China factories

China factory - SHANGHAI SUNNY ELEVATOR CO.,LTD

SHANGHAI SUNNY ELEVATOR CO.,LTD

  • China,Shanghai ,Shanghai
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Landing Door Sill Assemble For 2 Leafs Center Opening Landing Door Device
China Landing Door Sill Assemble For 2 Leafs Center Opening Landing Door Device

  1. China Landing Door Sill Assemble For 2 Leafs Center Opening Landing Door Device
  2. China Landing Door Sill Assemble For 2 Leafs Center Opening Landing Door Device
  3. China Landing Door Sill Assemble For 2 Leafs Center Opening Landing Door Device
  4. China Landing Door Sill Assemble For 2 Leafs Center Opening Landing Door Device

Landing Door Sill Assemble For 2 Leafs Center Opening Landing Door Device

  1. MOQ: 1 Pcs
  2. Price: $500~1200
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 5000pcs/month
Delivery Time 7~15 days
Packaging Details in Carton Box
Name Landing Door Sill Assemble
Product name Landing Door Sill Assemble
Packing Wooden box
Business type manufacturer
Warranty time 12 Months
Transportation Sea Delivery
Original CHINA
Category elevator parts
Model Landing Door Sill Assemble
Type Landing Door Sill Assemble
Product Landing Door Sill Assemble
Brand Name SUNNY
Model Number Landing Door Sill Assemble
Certification CE,ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 5000pcs/month
Delivery Time 7~15 days Packaging Details in Carton Box
Name Landing Door Sill Assemble Product name Landing Door Sill Assemble
Packing Wooden box Business type manufacturer
Warranty time 12 Months Transportation Sea Delivery
Original CHINA Category elevator parts
Model Landing Door Sill Assemble Type Landing Door Sill Assemble
Product Landing Door Sill Assemble Brand Name SUNNY
Model Number Landing Door Sill Assemble Certification CE,ISO9001
Place of Origin China
High Light Elevator Landing Door Sill2 Leafs Lift Landing SillCenter Opening Landing Door Sill Assemble

Landing Door Sill Assemble Use For 2-Leafs Center Opening Landing Door Device

 

 
Landing door alu sill assemble(55B)
 
Features
Use for 2-leafs center
opening landing door device
 
Landing door alu sill assemble(60)
 
 
Features
Use for 2-leafs center
opening landing door device
 
 
Landing door composite sill assemble(55A)
 
Features
Use for 2-leafs center opening
landing door device
With hook groove,anti falling device
 
 
Landing door composite sill assemble(55D)
 
Features
Use for 2-leafs center opening
landing door device
 

 

 

 

 

FAQ
1. Are the elevator wire ropes durable?
The elevator wire rope has special provisions and requirements. Configuration is not only for wire rope and rated load, but also considered the size of the traction, as a result, the tensile strength of wire rope is greater than the weight of the lift. The safety factor is equipped with more than four wire rope. So it won’t break at the same time.
2. Is it dangerous for power failure suddenly during the elevator running?
If it occurs, the elevator will automatically stop due to the electrical and mechanical safety device. In case of power failure,elevator brakes will automatically taken. In addition, the power supply departments such as planned outage, prior notice are also operating.
3. Will us be hurt when it closed suddenly?
In the closing process, if people touch the hall door, the door of elevator will automatically restart without any danger. With anti clamping switch, once the gate touched, this switching action make the elevator unable to be closed and even reopened. In addition, closing force is also available here.
4. How the elevator running?
Elevators are operated with a counterweight wire rope through the (tractor) traction drive, making ups and downs on the guide rail.
5. Is the escalator installation complicated?
We believe the functions of an escalator are not necessarily proportional to the operation complexity. Therefore, escalators designed by us apply an integrated structure, so that the equipment is more precise and more efficient and allows easier and more convenient commissioning.
6. Do you have any cerifications?
Yes, we do with ISO9001 / CCC / CE Certificates for u.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1992

  • Total Annual:

    3,000,000-5,000,000

  • Employee Number:

    100~150

  • Ecer Certification:

    Verified Supplier

We offer 3 year quality guarantee for all products. Our main products are: Elevator Buttons, Elevator Light Curtain, Photoelectric Switch, Elevator Display, COP & LOP, Traction Machine, Door Mechanism. And we provide best prices on: Guide Rail, Guide Shoe, Co... We offer 3 year quality guarantee for all products. Our main products are: Elevator Buttons, Elevator Light Curtain, Photoelectric Switch, Elevator Display, COP & LOP, Traction Machine, Door Mechanism. And we provide best prices on: Guide Rail, Guide Shoe, Co...

+ Read More

Get in touch with us

  • Reach Us
  • SHANGHAI SUNNY ELEVATOR CO.,LTD
  • 5 Floor, Building 26, No. 1555 West Jinshajiang Road, Jiading District, Shanghai
  • https://www.elevator-component.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement