zinc Pot → Submerged Roll → Air Knife → Vertical Air Cooling Device → High Tower Deflector Roll → Horizontal Air Cooling Device → Water Quench Tank → Squeezer After Water-Quenching → Hot Air Blowing Off Unit I#→ CPC Double Roll Centering Machine I# →#online zinc coating thickness Gauge →Tension Bridle Roll V# →Skin pass gauge→ Skin pass squeezer → Hot Air Blowing Off Unit II #→Tension Bridle Roll V#→ Tension leveler → Tension Bridle Roll VI#→Passivating Rolling-Coater → Passivating baking Furnace
3. Exit section configured equipments:
Exit Accumulator → CPC Double Roll Centering Machine II# → Tension Bridle Roll VII# →pinch Shear→ Exit Pinch Delivery Machine → Tension Reel (armless EPC)→ Coil Unloading Car → Belt wrapper
Technical document description | Schedule for the Deliverables |
Civil construction and energy supply requirements | Within 7 days since the effective of contract |
General equipment layout drawings | Within 8 weeks since the effective of contract |
Equipment foundation condition drawing and embedded pipeline drawings | Within 10 weeks since the effective of contract |
Major equipment catalogue | Within 3 months since the effective of contract |
Split shipment arrangement | Within 4 months since the effective of contract |
Spare part list and drawings | Before hot commissioning of the equipments |
Equipment operation maintenance manual | Within 1 week since the check and acceptance at the buyer’s site |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
20000000-8000000
Employee Number:
1~100
Ecer Certification:
Active Member
Beijing JJRS Technology Development Co.,Ltd. registered in national high-tech park - Beijing Economic and Technological Development Zone, is a high-tech enterprise specialized in a complete set of metallurgical equipments for metal surface coating and steel strip intensive processing, its technology... Beijing JJRS Technology Development Co.,Ltd. registered in national high-tech park - Beijing Economic and Technological Development Zone, is a high-tech enterprise specialized in a complete set of metallurgical equipments for metal surface coating and steel strip intensive processing, its technology...
Get in touch with us
Leave a Message, we will call you back quickly!