Payment Terms | L/C, T/T, Western Union |
Supply Ability | two sets per month |
Delivery Time | 30 days |
Packaging Details | Paper and Film, Wooden case |
Stirring cubage | 10m3 |
Whipping turning speed | 40r/min |
Utmost work pressure of oil jar | 12000Kg |
Total power | 16.7Kw |
Machine weight | 4500Kg |
Machine external size | L6000xW3850xH5300mm |
After-sales Service Provided | Engineers available to service machinery overseas |
Moulding tank | L2050xW1550xH1800mm (1PCS) (Automatic) |
Steam Boiler | 100Kg/H |
Materials feed-in adopt | compress equipment |
Brand Name | ZHMACH |
Model Number | ZHZS-10A/10B |
Certification | CE Certificate |
Place of Origin | Guangdong China (Mainland) |
View Detail Information
Explore similar products
EPE / EPS Foam Recycling Machine , Automatic Sponge Rebounded Foaming Machine
High Speed Automatic Recycled Foam Production Line With Steam for High Density
Fully Automatic EPS Foam Recycling Machine / Foam Rebonding Machine For Foam
15KW Foam Recycling Machinery / Waste Sponge Recycling Machine with Steam
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | two sets per month |
Delivery Time | 30 days | Packaging Details | Paper and Film, Wooden case |
Stirring cubage | 10m3 | Whipping turning speed | 40r/min |
Utmost work pressure of oil jar | 12000Kg | Total power | 16.7Kw |
Machine weight | 4500Kg | Machine external size | L6000xW3850xH5300mm |
After-sales Service Provided | Engineers available to service machinery overseas | Moulding tank | L2050xW1550xH1800mm (1PCS) (Automatic) |
Steam Boiler | 100Kg/H | Materials feed-in adopt | compress equipment |
Brand Name | ZHMACH | Model Number | ZHZS-10A/10B |
Certification | CE Certificate | Place of Origin | Guangdong China (Mainland) |
High Light | polystyrene recycling machine ,eps recycling machine |
Automatic Rebound Foam Production Line Repeated Production and Utilization of Waste
Product Description
This machine is mainly used to crushing foam has been mixed with glue, then through the mould, pressed by the hydraulics system, the corresponding density of the regeneration of sponges required. The machine has a stirring, mixing, compression molding a set of assembly line and production efficiency. Choose to use the automatic steam mould, the production efficiency 6 times.
[Specifications]
Model | QHZS-10A | QHZS-10B(with steam) |
Power | 15kw | 16.7kw |
Stirring cubage | 10m³ | 10m³ |
Stirring speed | 40r/min | 40r/min |
Pressure of oil jar | 12000kg | 12000kg |
Molding tanks | L2000×W1500×H1800mm(2pcs) | L2000×W1500×H1000mm(1pcs) |
System | without steam | with steam |
Operation | Automatic | Automatic |
The company has been honored as :
1. National High and New Technology Enterprise
3. Scientific and Technical Innovation Enterprise
4. Advantage of Growing Enterprise,
5. Intellectual Property Experimental Enterprise
6. Famous Brand
7. More than 300patents
Remark: The above only for reference. All the data is subjected to sold production.
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
We will try the best way to pack all the machine well and also save the freight cost.
Our Services
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1 engineer help to install the machine you must send someone to help about 2 days installation will finished and the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some pictures we will help to handle within 24hours.
The details:
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2015
Total Annual:
1500000-3000000
Employee Number:
20~50
Ecer Certification:
Verified Supplier
Dongguan Zehui machinery equipment co., ltd is professional mechanical Sponge machinery, Foam machine equipment, advanced equipment and strong technical force, brought together for many years sponge machine, foam machinery and Foam machine of valuable experience, learning from international adv... Dongguan Zehui machinery equipment co., ltd is professional mechanical Sponge machinery, Foam machine equipment, advanced equipment and strong technical force, brought together for many years sponge machine, foam machinery and Foam machine of valuable experience, learning from international adv...
Get in touch with us
Leave a Message, we will call you back quickly!