Packaging Details | Plywood pallet |
Delivery Time | 20 days after down payment |
Payment Terms | 30% down payment,seller starts production.70% down payment is paid before loading |
Supply Ability | 20 sets/Months |
Place of Origin | China |
Brand Name | GAIFENG |
Model Number | GF-3.5 |
Certification | ISO9001 |
View Detail Information
Explore similar products
GF-1.9 Small dutch brick road paving machine
GF-1.8 Small tiger stone paving machine for sale
GF-1.8 Small Machine Laid Pavers
Gaifeng machine Laying Paver Stones in Sand
Product Specification
Packaging Details | Plywood pallet | Delivery Time | 20 days after down payment |
Payment Terms | 30% down payment,seller starts production.70% down payment is paid before loading | Supply Ability | 20 sets/Months |
Place of Origin | China | Brand Name | GAIFENG |
Model Number | GF-3.5 | Certification | ISO9001 |
High Light | tiger stone brick laying machine ,brick laying machine ,brick laying machine price |
1.Introduction.
GF-3.5tiger stone brick laying machine for saleis invited to lay various interlock,paver into sidewalk square and parking lot.
It is quite labor saving and efficient.The machine runs alongside the baseline,automatically scrape the sand pad.
The laid road can compete with road built by labor.
2.Technical parameter
Item | Parameter | |
1 | Oversiz | 3500x1700x1750mm |
2 | Machine weight | 2500kgs |
3 | Maxium pavingwidth | 3200mm |
4 | Power | 3KW |
5 | Maximum running speed | 4m/min |
6 | Minimum running speed | 0.001m/min |
7 | Tehorectical capacity | 600M2/8hrs |
8 | Paving pattern | L shape Herrngbone,S shape etc9 |
9 | Labor required | 3 person |
10 | Gross weight | 2600KGS |
3.Advantage
1.Better working conditions.
2.Labor & raw material saving.
3.High daily production: 300 sqm possible increased.
4.High quality road finished.
5.The edging is made right away, so no cutting work afterwards!
6.Several elements simultaneously processing possible.
7.Partially disabled employees productive again.
8.Short payback.
9.Simple operation.
10.Easy maintenance.
4.Operation process
1)Find out datum point as per request
2)Move paver laying machine to site
3)Install automatic control device as per baseline
4)Open control device and run machine for around 3m,align the machine body
5)Use 90 angle as datum ,pull the head line
6)Fix positioning rod as per the head line
7)nstall the brick guiding plate and road scale
8)Put down the scraping plate and adjust pad layer thickness
9)Adjust machine working speed,normally it is 4-8HZ
10)Feed paver as per the pattern and adjust size as per road width
11)Install brick feeding machine
12)Press start button on remote control to start working
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1994
Employee Number:
50~100
Ecer Certification:
Active Member
Shandong Gaifeng machinery CO.,LTD was founded in 1994,which was principally engaged in research development and manufacture of precise spare part in early stage.With innovative thinking, Gaifeng machinery focused on inventing paver laying machine since 2008.After three year’s hard exploration... Shandong Gaifeng machinery CO.,LTD was founded in 1994,which was principally engaged in research development and manufacture of precise spare part in early stage.With innovative thinking, Gaifeng machinery focused on inventing paver laying machine since 2008.After three year’s hard exploration...
Get in touch with us
Leave a Message, we will call you back quickly!