Payment Terms | L/C, T/T |
Supply Ability | 10 sets per month |
Delivery Time | 40-60 work days |
Packaging Details | Standard export packaging |
Key Word | 16mm - 63mm PE Pipe Machine |
Voltage | 380V 50HZ 3Phase(Customized) |
Plastic processed | PE |
Application | Pipe |
Warranty | 1 Year |
Capacity | 150-200kg/h |
After-sales service provided | Engineers available to service machinery overseas,Field installation,commissioning and training,Video technical support,Online support |
Brand Name | SHENZHEN HYPET |
Model Number | HYPE-63 |
Certification | CE,ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
PVC Pipe Making Machine / Plastic Pipe Extrusion Line 200 - 400mm
UPVC Pipe Making Machine With Parallel Twin Screw Extruder
Plastic Water Pipe Making Machine / PVC Sewage Pipe Extrusion Machine
CPVC Pipe Making Machine / PVC Pipe Extrusion Line Four Strands Type
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10 sets per month |
Delivery Time | 40-60 work days | Packaging Details | Standard export packaging |
Key Word | 16mm - 63mm PE Pipe Machine | Voltage | 380V 50HZ 3Phase(Customized) |
Plastic processed | PE | Application | Pipe |
Warranty | 1 Year | Capacity | 150-200kg/h |
After-sales service provided | Engineers available to service machinery overseas,Field installation,commissioning and training,Video technical support,Online support | Brand Name | SHENZHEN HYPET |
Model Number | HYPE-63 | Certification | CE,ISO9001 |
Place of Origin | China | ||
High Light | 63mm PE Pipe Making Machine ,16mm PE Pipe Making Machine |
High Speed HDPE Pipe Extrusion Line 16mm - 63mm PE Pipe Making Machine
Production line composition
HYPET unique advantages Except the same features with other supplier.
SN | Items | Specification |
1 | High output | Ensure you the highest output as compared with others |
2 | New technology gear box | High torque gear box |
3 | Screw and barrel | Bi-metal material ensure you longer working life, ensuring 24months |
4 | Electric elements and box | In detachable, with world famous brand such as ABB, Siemens, Schneider, Delta, well organized. |
5 | HYPET PLC control system | With operation easy, management full, energy saving and counting, and intelligent control system |
6 | Pipe brighten device | To make the pipe shining and smoothing |
7 | Vacuum tank 304 stainless | Water level and temperature controlled automatically |
8 | Chipless cutter | In new device for cutting pipe to save the material |
Technical features of whole line
SN | Specification | Description | Remark |
1 | Suitable material | PE pellets | |
2 | Pipe diameter range | 16~63mm | |
3 | Production speed | 1.5~15 m/min | |
4 | Max. output | 130kg/h | |
5 | Test and accept | Based on HYPET standard formula. | |
6 | Center height | 1,050±50mm | |
7 | Whole line size (L x W x H) | 38,000x1,400x 2,300 mm | |
8 | Operation direction | From right to left | |
9 | Color of equipment | HYPET white color | |
10 | Control of whole production | Refer to the “configuration list”. | |
Note | Extrusion capacity will be changed according the processing material and working conditions |
2. Circumstances condition
SN | Condition | Specification | Description |
1 | Natural circumstance condition | Working place | Indoor use |
Power source | No dangerous area | ||
Humidity | 55%~85% no condensation | ||
Temperature | 0~40 ℃ | ||
2 | Electricity source | Installation capacity | 200 kW |
Actual power consumption | 35 kW | ||
Power supply | 3P+N+PE | ||
Voltage/Frequency | 380V/50Hz, other can be option | ||
3 | Cooling water | Temperature | ≤15 ℃ |
Water pressure | ≥0.3MPa | ||
Flow | ~15 m3/h | ||
4 | Air condition | Compressor air pressure | ≥0.6MPa |
Flow | ~0.9 m3/min |
Terms & conditions
1. Time of delivery
1) When the contract becomes valid, the machine should be delivered within 45 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.
2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.
2. Guarantee clause
1) Guarantee is 1 year (excluding human factor and wearing parts).
2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.
Company Details
Business Type:
Manufacturer
Year Established:
2002
Total Annual:
500000-10000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Located in Shenzhen City which is the most lively and youngest top city in China, it's next to HongKong and Guangzhou City. Shenzhen HYPET founded in 2002, and it inherits from China national extrusion machinery entrerprise... Located in Shenzhen City which is the most lively and youngest top city in China, it's next to HongKong and Guangzhou City. Shenzhen HYPET founded in 2002, and it inherits from China national extrusion machinery entrerprise...
Get in touch with us
Leave a Message, we will call you back quickly!