China factories

China factory - Guangzhou Zhongxing Seiko Machinery Engineering Co., Ltd

Guangzhou Zhongxing Seiko Machinery Engineering Co., Ltd

  • China,Guangzhou
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China GT3267 2674A091 2674A099 Turbocharger Supercharger 2674A335 For Perkins Engine
China GT3267 2674A091 2674A099 Turbocharger Supercharger 2674A335 For Perkins Engine

  1. China GT3267 2674A091 2674A099 Turbocharger Supercharger 2674A335 For Perkins Engine

GT3267 2674A091 2674A099 Turbocharger Supercharger 2674A335 For Perkins Engine

  1. MOQ: 1 PC
  2. Price: Negotiable
  3. Get Latest Price
Packaging Details Carton Box Or As You Required
Part Name Turbocharger
Model Number: GT3267
Part Number: 2674A091 2674A099 2674A335
Application: Perkins Engine 1006
Item Condition: 100% New
Stock: Available
Brand Name Zhongxing
Model Number GT3267
Certification OEM
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Packaging Details Carton Box Or As You Required Part Name Turbocharger
Model Number: GT3267 Part Number: 2674A091 2674A099 2674A335
Application: Perkins Engine 1006 Item Condition: 100% New
Stock: Available Brand Name Zhongxing
Model Number GT3267 Certification OEM
Place of Origin China
High Light 2674A099 Turbocharger Supercharger2674A335 Turbocharger SuperchargerGT3267 Excavator Engine Parts

GT3267 2674A091 Turbocharger 2674A099 Supercharger 2674A335 for Perkins Engine 1006

Model Name:

Turbocharger

Model Number:

GT3267

Part Number

2674A091 2674A099 2674A335

Used For:

Perkins Engine 1006

Packing:

Neutral

 

Quick Details:

 

What happens if your turbo is too big?
A bigger turbo means more power: Not always. Most of the time, a turbo that's too big will lead to all sorts of trouble, including the inability to spool up and less power than what you started with.

 

What happens when a turbo spins too fast?
Overspeeding can push the turbo beyond its safe operating parameters, causing it to fail by damaging the turbine or compressor wheels and bearings. If the turbo continues to overspeed, it can overboost the engine, resulting in serious damage to the internal components and potentially complete engine failure.

 

Shipping way suggested

 

Ship by express like TNT/ Fedex/ DHL/ UPS for light and small size products
Ship by sea or by railway for heavy and big size products

We will choose the suitable shipping way according to your order, and welcome to use your own forwarder.

 

FAQ

 

Q : Which countries have you exported?
A :ASIA: Iraq, UAE, Thailand, Malaysia, Indonesia, Vietnam, Bangladesh, Kuwait, Lebanon
EUROPE: Russia, Kazakhstan, Greece, Norway, Ireland
OCEANIA: Australia, Fiji, Kiribati, New Caledonia
AMERICAS: USA, Canada, Jamaica, Brazil, Peru, Chile,
AFRICA: Angola, South Africa, Kenya, Tanzania, Zambia, Sudan, South Sudan, Egypt, Algeri, Nigeria

Q: When can you deliver after sending deposit?
A :It depends on your order quantity, if we have stock then need about 1-2 working days get it ready, if no stock we will start to produce when the deposite received. Usually it takes 15-60 days for different items.

 

Q: How do you pack the goods?
A :We have 16 years experience on export, finished products will be carefully handled in our standard export packing or in your required packing.

 

Q: How can I know the status of my order?
A :We will keep you udpated about the process

 

We Offer All Parts for Different Brands Excavator:

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2004

  • Total Annual:

    2000000-3000000

  • Ecer Certification:

    Active Member

Who we are: Guangzhou Zhongxing Seiko Machinery Engineering Co., Ltd is located in Guangzhou, we are a professional supplier for all kinds of excavator parts with near 20 years experience. We have 3 shops, 1 office, 1 warehouse and 1 reparing factory. Also, we have seperate departments for whol... Who we are: Guangzhou Zhongxing Seiko Machinery Engineering Co., Ltd is located in Guangzhou, we are a professional supplier for all kinds of excavator parts with near 20 years experience. We have 3 shops, 1 office, 1 warehouse and 1 reparing factory. Also, we have seperate departments for whol...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Zhongxing Seiko Machinery Engineering Co., Ltd
  • No.21 A Building Donghuan Road, Zhucun Tianhe District, Guangzhou
  • https://www.excavatormachinery-parts.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement