Payment Terms | T/T |
Supply Ability | 5 Sets Per Month |
Delivery Time | 60 Days |
Packaging Details | Export packing |
Rain spray intensity | 5-12mm±1mm/min |
Nozzle spray pressure | 69-150kPa±10 kPa |
Flow rate | 0-100m3/h |
Nozzle type | Stainless-steel nozzle |
Water pump | Centrifugal pipeline pump |
Drying method | Air cooling drying |
UUT | Commercial vehicles |
Puporse | Water tightness test |
Brand Name | Sinuo |
Model Number | SNQC1001 |
Certification | Calibration Certificate (Cost Additional) |
Place of Origin | China |
View Detail Information
Explore similar products
DIN 75220 Electric Vehicle Solar Simulation Test Chamber Halogen Lamp Test
EV Electric Vehicle Testing Equipment Motor Vehicle Performance Test
EVSE Slow Fast Charging Electrical Safety Testing Equipment Power Battery REESS
DIN 75220 Electric Vehicle Testing Equipment Spectrum Solar Simulation Radiation
Product Specification
Payment Terms | T/T | Supply Ability | 5 Sets Per Month |
Delivery Time | 60 Days | Packaging Details | Export packing |
Rain spray intensity | 5-12mm±1mm/min | Nozzle spray pressure | 69-150kPa±10 kPa |
Flow rate | 0-100m3/h | Nozzle type | Stainless-steel nozzle |
Water pump | Centrifugal pipeline pump | Drying method | Air cooling drying |
UUT | Commercial vehicles | Puporse | Water tightness test |
Brand Name | Sinuo | Model Number | SNQC1001 |
Certification | Calibration Certificate (Cost Additional) | Place of Origin | China |
High Light | Passenger Car Rain Test Chamber ,Bus Rain Test Chamber ,Commercial Vehicle Rain Test Chamber |
Commercial Vehicle Rain Test Chamber Water Spray Booth for Bus Passenger Car
Complied Standards & Clauses
QC/T 476-2007 "Limits and test methods for rainproof sealing of passenger cars";
GB 29753-2013 "Safety requirements and test methods for refrigerated trucks for road transport of food and biological products";
Product Overview
The purpose of this test is to evaluate the vehicles' ability to prevent rainwater penetration and its rainproof performance during or after exposure to rainfall. The test will examine the proper installation of the windows and sunroofs, the reliability of their seals, and the correctness of their installation methods.
The rain test chamber is equipped with the following key systems:
Technical Parameters
Equipment function | Used for water tightness test of commercial vehicles |
Power supply | AC three-phase 380V±5% 50Hz |
Nozzle spray pressure | 69-150kPa±10 kPa |
Pressure gauge | Install a pressure gauge at the outlet of the water pump,range:0-0.5 MPa |
Flow meter | Install a flow meter after the outlet flow regulating valve of the water pump |
Flow rate | 0-100m3/ |
Branch pipe | Stainless steel pipes are used for sprinkler branches, with a pipe diameter of 32mm. |
Main pipe | All sprinkler pipes are made of stainless steel 304 pipe; the inner diameter of the water pump suction pipe is 80mm, the inner diameter of the water pump water supply main pipe top is 80mm, and the inner diameter of the water supply main pipe on both sides from the water pump outlet to the bottom of the flow meter is 80mm. |
Rain intensity | The average rain intensity of the side and top of the vehicle body is 5-12mm±1mm/min |
Details
The whole spray system is mainly composed of pipes, nozzles, valves, filters, pumps, display devices, etc.
Pipes:
Nozzles:
The drying room is for cool air drying. The blowing pipes are arranged along the top and both sides of the entity. The interior is made of stainless steel. To ensure the drying effect, the air outlet has a certain pressure. It meets the drying needs of existing car models. The external air duct is made of 1.5 stainless steel plate. The wind outlet is made of 1.5 stainless steel plate, and is equipped with a damper adjustment.
The maximum height of the drying air outlet is 2800mm, and the minimum distance of the side air outlet is greater than 2600mm.
The fans are centrifugal fans of Dehui and Nantong. The scheme design and fan selection are carried out according to two blowing. Ensure that the blow-drying fan is placed on the top of the room. The electrical equipment is well protected from moisture and moisture, and Party B provides ladders and lighting for maintenance. To facilitate troubleshooting, a separate pedestrian safety door for maintenance is set at the drying area.
The drying room has good sound insulation. The noise is no more than 75 decibels 1 meter away from the drying room. To ensure the soundproofing effect of the drying room, the room body adopts a double-layer galvanized plate structure. The outer plate is 0.8mm thick and punched inside. The middle interlayer is a 100mm thick rock wool plywood. The interlayer design is reasonable to ensure that the cotton compound does not leak or return moisture.
Company Details
Business Type:
Manufacturer
Year Established:
2019
Employee Number:
<100
Ecer Certification:
Verified Supplier
Sinuo Testing Equipment Co., Limited established in 2019, but Sinuo has rich experience in manufacturing test euipment, test system and offering overall laboratory construction of electronic and electrical products. Sinuo's main products include electrical vehicle te... Sinuo Testing Equipment Co., Limited established in 2019, but Sinuo has rich experience in manufacturing test euipment, test system and offering overall laboratory construction of electronic and electrical products. Sinuo's main products include electrical vehicle te...
Get in touch with us
Leave a Message, we will call you back quickly!