Supply Ability | One set per month |
Delivery Time | 45 days |
Packaging Details | Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ. |
conveyer belt speed | 0-8m/min |
Foam Width | 1.0-2.25m |
Oven Length | 18M |
Foam block cutter | Blade type and saw tooth type |
total output | 100-300kg/min |
Dinner coveyer length | 18m |
Fall plate | 7 section adjustable |
Foam Height | 1.0-1.25m |
side board adjustable width | 0.98-2.3m |
Brand Name | ZHMACH |
Model Number | ZFP-2017 |
Certification | CE Certificate |
Place of Origin | Guangdong China (Mainland) |
View Detail Information
Explore similar products
37KW Sponge Mattress Low Pressure Foam Machine For Hard / Soft Polyurethane Foam
Automatic Continuous Foaming Machine For Producing Flexible Polyurethane Foam
Continuous Automatic Low Pressure Foaming Machine with Glass Flow Meter
Full Automatic Low Pressure Foam Machine , Polyurethane Foam Production Line
Product Specification
Supply Ability | One set per month | Delivery Time | 45 days |
Packaging Details | Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ. | conveyer belt speed | 0-8m/min |
Foam Width | 1.0-2.25m | Oven Length | 18M |
Foam block cutter | Blade type and saw tooth type | total output | 100-300kg/min |
Dinner coveyer length | 18m | Fall plate | 7 section adjustable |
Foam Height | 1.0-1.25m | side board adjustable width | 0.98-2.3m |
Brand Name | ZHMACH | Model Number | ZFP-2017 |
Certification | CE Certificate | Place of Origin | Guangdong China (Mainland) |
High Light | low pressure polyurethane foam machine ,pu foam making machine ,Flexible Low Pressure Foam Machine |
Low Pressure Foam Machine , Flexible Polyurethane Foaming Machine Line
Product Description
We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.
[Specifications]
(1) The whole machine parts specifications:
1, Dimension:Total length 33m×Total width 4m×Total Height 3m
Roller ( 3 m)
2, Foaming material Group: 13 groups, man-machine interface, automatically computer control
3, Foaming width: 980mm~2250mm
4, Foaming height: Max 1200mm
5, Foaming density: 8Kg/m³~100kg/m³
6, Foaming speed: 2000r/min~7000r/min
7, Max total output:300kg/min
8, Material spraying way:
① The way of down sprayer head (upper, down, front, back can be adjusted)
② the way of trough overflow pipe.
9, Controlling way of foaming:
① PLC controlling, can continuously foaming two different formulas in one time
② All inverter controlling foaming and work in phase with the production line
③ Oven declining board height and width can be adjusted by control box.
④ Oven side links width can be adjusted by control box.
10, Mixing –head motor: 37kw
Gear pump types:
Model | Specification | Use material | Qty/set | Brand |
K124A | 200L/min | PPG | 1 | Viking Pump |
K124A | 200L/min | POP | 1 | Viking Pump |
L32 | 300L/min | CaCo3 | 1 | Viking Pump |
NB-80 | 120L/min | TDI | 1 | Shanghai |
NB-32 | 30L/min | MC | 1 | Shanghai |
NB-25 | 25L/min | Flame retardant | 1 | Shanghai |
GPY-6 | 6L/min | Si | 1 | Japan |
GPY-5.8 | 6L/min | A-33 | 1 | Japan |
GPY-5.8 | 6L/min | T9 | 1 | Japan |
GPY-11.5 | 8 L/min | H2O | 1 | Japan |
GPY-11.5 | 8 L/min | Colour1 | 1 | Japan |
GPY-11.5 | 8 L/min | Anti-yellow | 1 | Japan |
GPY-11.5 | 8 L/min | Black color | 1 | Japan |
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
1. We will help to design the layout of the machine that put in your factory.
2. We will send 2-4 experience engineers to install and testing the machines.
3. We will teach your engineer how to operate the machine and how to maintain the machines.
4. We will give you the machine operation manual and the best formulation for target products that you are going to make.
5. We will help to buy the best raw material for making the foam if you needed.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2015
Total Annual:
1500000-3000000
Employee Number:
20~50
Ecer Certification:
Verified Supplier
Dongguan Zehui machinery equipment co., ltd is professional mechanical Sponge machinery, Foam machine equipment, advanced equipment and strong technical force, brought together for many years sponge machine, foam machinery and Foam machine of valuable experience, learning from international adv... Dongguan Zehui machinery equipment co., ltd is professional mechanical Sponge machinery, Foam machine equipment, advanced equipment and strong technical force, brought together for many years sponge machine, foam machinery and Foam machine of valuable experience, learning from international adv...
Get in touch with us
Leave a Message, we will call you back quickly!