Payment Terms | T/T |
Supply Ability | About 35 Sets per month |
Delivery Time | 5 Weeks after 2D and 3D mould design confirmed |
Packaging Details | Custom wooden box |
Part Name | 20 degree gear |
Cavity | 1*4 |
Material | PA6+GF20 |
color | Black |
Runner | Cold Runner |
Gate | Pin gate |
Cavity steel | SKD51-HRC48~52 |
Core Steel | SKD51-HRC48~52 |
Insert Steel | SKD51-HRC48~52 |
Generial polishing | SPI-B3 |
Tolerance | +/-0.03 |
Brand Name | Forwa |
Model Number | Custom |
Certification | ISO9001 / ISO14001 / IATF16949 |
Place of Origin | China |
View Detail Information
Explore similar products
Factory Mass Production Injection Part Custom Plastic Parts With Injection Mould
Durable High Precision White And Black Color OA Connector Industrial Parts
Custom Precision OA Connector Industrial Plastic Mould Parts
High Precision Custom PC Raw Marterial OA Connector Industrial Parts Black Color
Product Specification
Payment Terms | T/T | Supply Ability | About 35 Sets per month |
Delivery Time | 5 Weeks after 2D and 3D mould design confirmed | Packaging Details | Custom wooden box |
Part Name | 20 degree gear | Cavity | 1*4 |
Material | PA6+GF20 | color | Black |
Runner | Cold Runner | Gate | Pin gate |
Cavity steel | SKD51-HRC48~52 | Core Steel | SKD51-HRC48~52 |
Insert Steel | SKD51-HRC48~52 | Generial polishing | SPI-B3 |
Tolerance | +/-0.03 | Brand Name | Forwa |
Model Number | Custom | Certification | ISO9001 / ISO14001 / IATF16949 |
Place of Origin | China | ||
High Light | 20 Degree Angle Gear Parts ,Robot Industry Gear Plastic Parts ,Plastic Injection Parts 20 Degree Gear |
20 degree angle gear for robot industry
Mould information
1.Mould standard | HASCO |
2.Mould type | 3 Plate |
3.Mould base steel | 1.1730 |
4.A/B plate steel | 1.2311 |
5.Core/Caviry steel | SKD51-HRC48~52 |
6.Runner type | SKD51-HRC48~52 |
7.Gate type | Pin gate |
8.Project name | Turning gear |
9.Part name | 20 Degree gear |
10.Material available | PA6+GF20 |
11.Shrinkage rate | 1.0065 |
12.Part color | Black / White / yellow / Nature |
13.Surface finishing | SPI-B3 |
14.Cycle time | 30s |
15.Injection machine | 90T |
16.Injection machine brand | Arburg / Fanuc / Haitian |
17.2D Mould structure | CAD Software (DWG, DXF Format) |
18.3D Mould structure | UG, Proe Software (Prt, X-T, stp, step, Igs, Format etc.) |
19.Mould folw report | CAD Mould flow (PPT format) |
20.Mould processing report | Update each week |
21.MOQ | 1 set |
22.Payment term | T/T |
23.Package | Custom Wooden box |
24.Deliverly date | 5 Weeks |
25.Mould number | According to customer requirement |
26.Mould life | 1 million shots |
Part Function:
The gear is to transfer direction to output the power.
FAQ
Q: How can you get the quotation?
When we get the detailed information during working days, we will provide you the quotation within 24 hours.
Please help to provide us the following information with your inquiry.
1) 2D Part drawing. (CAD or DXF format)
2) 3D Part drawing. (Prt, X-T, stp, step, Igs, Iges, Format etc.)
3) Mould cavity. (1*1 or 1*2 or 1*4 etc.)
3) Part Material. (Material requirement or Material date sheet)
4) Mould standard. (DME or HASCO or LKM)
5) Mould standard component. (DME or HASCO or MISUMI or LKM)
6) Mould Steel. (1.2344 or 1.2738H or NAK80 or 1.2767)
7) Part surface treatment. (General polishing or mirror polishing or VID3400-Ref# or Tuxture or SPI-#)
8) Quantity of plastic part. (per order / per month / annual)
9) Mould life.
10) Any special demands or requirements, such as packing, labels,delivery etc.
Q: What are the main oversea markets of Forwa?
1)Currently Forwa regular oversea customers are from the USA, the UK, Italy, Germany, France and India etc.
Q: How do we control the quality?
1). When getting the new order, Our team will open a meeting to analyze the part stucture and mould stucture carefully to ensure everyting is great.
2). Our team will review the mould design and improve it to ensure mould life and mould operation before start to build the mould.
3). The project team will follow each step mould processing to ensure the mould processing on time and the mould processing quality.
4). Our QC team will inspect all the mould components after each processing step finish and then go next step.
5). Our technical team will fit the mould carefully.
6). After the mould completed, our project team will check the mould operation before testing the mould.
7). Mould need to run about 3~4 hours during testing to ensure the mould operation.
8). The first sample inspected by QC and then provide the good samples to customer for testing.
9). During production, our IPQC will check the parts per 2 hours, ensure no any rejects;
10). FQC will check the products before sending to the warehouse;
11). 100% inspected by OQC before shipping out.
Q: What should we do if customer receive defective products?
1): If receive defective product, please send us the photos, we will feedback to our engineers and QC departments and solve the problems ASAP.
Q: How to pack the moulds and products?
1).For moulds, we will be coated one-layer anti-rust oil first,and then also will be covered thin films on the mould, finally pack into fumigation wooden case.
2).And as to products, we will pack into standard export cartons or as per customer’s request to pack.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
7 million-7.7 million
Employee Number:
120~170
Ecer Certification:
Active Member
Being the leading plastic mold maker in China, Forwa has been actively and sincerely striving to improve itself. And we have been doing a good job in mold making and plastic parts manufacturing and have much to its credit. Assembling of manufacturing, design, engineering and marketing, our c... Being the leading plastic mold maker in China, Forwa has been actively and sincerely striving to improve itself. And we have been doing a good job in mold making and plastic parts manufacturing and have much to its credit. Assembling of manufacturing, design, engineering and marketing, our c...
Get in touch with us
Leave a Message, we will call you back quickly!