China factories

China factory - DONGGUAN YUYANG INSTRUMENT CO., LTD

DONGGUAN YUYANG INSTRUMENT CO., LTD

  • China,Dongguan ,Guangdong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Electrical Current Transformer Testing Equipments With Ac220v ± 10% Power Supply
China Electrical Current Transformer Testing Equipments With Ac220v ± 10% Power Supply

  1. China Electrical Current Transformer Testing Equipments With Ac220v ± 10% Power Supply
  2. China Electrical Current Transformer Testing Equipments With Ac220v ± 10% Power Supply
  3. China Electrical Current Transformer Testing Equipments With Ac220v ± 10% Power Supply
  4. China Electrical Current Transformer Testing Equipments With Ac220v ± 10% Power Supply

Electrical Current Transformer Testing Equipments With Ac220v ± 10% Power Supply

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Supply Ability 100 sets per month
Delivery Time 15 days
Packaging Details Plywood case
Keyword CT PT Testing Equipment
Test standard IEC60044-1, IEC60044-6, IEC60044-2, IEC60044-5, C57.13
Power supply AC220V±10%, 50/60Hz±10%
Display LCD touch screen
Memory capacity >1000 groups
Software English
Test object ct and pt
Warranty 1 Year
Brand Name YUYANG
Model Number CPT-2
Certification CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 100 sets per month Delivery Time 15 days
Packaging Details Plywood case Keyword CT PT Testing Equipment
Test standard IEC60044-1, IEC60044-6, IEC60044-2, IEC60044-5, C57.13 Power supply AC220V±10%, 50/60Hz±10%
Display LCD touch screen Memory capacity >1000 groups
Software English Test object ct and pt
Warranty 1 Year Brand Name YUYANG
Model Number CPT-2 Certification CE
Place of Origin China
High Light electrical test equipmentelectrical test kit

CT VT Testing Equipment for Current and Voltage Transformer Test

 

 

Testing for current transformer equipment:

1 Excitation curve and parameters test
2 Turns ratio test
3 Ratio and phase error test
4 Polarity mark check
5 Winding resistance measurement
6 Secondary loop burden measurement
7 Error line curve test for protection CT
8 Transient CT parameters test
9 CT nameplate guess
10 Saturation hysteresis loop curve measurement

 

Testing for Voltage Transformer equipment

1 Turns ratio test
2 Ratio error and phase angle error test
3 Polarity test
4 Secondary burden test
5 Winding resistance test

 

Applications of CT/ VT Testing Equipment:

1 CT nameplate check
2 CT parameters check in work burden
3 CT transient parameters analysis
4 CT ratio and phase error calibration
5 VT routine test

 

Specifications:

Item Name CT and VT Testing Equipment
Test standards IEC60044-1, IEC60044-6, IEC60044-2, IEC60044-5, C57.13
Power supply AC220V±10%, 50/60Hz±10%
Voltage output 0.1~180V (AC)
Current output 0.001~5A(RMS)
Power output 500VA
Max. knee voltage measurement 45KV
Current measurement
 
Range 0~10A (automatically change range in 0.1/0.4/2/10A)
Error <±0.1%+0.01%FS

 

Voltage measurement Range 0~200V (automatically change range in 1V/10V/70V/200V)
Error < ±0.1%+0.01%FS
Turns ratio measurement Range 1~35000
1~2000, error<0.05%
2000~5000,error<0.1%
5000~35000,error<0.2%
Phase measurement error ±2min
resolution 0.01min
Winding resistance measurement
 
Range 0~8kΩ (automatically change range in2ohm/20ohm/80ohm/800ohm/8kohm)
Error < 0.2%RDG+0.02%FS
Maximum resolution : 0.1mΩ
Temperature measurement -50~100 Celsius degree; error<3 Celsius degree
CT Secondary burden Range 0~160ohm (automatically change range in 2ohm/20ohm/80ohm/160ohm)
Error <0.2%RDG+0.02%FS
Maximum resolution : 0.001ohm


PT Secondary burden
Error 0~80kohm (automatically change range in 800ohm/8kohm/80kohm)
Maximum <0.2%RDG+0.02%FS
resolution 0.1ohm

PT ratio measurement

Range
1~35000
1~10000 error<0.1%
10000~35000 error<0.2%
PT ratio error measurement :Typical error<0.05%,
Maximum Error<0.1%
PT phase angle measurement maximum error < 3min
Make evaluation for test results according to selected standards
Make word report for test result
Make word reports one time for multi-group test records on the PC
Calculate the ratio errors and phase angle errors at rated burden and working burden in one time test
Compare excitation curves with saved excitation curves in the same window
Memory capacity >1000 groups test results
Working condition temperature -10℃~50℃; moist ≤90%

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company

  • Year Established:

    2007

  • Total Annual:

    $ 1 Million-$ 2 Million

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

YUYANG INDUSTRIAL CO., LIMITED (DONGGUAN YUYANG INSTRUMENT CO.,LTD) is Located in Wangjiang District (Dongguan City ,Guangdong Province, China),a famous historical town with prosperous industry and convenient transportation. We are a high-tech enterprise which is specialized in developing ... YUYANG INDUSTRIAL CO., LIMITED (DONGGUAN YUYANG INSTRUMENT CO.,LTD) is Located in Wangjiang District (Dongguan City ,Guangdong Province, China),a famous historical town with prosperous industry and convenient transportation. We are a high-tech enterprise which is specialized in developing ...

+ Read More

Get in touch with us

  • Reach Us
  • DONGGUAN YUYANG INSTRUMENT CO., LTD
  • B1505, FORTUNE PLAZA, No.1, Yuanmei Road, Nancheng District, Dongguan City, Guangdong Province, China
  • https://www.flammabilitytestingequipment.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement