China factories

China factory - Jiangsu Gaoyi Electric Technology Co.,Ltd

Jiangsu Gaoyi Electric Technology Co.,Ltd

  • China,Zhenjiang ,Jiangsu
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Stainless Steel Turbine Cylinder Cooling Device Intelligent TFTDSK Series
China Stainless Steel Turbine Cylinder Cooling Device Intelligent TFTDSK Series

  1. China Stainless Steel Turbine Cylinder Cooling Device Intelligent TFTDSK Series

Stainless Steel Turbine Cylinder Cooling Device Intelligent TFTDSK Series

  1. MOQ: 1 SET
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Paypal, Western Union
Supply Ability 200 units Per Month
Delivery Time 30 working days
Packaging Details Sea-Worthy Packing or Air-Worthy Packing
Brand Name GAOYI
Model Number NIL
Certification ISO 9001
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Paypal, Western Union Supply Ability 200 units Per Month
Delivery Time 30 working days Packaging Details Sea-Worthy Packing or Air-Worthy Packing
Brand Name GAOYI Model Number NIL
Certification ISO 9001 Place of Origin CHINA
High Light cylinder cooling devicesteam turbine cooling machine

 

New generation intelligent TFTDSK series tubine rapid cooling device

 

 

Product description

 

Large capacity steam turbine has large thermal capacity, good thermal insulation performance and long natural cooling time after shutdown. When the metal temperature of the first stage inner wall of the high pressure cylinder is lower than 150 ℃C, the operation of the rolling car and lubricating oil system can be stopped and the maintenance work of the unit will be carried out. In practical operation, the first stage metal temperature of the middle pressure cylinder is about 430C-450 ℃ when the unit is shut down in general accident, and it takes 210h-230h to stop the driving and lubricating oil system when the unit is naturally cooled to 150 ℃. If the sliding parameter is taken down, the minimum metal temperature of the first stage can be reduced to 290 ℃-300 ℃, and the natural cooling down to 150 ℃ to stog the car and lubricating oil system. It still takes 120 hours to 150 hours. Moreover, when the sliding parameter is shut down, the boiler needs a large amount of fuel and increases the fuel consumption of the power plant. After shutdown, the metal temperature in the cylinder decreases from 0.75 ℃ to 1 ℃/h, so that the maintenance period of the unit is prolonged, and the available coefficient of the unit is reduced, and the metal temperature drop rate in the cylinder is between 0.75 ℃ and 1 ℃/h. In order to speed up the cooling rate a steam turbine after shutdown and shorten the cooling time after shutdown, the high and high pressure cylinder of steam turbine is coaled by means of ventilating hot air in the cylinder. In the high temperature stage after the turbine shut down, the working pressure is 0.4 MPA.0.8 MPA and the temperature is about 350 ℃ to dry clean hot air. Gas, and maintain a certain temperature difference with the cylinder wall, from the high-temperature stage of small low gradually adjusted to the low-temperature stage of the large flow of hot air. Through monitoring the change of cylinder stress in the cooling process of steam turbine, it is found that the thermal shock and stress caused by high temperature drying clean hot air is very small, so it is very sate and efficient to use the cylinder fast cooling device to reduce the cylinder temperature, and it is very sate and efficient to use the cylinder fast cooling device to reduce the cylinder temperature. Reliable.After filtering by oil-water filter, the compressed air is heated to a certain temperature by two sets of air electric heaters to be transported to the collector, and then fed into the cooling parts of the steam turbine, in order to facilitate flexible cooperation and control, the air source is transported by the air compressor, which is filtered by the oil-water filter. It's fast cold. The inlet is equipped with control valve, pressure, flow rate, pneumatic cut-oft valve, temperature measuring device to adjust temperature and flow rate at any time, and then cooperate with steam turbine stress monitoring. According to the cooling rate of the cylinder, the temperature of the cylinder can be reduced automatically in the prescribed range, and the safe and reliable fast cooling of the cylinder can be achieved. The emergency repair under the condition of accident has produced great economic benefits in the plan and small repair of the unit.

 

 

 

Product Features

 

The quick cooling device has a manual stop valve, a pressure switch, a flow meter, an electric regulating valve, an electromagnetic valve, an oil-water filter, a compressed air electric heater, a pipeline, a gas collecting box, a pressure gauge, a safety valve, a temperature measuring element, a control cabinet, and the like.

 

 

 

 

 

Specifications

 

Model Power (KW) Working Pressure (Mpa) Working Temperature (℃) Working Flow (m³/min)
GAO-13 75 0.8 350 15
GAO-20 150 0.8 350 20
GAO-30 200 0.8 350 30
GAO-33 250 0.8 350 30
GAO-50 250 0.8 350 35
GAO-60 250 0.8 350 40
GAO-100 300 0.8 350 60

 

 

 

 

Paking & Delivery

1. Prompt deliver at the very day.
2. Sophisticated and professional logistic agent.
3. Well-trained and disciplined packing team.
4. After-sale service:. Any questions or problems after receiving the product, please feel free to contact us. Problems would be solved for you immediately.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2011

  • Total Annual:

    7 million-7.5 million

  • Employee Number:

    1~183

  • Ecer Certification:

    Active Member

Jiangsu Gaoyi Electric Technology Co., Ltd. has been continuously developing and growing with the support and care of friends from all walks of life. The company has more than 183 employees, of which 18% are professional and technical personnel. The company covers an area of over 60,000 square meter... Jiangsu Gaoyi Electric Technology Co., Ltd. has been continuously developing and growing with the support and care of friends from all walks of life. The company has more than 183 employees, of which 18% are professional and technical personnel. The company covers an area of over 60,000 square meter...

+ Read More

Get in touch with us

  • Reach Us
  • Jiangsu Gaoyi Electric Technology Co.,Ltd
  • 69 gongxin qiao road, xinba, yangzhong city, zhenjiang city, jiangsu province, China
  • http://www.electric-steamgenerator.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement