Payment Terms | L/C, D/P, Western Union, T/T, Credit card |
Supply Ability | 18000 sets per week |
Delivery Time | 10 days, subject to quantity negotiation |
Packaging Details | Plywood outer box with bubble bag or paper |
Detection System | Fire & Smoke Detectors |
Transport Package | Plywood Outer Box Or Wooden Case |
Operating Temperature | 0°C to 50°C |
Agent | FM200 (HFC-227ea) |
Actuation | Automatic or manual start |
Discharge Time | 10 seconds |
Usage | fire rescue system |
Standard Of Examination | GB25972-2010 |
Brand Name | Rongxiao |
Model Number | QMQ4.2/180W QMQ4.2/150W QMQ4.2/120W QMQ4.2/90W QMQ5.6/180W QMQ5.6/150W QMQ5.6/120W QMQ5.6/90W QMQ5.6/70W |
Certification | CAL,CMA,CNAS,,CCC |
Place of Origin | Guangzhou City, Guangdong Province, China |
View Detail Information
Explore similar products
FM200 Fire Control Protection Systems 70L - 180L Gas Suppression System
Commercial HFC-227ea FM200 Fire Suppression System With Efficient Extinguishing
Single Zone FM200 Gas Suppression System Fm200 Automatic Fire Extinguisher
Lightweight FM200 Fire Suppression System 5.6Mpa Pipe Network System Low
Product Specification
Payment Terms | L/C, D/P, Western Union, T/T, Credit card | Supply Ability | 18000 sets per week |
Delivery Time | 10 days, subject to quantity negotiation | Packaging Details | Plywood outer box with bubble bag or paper |
Detection System | Fire & Smoke Detectors | Transport Package | Plywood Outer Box Or Wooden Case |
Operating Temperature | 0°C to 50°C | Agent | FM200 (HFC-227ea) |
Actuation | Automatic or manual start | Discharge Time | 10 seconds |
Usage | fire rescue system | Standard Of Examination | GB25972-2010 |
Brand Name | Rongxiao | Model Number | QMQ4.2/180W QMQ4.2/150W QMQ4.2/120W QMQ4.2/90W QMQ5.6/180W QMQ5.6/150W QMQ5.6/120W QMQ5.6/90W QMQ5.6/70W |
Certification | CAL,CMA,CNAS,,CCC | Place of Origin | Guangzhou City, Guangdong Province, China |
High Light | 90L FM200 Fire Suppression System ,1800m3 FM200 Fire Suppression System |
Equipment technical performance parameters:
Temperature℃ | Pressure Mpa(20℃) | Power Supply | |||
design temperature | usage temperature | Fire extinguishing agent bottle group | Nitrogen-driven bottle group | Main electricity
| Standby power
|
0-50 | 0-50 | 0.3 | 13.5 | AC 220V | DC24V |
bottle group specifications and storage pressure
Bottle group name | Model specification (l) | Storage pressure (20℃) | ||||
Nitrogen start-up bottle group | 8 | 6Mpa | ||||
Nitrogen automatic bottle group | 70 | 13.5Mpa | ||||
Fire extinguishing agent bottle group | 70 | 90 | 120 | 150 | 180 | 0.3Mpa |
System maintenance and upkeep:
The daily maintenance and inspection of the HFC-227ea fire extinguishing system should be carried out by specially trained and qualified managers who are responsible for regular inspection, maintenance and management. Managers should be familiar with the performance, structure, action procedures, working status and technical regulations of the automatic fire extinguishing system, and be familiar with the methods of automatic control, manual control and mechanical emergency operation.
The specific contents of daily maintenance and upkeep include: checking and cleaning all equipment, checking and maintaining important equipment and pipelines, checking and maintaining system functions, checking the pressure status of pressure gauges, etc. And record the results of each inspection in detail. Equipment components that do not meet the requirements of the specifications should be replaced.
Emergency treatment of fire in gas extinguishing area:
1. When a fire occurs in the substation room, the fire is weak and controllable.
The on-duty personnel can immediately extinguish the fire with a fire extinguisher. And notify the central control room and the leadership department. (The distribution room is equipped with a fire telephone extension)
2. When a fire occurs in the substation room, the fire is large and spreads rapidly.
1. The on-duty personnel notify the on-duty personnel in the central control room of the fire and switch the alarm host to automatic state. The duty personnel in the duty room switch the gas fire extinguishing controller to the automatic state. Fire extinguishing is carried out through fire linkage. At the same time, the fire emergency plan of the property department is activated.
2. The duty personnel in the distribution room can directly press and hold the red "manual start" button on the gas fire extinguishing control panel, and start the fire extinguishing agent to extinguish the fire after a 30-second delay. Or use the emergency start and stop button to start the fire extinguishing agent to extinguish the fire. At the same time, the fire emergency plan of the property department is activated. (If the manual start fails, the mechanical emergency manual control method is used to start the fire extinguishing agent to extinguish the fire)
3. If the fire is serious and is not extinguished by the fire extinguishing agent. After notifying the central control room or the leadership department, the fire emergency plan is activated, and the scene is quickly left to cooperate with the evacuation of personnel and assist in fire fighting.
Company introduction:
Guangzhou Rongan Fire Protection Equipment Co., Ltd. is a professional manufacturer of fire protection facilities integrating R&D, production, design and sales services. The company has experts from the national fire protection industry standards committee and a group of professional technical service teams with more than ten years of experience in the fire protection industry, and will spare no effort to provide you with the most intimate and professional comprehensive technical solutions for fire protection engineering products. "Rongxiao" series products produced by the company have passed the national compulsory product certification and the national fixed fire extinguishing system inspection center, with reliable quality and stable performance, and the factory has passed the ISO9001 quality system certification.
Frequently asked questions:
Q1: Are you a manufacturer or a trading company? A1: We are manufacturers.
Q2: How long is the delivery time? A2:10 days, which can be negotiated according to the quantity.
Q3: How to deal with the fault? A3: During the warranty period, we will provide you with a remote emergency plan during working hours. During the free maintenance period, the company will replace spare parts or complete machines that have failed due to defects or quality problems free of charge.
Company Details
Business Type:
Manufacturer
Year Established:
2013
Total Annual:
6000000-8000000
Employee Number:
120~150
Ecer Certification:
Verified Supplier
The factory is a professional manufacturer of fire-fighting facilities integrating R&D, production, design and sales services. We are committed to the research and development of HFC-227ea (FM200), Novec1230 and inert gas products. The factory is a professional manufacturer of fire-fighting facilities integrating R&D, production, design and sales services. We are committed to the research and development of HFC-227ea (FM200), Novec1230 and inert gas products.
Get in touch with us