Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 10000pieces PER MONETH |
Delivery Time | within 30 days |
Packaging Details | Packed in carton with foam shipped with other kits |
Rated voltage | 48-96V |
Color | SILVER/BLACK |
MOQ | 1 piece |
Warranty | 24 months |
Mosfet | 9 |
Brand Name | SURINGMAX |
Model Number | KUNTENG |
Certification | CE EN15194 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Suringmax Electric Bike Spare Parts 5 In 1 Waterproof Connection Cable For Motor
High Performance Bicycle Disk Brakes For Front Wheel 160mm Diameter
Aluminum Material Electric Bike Spare Parts Disk Brake For Rear Wheel 140mm
14-28T 7 Speed Freewheel Cassette For Sprocket Bike Gear Speed Ring
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 10000pieces PER MONETH |
Delivery Time | within 30 days | Packaging Details | Packed in carton with foam shipped with other kits |
Rated voltage | 48-96V | Color | SILVER/BLACK |
MOQ | 1 piece | Warranty | 24 months |
Mosfet | 9 | Brand Name | SURINGMAX |
Model Number | KUNTENG | Certification | CE EN15194 |
Place of Origin | CHINA | ||
High Light | ebike brake sensor ,e bike accessories and parts |
Specifications of our controller
In order to better play the controller's performance and product stability, all of our controllers use imported power transistors.
Voltage | 36-72v | Current | 17-25A |
Color | silver/black | Mosfet | 9 |
Model | KUNTENG | Type | Brushless Electric Vehicle Controller |
Basic functions: phase line, Hall line, instrument, twist throttle, anti-theft, three-speed, high-level brake, low-level brake, self-repair, cruise, reverse, etc.
Features:
Driving quiet, no noise, people get a comfortable enjoyment in driving;
The starting torque is large and the starting acceleration is faster.
Our other products
We also product motor and matched kit like display PAS, battery, etc.
About our company
Authoritative certificate guarantees quality and considerate service makes you worry-free
FAQ:
1.Can we place a small order before the batch order?
--Yes .
2.Do you have stocks for a quick order?
--We only have some for the spare parts like throttle and brakes
Cause the controller and Motor belongs to the OEM products, different customers have the different request.
3.What is the estimate prepare time?
Motors: 3-15 days .
Battery /Controllers: 25-35 days.
Other spare parts: 10-20 days.
4.Do you provide any OEM?
Yes, we can design motor for some special request.
5.What is the guarantee?
3 years for motor.2 years for battery, 1 year for the other spare parts
Company Details
Business Type:
Manufacturer,Trading Company,Seller
Year Established:
2016
Total Annual:
400-600
Employee Number:
20~30
Ecer Certification:
Active Member
Changzhou Suring motor technology co.,Ltd Changzhou Suring motor technology co.,Ltd
Get in touch with us
Leave a Message, we will call you back quickly!