China factories

China factory - Beijing JJRS Technology Development Co., Ltd.

Beijing JJRS Technology Development Co., Ltd.

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Sulfuric Spent Acid Regeneration Plant For Sale 4m3/H
China Sulfuric Spent Acid Regeneration Plant For Sale 4m3/H

  1. China Sulfuric Spent Acid Regeneration Plant For Sale 4m3/H
  2. China Sulfuric Spent Acid Regeneration Plant For Sale 4m3/H

Sulfuric Spent Acid Regeneration Plant For Sale 4m3/H

  1. MOQ: 1
  2. Price: USD$1,000,000~USD10,000,000
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 10-12 set/year
Delivery Time 7~10 months
Packaging Details wooden box; plastic package
Capacity 3m3/h,4m3/h,6m3/h,8m3/h. Can be designed according to customer's requirements
Waste acid Fe2+<140g/L HCL 3-5%
Regenerating acid Fe2+<5g/L HCL 190-220g/L
Iron Powder Fe2O3>99% CL-<0.01%
Exhaust gas Fe2O3<10mg/Nm3 HCL<20mg/Nm3
Effluent Fe2+0-120g/L hcl 0-20% (discontinuously discharge)
Efficiency >99.5%
Energy consumption <750Kcal/L
Energy electricity, water, compressed air
Brand Name JJRS

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 10-12 set/year
Delivery Time 7~10 months Packaging Details wooden box; plastic package
Capacity 3m3/h,4m3/h,6m3/h,8m3/h. Can be designed according to customer's requirements Waste acid Fe2+<140g/L HCL 3-5%
Regenerating acid Fe2+<5g/L HCL 190-220g/L Iron Powder Fe2O3>99% CL-<0.01%
Exhaust gas Fe2O3<10mg/Nm3 HCL<20mg/Nm3 Effluent Fe2+0-120g/L hcl 0-20% (discontinuously discharge)
Efficiency >99.5% Energy consumption <750Kcal/L
Energy electricity, water, compressed air Brand Name JJRS
High Light spent acid regeneration plantacid regeneration plant for salespent sulfuric acid regeneration

Valued acid regeneration plant 4m3/h (energy electricity) with perfect quality

 

When equipments are in normal running and calcinator in heat balance: consume 750Kcal/L waste acid
Natural gas heat value set (Party A provides final value, Party B calculates the consumption): 8400Kcal/N m3
Natural gas required(Party A provides final value, Party B calculates the consumption): 1000N m3/h Pressure:8-12kPa
COmbustion air:8900Nm3/h Pressure:8kPa
Compressed gas: 300Nm3/h(instruments consumed gas) Pressure: 0.5-0.7Mpa
Industrial water amount:20m3/h(not contiunous)
Desalted water quantity: 10m3/h

 

Iron oxide powder (not with silicon steel included)

When the iron decomposed out reaches 115g/L, about 1968kg/hiron oxide will be produced.

Iron oxide standards

No Description Parameters Unit
1 Fe2O2 ≥99.3 %
2 FeO ≤0.4 %
3 H2O ≤0.5 %
4 Cl ≤0.15 %
5 Original particle percentage ≤1.5 µm

The above listed data are all product parameters when acid pickling normal carbon steel, the acid regeneration unit has no desilicication. Iron oxide ingredients are greatly impacted by natural gas contents and acid pickling coil types.

 

Services Commitments:

No matter what kinds of products and services, only condition that being sold by JJRS, either production line, single equipment, component, spare parts, or technology service etc., perfect and timely after-sale service will surely be provided. Which is to say, when you use the high quality products of us, simultaneously you will enjoy perfect and timely after-sale service.

For this aim, we formally announce the following commitment:

1.Quality warranty: 1 year, within this period, you can enjoy technical supports from our appointed engineers; meanwhile, free repair and replacement will be provided by our technicians regarding the defects of equipment design, manufacture and quality;

2.Lifetime maintenance: we will provide lifetime maintenance service for all sold products, at the same time, provide spare parts at the cost prices;

3.Service visit periodically: even after warranty, periodical service visits will be arranged for routine checks, with the object to know the operation status and maintenance of equipments, and instruct if necessary;

4.Failure treatment: if any failure occurs regarding equipment, when being acknowledged by the customer, reply will be made within 6 hours, technicians will be sent to the site within 24 hours if necessary;

5.Spare parts: considering the easy consuming components and parts in the production process, spare parts warehouse has already set up, which can response the needs of clients in time;

6.Value added services: we will help clients to update the relevant technologies associated with our products.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2006

  • Total Annual:

    20000000-8000000

  • Employee Number:

    1~100

  • Ecer Certification:

    Active Member

Beijing JJRS Technology Development Co.,Ltd. registered in national high-tech park - Beijing Economic and Technological Development Zone, is a high-tech enterprise specialized in a complete set of metallurgical equipments for metal surface coating and steel strip intensive processing, its technology... Beijing JJRS Technology Development Co.,Ltd. registered in national high-tech park - Beijing Economic and Technological Development Zone, is a high-tech enterprise specialized in a complete set of metallurgical equipments for metal surface coating and steel strip intensive processing, its technology...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing JJRS Technology Development Co., Ltd.
  • https://www.galvanizing-lines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement