Payment Terms | T/T |
Supply Ability | 10 Sets Per Month |
Delivery Time | 30 Days |
Packaging Details | Export packing |
Inner chamber effective capacity | 2m³ |
Air flow rate | 1.5 m/s |
Product vacuum degree | ≤60KPa |
Dust concentration | 2~4kg/m3 |
Dust composition | Talcum powder |
Air flow meter | Digital flow meter |
Inner chamber sizes | 2000*1000*1000mm(W*D*H) |
External chamber sizes | 2400*1500*1900 mm(W*D*H) |
Brand Name | Sinuo |
Model Number | SN441-2000L |
Certification | Calibration Certificate (Cost Additional) |
Place of Origin | China |
View Detail Information
Explore similar products
DIN 40050-9 High Pressure Water Ingress Testing Equipment IPX6K IPX9K Jet Nozzle
IPX1 IPX2 Water Ingress Testing Equipment Vertical Rain Drip Box IEC 60529
IPX1 IPX4 Water Ingress Testing Equipment Rain Spray IP Code Test Chamber IEC
IPX3 IPX6 Water Spray Test Chamber Jet Nozzle IP Code Testing Chamber
Product Specification
Payment Terms | T/T | Supply Ability | 10 Sets Per Month |
Delivery Time | 30 Days | Packaging Details | Export packing |
Inner chamber effective capacity | 2m³ | Air flow rate | 1.5 m/s |
Product vacuum degree | ≤60KPa | Dust concentration | 2~4kg/m3 |
Dust composition | Talcum powder | Air flow meter | Digital flow meter |
Inner chamber sizes | 2000*1000*1000mm(W*D*H) | External chamber sizes | 2400*1500*1900 mm(W*D*H) |
Brand Name | Sinuo | Model Number | SN441-2000L |
Certification | Calibration Certificate (Cost Additional) | Place of Origin | China |
High Light | 2000L Sand And Dust Test Chamber ,2m3 Sand And Dust Test Chamber |
GOST 14254 Electronic Products Test 2m³ Sand And Dust Test Chamber 2000L
Complied Standards & Clauses
The sand and dust test chamber is designed and manufactured according to IEC60529 Fig 2 IP5X and IP6X, GOST 14254-2015 figure 8 and etc.
Product Overview
1. There is a funnel on each side of the interior, with a capacity of 6 kg of powder. The middle flat adopts a dust brush structure, and the dust is brushed into the funnels on both sides through the dust brush structure.
2. There is a dust rotating and feeding device at the air inlet end of the studio to meet the needs of blowing dust.
3. The circulating air duct is equipped with a heating and dehumidification device.
4. There is an observation window on the door. The test box has double doors and is sealed with double-layer aging-resistant silicone rubber.
5. The outer wall material of the test room and the cyclonic air duct is high-strength double-sided galvanized steel plate with surface fine powder paint, the inner wall is processed and formed by SUS304 stainless steel plate, and the frame is 10# square tube anti-rust treatment and sprayed.
6. The temperature control adopts an intelligent controller with 7” touch screen.
Technical Parameters
| |
1.1 Inner chamber effective capacity | Approx. 2m³ |
1.2 Inner chamber sizes | 2000*1000*1000mm(W*D*H) |
1.3 External chamber sizes | Approx. 2400*1500*1900 mm(W*D*H) |
2. Function parameters | |
2.1 Working room temperature | RT+10℃~+70℃ |
2.2 Product vacuum degree | ≤60KPa |
2.3 Dust composition | Talcum powder |
2.4 Dust particle composition | Dry talc that can pass through a square mesh sieve with a mesh size of 75µm and a wire diameter of 50µm Additional 32 μm and 250 μm sieves will be offered |
2.5 Dust concentration | 2~4kg/m3 |
2.6 Air flow meter | Digital flow meter |
2.7 Air flow rate | 1.5 m/s (Adjustable range: 0 ~ 4.99 m/s) |
2.8 Time Control | Dust blowing control cycle: 1s ~ 99h (adjustable), test time: 1s ~ 99h (adjustable), vibration time: 1S ~ 99H (adjustable) |
2.9 Metal Screen | Nominal wire diameter: ≥50μm, standard spacing between wires: ≥75μm. |
2.10 Sand and dust air circulation device | The circulating air duct and high-power mixed flow fan have an exhaust volume of 80 times the volume of the sample’s shell, and the exhaust speed does not exceed 60 times the volume of the shell per hour. The air flow speed can make the dust evenly distributed in the test chamber. The air flow in the test chamber is mainly vertical airflow from top to bottom, rather than laminar flow. |
2.11 Sample rack | 2 pcs -The presence of one shelf with the possibility of installation at different heights, made of perforated stainless steel panels with a load capacity of at least 50 kg -Metal panel of the floor of the test compartment, must provide a load capacity of at least 200 kg |
2.12 Dust drying system | The equipment is equipped with a dust drying and heating device. There is a heating button on the controller control screen. When the dust is found to be a little damp during the test, the heating button on the control screen can be turned on to start the dust heating device to dry the dust. The button can be turned off after the dust is dry. The drying process will not affect the test process, effectively ensuring the dust concentration in the test chamber and the accuracy of the test data. |
2.13 Dust replacement method | Manually change dust, dust can be easily replaced at any time |
Details
Company Details
Business Type:
Manufacturer
Year Established:
2019
Employee Number:
<100
Ecer Certification:
Verified Supplier
Sinuo Testing Equipment Co., Limited established in 2019, but Sinuo has rich experience in manufacturing test euipment, test system and offering overall laboratory construction of electronic and electrical products. Sinuo's main products include electrical vehicle te... Sinuo Testing Equipment Co., Limited established in 2019, but Sinuo has rich experience in manufacturing test euipment, test system and offering overall laboratory construction of electronic and electrical products. Sinuo's main products include electrical vehicle te...
Get in touch with us
Leave a Message, we will call you back quickly!