Payment Terms | T/T |
Supply Ability | About 40 Sets per month |
Delivery Time | 40 days after 2D and 3D mould design confirmed |
Packaging Details | Custom wooden box |
Part Name | Main shaft |
Cavity | 1*8 |
Material | POM/PA6 |
color | White |
Runner | Hot runner (8pcs Open hot drops) |
Gate | Sub gate |
Cavity steel | S7 |
Core Steel | S7 |
Insert Steel | S7 |
Generial polishing | SPI-B1 |
Tolerance | +/-0.02 |
Brand Name | Forwa |
Model Number | Custom |
Certification | ISO9001 / ISO14001 / IATF16949 |
Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
Payment Terms | T/T | Supply Ability | About 40 Sets per month |
Delivery Time | 40 days after 2D and 3D mould design confirmed | Packaging Details | Custom wooden box |
Part Name | Main shaft | Cavity | 1*8 |
Material | POM/PA6 | color | White |
Runner | Hot runner (8pcs Open hot drops) | Gate | Sub gate |
Cavity steel | S7 | Core Steel | S7 |
Insert Steel | S7 | Generial polishing | SPI-B1 |
Tolerance | +/-0.02 | Brand Name | Forwa |
Model Number | Custom | Certification | ISO9001 / ISO14001 / IATF16949 |
Place of Origin | China | ||
High Light | PA6 Rotation Shaft ,SPI-B1 Rotation Shaft ,DME Mould Main shaft |
Rotation shaft part for automatic device , Main shaft , Main shaft is the key connector by the gear
Mould information
1.Mould standard | DME |
2.Mould type | 2 plate |
3.Mould base steel | S55C |
4.A/B plate steel | Chinese P20 |
5.Core/Caviry steel | S7 |
6.Runner type | Hot runner (8pcs Open hot drop turn into cold runner) |
7.Gate type | Sub gate |
8.Project name | Automatic device |
9.Part name | Main shaft |
10.Material available | POM / PA6 |
11.Shrinkage rate | 1.020 |
12.Part color | White / Nature / Black |
13.Surface finishing | SPI-B1 |
14.Cycle time | 45s |
15.Injection machine | 280T |
16.Injection machine brand | Arburg / Fanuc / Haitian |
17.2D Mould structure | CAD Software (DWG, DXF Format) |
18.3D Mould structure | UG, Proe Software (Prt, X-T, stp, step, Igs, Iges, Format etc.) |
19.Mould folw report | CAD Mould flow (PPT format) |
20.Mould processing report | Update each week |
21.MOQ | 1 set |
22.Payment term | T/T |
23.Package | Custom Wooden box |
24.Deliverly date | 40 days |
25.Mould number | According to customer requirement |
26.Mould life | 1.5 million shots |
Part Function:
The part is for connecting other 2 related parts, and turn them to make the device work.
So It is the important part. The tolerance requirement is tight and up to +/-0.02mm.
FAQ
Q: How can you get the quotation?
When we get the detailed information during working days, we will provide you the quotation within 24 hours.
Please help to provide us the following information with your inquiry.
1) 2D Part drawing. (CAD or DXF format)
2) 3D Part drawing. (Prt, X-T, stp, step, Igs, Iges, Format etc.)
3) Mould cavity. (1*1 or 1*2 or 1*4 etc.)
3) Part Material. (Material requirement or Material date sheet)
4) Mould standard. (DME or HASCO or LKM)
5) Mould standard component. (DME or HASCO or MISUMI or LKM)
6) Mould Steel.
7) Part surface treatment.
8) Quantity of plastic part. (per order / per month / annual)
9) Mould life.
10) Any special demands or requirements, such as packing, labels,delivery etc.
Q: What are the main oversea markets of Forwa?
1)Currently Forwa regular oversea customers are from the USA, the UK, Italy, Germany, France and India etc.
Q: How do we control the quality?
1). When getting the new order, Our team will open a meeting to analyze the part stucture and mould stucture carefully to ensure everyting is great.
2). Our team will review the mould design and improve it to ensure mould life and mould operation before start to build the mould.
3). The project team will follow each step mould processing to ensure the mould processing on time and the mould processing quality.
4). Our QC team will inspect all the mould components after each processing step finish and then go next step.
5). Our technical team will fit the mould carefully.
6). After the mould completed, our project team will check the mould operation before testing the mould.
7). Mould need to run about 3~4 hours during testing to ensure the mould operation.
8). The first sample inspected by QC and then provide the good samples to customer for testing.
9). During production, our IPQC will check the parts per 2 hours, ensure no any rejects;
10). FQC will check the products before sending to the warehouse;
11). 100% inspected by OQC before shipping out.
Q: What should we do if customer receive defective products?
1): If receive defective product, please send us the photos, we will feedback to our engineers and QC departments and solve the problems ASAP.
Q: How to pack the moulds and products?
1).For moulds, we will be coated one-layer anti-rust oil first,and then also will be covered thin films on the mould, finally pack into fumigation wooden case.
2).And as to products, we will pack into standard export cartons or as per customer’s request to pack.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
7 million-7.7 million
Employee Number:
120~170
Ecer Certification:
Active Member
Being the leading plastic mold maker in China, Forwa has been actively and sincerely striving to improve itself. And we have been doing a good job in mold making and plastic parts manufacturing and have much to its credit. Assembling of manufacturing, design, engineering and marketing, our c... Being the leading plastic mold maker in China, Forwa has been actively and sincerely striving to improve itself. And we have been doing a good job in mold making and plastic parts manufacturing and have much to its credit. Assembling of manufacturing, design, engineering and marketing, our c...
Get in touch with us
Leave a Message, we will call you back quickly!