Payment Terms | L/C, T/T, Paypal, Western Union |
Supply Ability | 200 units Per Month |
Delivery Time | 30 working days |
Packaging Details | Sea-Worthy Packing or Air-Worthy Packing |
Color | Custom |
Material | stainless steel |
power | 75w-300w |
working pressure | 0.8 MPa |
place of origin | Jiangsu, China |
working temperature | 350 ℃ |
Brand Name | GAOYI |
Model Number | NIL |
Certification | ISO 9001 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Stainless Steel Turbine Cylinder Cooling Device Intelligent TFTDSK Series
Automatic Control Cylinder Cooling Device Steam Turbine Rapid Cooling Equipment
Customized Size Turbine Cylinder Cooling Device High Heat Transfer Effect
380v Steam Turbine Cooling Machine High Mechanical Strength Long Life Span
Product Specification
Payment Terms | L/C, T/T, Paypal, Western Union | Supply Ability | 200 units Per Month |
Delivery Time | 30 working days | Packaging Details | Sea-Worthy Packing or Air-Worthy Packing |
Color | Custom | Material | stainless steel |
power | 75w-300w | working pressure | 0.8 MPa |
place of origin | Jiangsu, China | working temperature | 350 ℃ |
Brand Name | GAOYI | Model Number | NIL |
Certification | ISO 9001 | Place of Origin | CHINA |
High Light | rapid cooling machine ,steam turbine cooling machine |
easy operation steam tubine rapid cooling device long life custom voltage
Product description
In order to speed up the cooling speed after the aeration-cooling, shorten the cooling time after downtime, the decorative use of hot air way, stage, the high temperature of turbine downtime after 300 ℃ or so clean hot air drying, and maintain a certain temperature difference and cylinder wall, by the high temperature phase of small flow rate gradually transferred to low temperature stage of large hot air flow, to achieve rapid cooling.
Product Features
Specifications
Model | Power (KW) | Working Pressure (Mpa) | Working Temperature (℃) | Working Flow (m³/min) |
GAO-13 | 75 | 0.8 | 350 | 15 |
GAO-20 | 150 | 0.8 | 350 | 20 |
GAO-30 | 200 | 0.8 | 350 | 30 |
GAO-33 | 250 | 0.8 | 350 | 30 |
GAO-50 | 250 | 0.8 | 350 | 35 |
GAO-60 | 250 | 0.8 | 350 | 40 |
GAO-100 | 300 | 0.8 | 350 | 60 |
Matters needing attention in cooling process of cylinder.
The absolute expansion, expansion difference, rotor eccentricity, axial displacement and so on should be monitored in the whole process of forced ventilation and cooling.
After putting the steam turbine into quick cooling, it is just beginning to supply gas, adopting small temperature difference and small flow rate as far as possible, then gradually increasing the flow rate, strictly controlling the intake temperature and ventilation volume of the cylinder
In principle every adjustment, stable for 30 minutes, no change or little change, adjust again.
Air heater outlet temperature should be steadily reduced without sudden jump phenomenon, when high, medium pressure cylinder inlet air diversion pipe wall temperature of 100; When the first metal temperature of the high pressure cylinder falls below 200 ℃, the ventilation volume can be increased, the fully open electric regulating valve and the full open high, medium pressure cylinder inlet valve can be increased when the temperature is about 200 ℃.
When the first stage metal wall temperature of the high pressure cylinder and the ring holding temperature of the first static blade of the middle pressure cylinder are below 150 ℃, there is no obvious increase, and the forced ventilation cooling is finished. Close the high, medium pressure cylinder intake valve, and then continue to turn the car for 30 minutes, depending on whether the temperature pick-up or not, if not, can stop the car, start maintenance work.
After all the operation, close the compressed air manual valve and electric regulating valve, open the quick cooling device sewage valve, turn off the power supply, check the equipment for abnormal conditions,
facilitate the next normal operation.
Company Details
Business Type:
Manufacturer
Year Established:
2011
Total Annual:
7 million-7.5 million
Employee Number:
1~183
Ecer Certification:
Active Member
Jiangsu Gaoyi Electric Technology Co., Ltd. has been continuously developing and growing with the support and care of friends from all walks of life. The company has more than 183 employees, of which 18% are professional and technical personnel. The company covers an area of over 60,000 square meter... Jiangsu Gaoyi Electric Technology Co., Ltd. has been continuously developing and growing with the support and care of friends from all walks of life. The company has more than 183 employees, of which 18% are professional and technical personnel. The company covers an area of over 60,000 square meter...
Get in touch with us
Leave a Message, we will call you back quickly!