Delivery Time | Within 7-12 days |
Payment Terms | T/T, Western Union |
Supply Ability | 2000 set/year |
Packaging Details | exported packing |
Product Name | XY-1A Portable Water Well Drilling Rig |
Features | Easy operation / free maintaining |
Type | water well Drilling Rig |
Power Type | Diesel |
Usage | Water Well |
Voltage | 220v |
Power(W) | 15KW |
Dimension(L*W*H) | 1.75*0.90*1.5m |
Weight | 550KG |
Drilling depth | 150 180M |
Drilling angle | 90-75° |
Brand Name | ShiTan |
Model Number | XY-1A |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Portable Water Well Drilling Rigs GK200 Electric Power Type For Geological
Full Hydraulic Portable Borehole Drilling Machine For Physical Prospecting
XY-1A Portable Mining Drill Rig , 150m Drill Depth Hard Rock Drilling Machine
200m Cutomzied Portable Water Well Drilling Rig Machine For Mining Rocky
Product Specification
Delivery Time | Within 7-12 days | Payment Terms | T/T, Western Union |
Supply Ability | 2000 set/year | Packaging Details | exported packing |
Product Name | XY-1A Portable Water Well Drilling Rig | Features | Easy operation / free maintaining |
Type | water well Drilling Rig | Power Type | Diesel |
Usage | Water Well | Voltage | 220v |
Power(W) | 15KW | Dimension(L*W*H) | 1.75*0.90*1.5m |
Weight | 550KG | Drilling depth | 150 180M |
Drilling angle | 90-75° | Brand Name | ShiTan |
Model Number | XY-1A | Certification | ISO9001 |
Place of Origin | China | ||
High Light | water well borehole drilling rig ,hydraulic water well drilling machine |
Small Lightweight Easy Movement Portable Water Well Drilling Rig 150 Meters Depth
Product Description
This rig is to solve the problems of well drilling, geological exploration, soil testing, etc . it is a kind of medium shallow hole core drilling machine. The utility model has the advantages of small size, light weight, large power and wide range. It is especially available for constructions of hydroelectric power station, highway, railroad and harbor etc.
Product Specifications
Content | Parameter | Content | Parameter |
Drill | Hoist | ||
Drilling depth | 100, 180m | Max. Lifting Capacity (single rope) | 15KN |
Initial hole dia. | 150mm | Lifting Rotating Speed | 36, 76, 121r/min |
Final hole dia. | 75, 46mm | Hoisting Drum Linear Velocity (2 Levels) | 10, 20, 44, 88m/min |
Drill rod dia. | 42, 43mm | Drum Dia. | 140mm |
Angle range | 90º~75º | Wire Rope Dia. | 9.3mm |
Dimensions (L×W×H) | 1620×970×1560(mm) | Wire Rope Capability | 35m |
Weight (Without Power Unit) | 620kg | Brake Dia. | 252mm |
Stroke | 350mm | Brake Belt Width | 50mm |
Swivel Head | Oil Pump | ||
Spindle Speed(5-Speed) | 140, 295, 470, 790, 1010 (r/min) | Model | YBC-12/125 |
Spindle Stroke | 450mm | Rated Presure | 12.5MPa |
Spindle Pull-down max. | 15KN | Displacement | 8ml/r |
Spindle Lifting Capacity max. | 25KN | Rated Speed | 800~2500r/min |
Upward Displacement Speed of Idling Vertical Spindle | 3m/min | Power (Diesel Engine or Motor) | |
Downward Displacement Speed of Idling Vertical Spindle | 4m/min | Model (Diesel Engine) | ZS1100 |
Rated Power | 12.1KW | ||
Rated Speed | 2200r/min | ||
Model (Motor) | Y160M-4 | ||
Rated Power | 11KW | ||
Rated Speed | 1460r/min |
Main Features:
1. Very powerful at soil, sand, hard rock, etc. land condition.
2. Three kinds drill bits (three-wing bit, alloy bit and diamond bit) available for your choice, which can drill both soft and hard ground, especially
diamond drill bit effective in drilling hard rocks.
3. Hydraulic control system for greatly improving the working efficiency, saving labor force.
4. Mounted wheel or trailer, can be hauled easily by car or tractor, convenient to transport.
5. Power can be diesel engine or electric motor, as per your request.
What aspects should we pay attention to in the drilling process of water well drilling rig?
Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.
How to select drill pipe?
The active drill pipe is a tool used to transmit the torque of the drill pipe to the drill pipe to achieve drilling. It is suitable for various specifications of core drills, mainly used for engineering geological exploration, hydrology, water wells and large-diameter engineering construction. In the process of purchasing, the most important thing is to see the raw materials and processing technology of the drill pipe, which is directly related to whether the drill pipe can effectively avoid fracture, water leakage, gluing, deformation, wear and other problems. With Baosteel tube as the raw material, the end of drill pipe is heated by medium frequency, hydraulic upsetting and heat treated to effectively eliminate the internal stress in the early processing. The drill pipe joint is made of 42CrMo. After rough machining, it is quenched, tempered and heat treated. After finishing, it is nitrided on the surface, which can effectively eliminate the problems of gluing and pulling, and is more wear-resistant and easy to disassemble
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!