China factories

China factory - Jiangsu Gaoyi Electric Technology Co.,Ltd

Jiangsu Gaoyi Electric Technology Co.,Ltd

  • China,Zhenjiang ,Jiangsu
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Easy Operation Turbine Cylinder Cooling Device Long Life Custom Voltage
China Easy Operation Turbine Cylinder Cooling Device Long Life Custom Voltage

  1. China Easy Operation Turbine Cylinder Cooling Device Long Life Custom Voltage

Easy Operation Turbine Cylinder Cooling Device Long Life Custom Voltage

  1. MOQ: 1 SET
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Paypal, Western Union
Supply Ability 200 units Per Month
Delivery Time 30 working days
Packaging Details Sea-Worthy Packing or Air-Worthy Packing
Color Custom
Material stainless steel
power 75w-300w
working pressure 0.8 MPa
place of origin Jiangsu, China
working temperature 350 ℃
Brand Name GAOYI
Model Number NIL
Certification ISO 9001
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Paypal, Western Union Supply Ability 200 units Per Month
Delivery Time 30 working days Packaging Details Sea-Worthy Packing or Air-Worthy Packing
Color Custom Material stainless steel
power 75w-300w working pressure 0.8 MPa
place of origin Jiangsu, China working temperature 350 ℃
Brand Name GAOYI Model Number NIL
Certification ISO 9001 Place of Origin CHINA
High Light rapid cooling machinesteam turbine cooling machine

easy operation steam tubine rapid cooling device long life custom voltage

 

Product description

 

In order to speed up the cooling speed after the aeration-cooling, shorten the cooling time after downtime, the decorative use of hot air way, stage, the high temperature of turbine downtime after 300 ℃ or so clean hot air drying, and maintain a certain temperature difference and cylinder wall, by the high temperature phase of small flow rate gradually transferred to low temperature stage of large hot air flow, to achieve rapid cooling.

 

 

 

Product Features

  • AI "intelligent" automatic control.
  • Real-time cylinder temperature tracking automatic heating, cooling function.
  • Ultra-high, low temperature alarm.
  • Prevent cold air from entering the cylinder safety protection function.
  • Simple operation, easy to meet.

 

 

 

 

 

Specifications

 

Model Power (KW) Working Pressure (Mpa) Working Temperature (℃) Working Flow (m³/min)
GAO-13 75 0.8 350 15
GAO-20 150 0.8 350 20
GAO-30 200 0.8 350 30
GAO-33 250 0.8 350 30
GAO-50 250 0.8 350 35
GAO-60 250 0.8 350 40
GAO-100 300 0.8 350 60

 

 

 

Matters needing attention in cooling process of cylinder.

 

The absolute expansion, expansion difference, rotor eccentricity, axial displacement and so on should be monitored in the whole process of forced ventilation and cooling.

 

After putting the steam turbine into quick cooling, it is just beginning to supply gas, adopting small temperature difference and small flow rate as far as possible, then gradually increasing the flow rate, strictly controlling the intake temperature and ventilation volume of the cylinder

 

In principle every adjustment, stable for 30 minutes, no change or little change, adjust again.

 

Air heater outlet temperature should be steadily reduced without sudden jump phenomenon, when high, medium pressure cylinder inlet air diversion pipe wall temperature of 100; When the first metal temperature of the high pressure cylinder falls below 200 ℃, the ventilation volume can be increased, the fully open electric regulating valve and the full open high, medium pressure cylinder inlet valve can be increased when the temperature is about 200 ℃.

 

When the first stage metal wall temperature of the high pressure cylinder and the ring holding temperature of the first static blade of the middle pressure cylinder are below 150 ℃, there is no obvious increase, and the forced ventilation cooling is finished. Close the high, medium pressure cylinder intake valve, and then continue to turn the car for 30 minutes, depending on whether the temperature pick-up or not, if not, can stop the car, start maintenance work.

 

After all the operation, close the compressed air manual valve and electric regulating valve, open the quick cooling device sewage valve, turn off the power supply, check the equipment for abnormal conditions,

facilitate the next normal operation.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2011

  • Total Annual:

    7 million-7.5 million

  • Employee Number:

    1~183

  • Ecer Certification:

    Active Member

Jiangsu Gaoyi Electric Technology Co., Ltd. has been continuously developing and growing with the support and care of friends from all walks of life. The company has more than 183 employees, of which 18% are professional and technical personnel. The company covers an area of over 60,000 square meter... Jiangsu Gaoyi Electric Technology Co., Ltd. has been continuously developing and growing with the support and care of friends from all walks of life. The company has more than 183 employees, of which 18% are professional and technical personnel. The company covers an area of over 60,000 square meter...

+ Read More

Get in touch with us

  • Reach Us
  • Jiangsu Gaoyi Electric Technology Co.,Ltd
  • 69 gongxin qiao road, xinba, yangzhong city, zhenjiang city, jiangsu province, China
  • http://www.electric-steamgenerator.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement