China factories

China factory - FORWA PRECISE PLASTIC MOULD CO.,LTD.

FORWA PRECISE PLASTIC MOULD CO.,LTD.

  • China,Dongguan ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China SPI-B1 POM PA6 Rotation Shaft For Automatic Device
China SPI-B1 POM PA6 Rotation Shaft For Automatic Device

  1. China SPI-B1 POM PA6 Rotation Shaft For Automatic Device
  2. China SPI-B1 POM PA6 Rotation Shaft For Automatic Device
  3. China SPI-B1 POM PA6 Rotation Shaft For Automatic Device
  4. China SPI-B1 POM PA6 Rotation Shaft For Automatic Device

SPI-B1 POM PA6 Rotation Shaft For Automatic Device

  1. MOQ: 1 set
  2. Price: According to the mould requirement and mould cavity
  3. Get Latest Price
Payment Terms T/T
Supply Ability About 40 Sets per month
Delivery Time 40 days after 2D and 3D mould design confirmed
Packaging Details Custom wooden box
Part Name Main shaft
Cavity 1*8
Material POM/PA6
color White
Runner Hot runner (8pcs Open hot drops)
Gate Sub gate
Cavity steel S7
Core Steel S7
Insert Steel S7
Generial polishing SPI-B1
Tolerance +/-0.02
Brand Name Forwa
Model Number Custom
Certification ISO9001 / ISO14001 / IATF16949
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability About 40 Sets per month
Delivery Time 40 days after 2D and 3D mould design confirmed Packaging Details Custom wooden box
Part Name Main shaft Cavity 1*8
Material POM/PA6 color White
Runner Hot runner (8pcs Open hot drops) Gate Sub gate
Cavity steel S7 Core Steel S7
Insert Steel S7 Generial polishing SPI-B1
Tolerance +/-0.02 Brand Name Forwa
Model Number Custom Certification ISO9001 / ISO14001 / IATF16949
Place of Origin China
High Light PA6 Rotation ShaftSPI-B1 Rotation ShaftDME Mould Main shaft

Rotation shaft part for automatic device , Main shaft , Main shaft is the key connector by the gear

 

Mould information

1.Mould standard DME
2.Mould type 2 plate
3.Mould base steel S55C
4.A/B plate steel Chinese P20
5.Core/Caviry steel S7
6.Runner type Hot runner (8pcs Open hot drop turn into cold runner)
7.Gate type Sub gate
8.Project name Automatic device
9.Part name Main shaft
10.Material available POM / PA6
11.Shrinkage rate 1.020
12.Part color White / Nature / Black
13.Surface finishing SPI-B1
14.Cycle time 45s
15.Injection machine 280T
16.Injection machine brand Arburg / Fanuc / Haitian
17.2D Mould structure CAD Software (DWG, DXF Format)
18.3D Mould structure UG, Proe Software (Prt, X-T, stp, step, Igs, Iges, Format etc.)
19.Mould folw report CAD Mould flow (PPT format)
20.Mould processing report Update each week
21.MOQ 1 set
22.Payment term T/T
23.Package Custom Wooden box
24.Deliverly date 40 days
25.Mould number According to customer requirement
26.Mould life 1.5 million shots

 

Part Function:

The part is for connecting other 2 related parts, and turn them to make the device work.

So It is the important part. The tolerance requirement is tight and up to +/-0.02mm.

 

FAQ                                                              

Q: How can you get the quotation?

When we get the detailed information during working days, we will provide you the quotation within 24 hours.

Please help to provide us the following information with your inquiry.

 

1) 2D Part drawing. (CAD or DXF format)
2) 3D Part drawing. (Prt, X-T, stp, step, Igs, Iges, Format etc.)

3) Mould cavity. (1*1 or 1*2 or 1*4 etc.)
3) Part Material. (Material requirement or Material date sheet)

4) Mould standard. (DME or HASCO or LKM) 

5) Mould standard component. (DME or HASCO or MISUMI or LKM)

6) Mould Steel.
7) Part surface treatment.
8) Quantity of plastic part. (per order / per month / annual)

9) Mould life.
10) Any special demands or requirements, such as packing, labels,delivery etc.

 



Q: What are the main oversea markets of Forwa?
1)Currently Forwa regular oversea customers are from the USA, the UK, Italy, Germany, France and India etc.

 

Q: How do we control the quality?

1). When getting the new order, Our team will open a meeting to analyze the part stucture and mould stucture carefully to ensure everyting is great.
2). Our team will review the mould design and improve it to ensure mould life and mould operation before start to build the mould.

3). The project team will follow each step mould processing to ensure the mould processing on time and the mould processing quality.

4). Our QC team will inspect all the mould components after each processing step finish and then go next step. 

5). Our technical team will fit the mould carefully.

6). After the mould completed, our project team will check the mould operation before testing the mould.

7). Mould need to run about 3~4 hours during testing to ensure the mould operation.

8). The first sample inspected by QC and then provide the good samples to customer for testing.

9). During production, our IPQC will check the parts per 2 hours, ensure no any rejects;
10). FQC will check the products before sending to the warehouse;
11). 100% inspected by OQC before shipping out.



Q: What should we do if customer receive defective products?
1): If receive defective product, please send us the photos, we will feedback to our engineers and QC departments and solve the problems ASAP.

Q: How to pack the moulds and products?
1).For moulds, we will be coated one-layer anti-rust oil first,and then also will be covered thin films on the mould, finally pack into fumigation wooden case.
2).And as to products, we will pack into standard export cartons or as per customer’s request to pack.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2002

  • Total Annual:

    7 million-7.7 million

  • Employee Number:

    120~170

  • Ecer Certification:

    Active Member

Being the leading plastic mold maker in China, Forwa has been actively and sincerely striving to improve itself. And we have been doing a good job in mold making and plastic parts manufacturing and have much to its credit. Assembling of manufacturing, design, engineering and marketing, our c... Being the leading plastic mold maker in China, Forwa has been actively and sincerely striving to improve itself. And we have been doing a good job in mold making and plastic parts manufacturing and have much to its credit. Assembling of manufacturing, design, engineering and marketing, our c...

+ Read More

Get in touch with us

  • Reach Us
  • FORWA PRECISE PLASTIC MOULD CO.,LTD.
  • Haibin Industrial Zone,Shangsha , Chang'an Town, Dongguan city, China.
  • https://www.forwa-mould.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement