Payment Terms | T/T, Western Union |
Supply Ability | 5000 sets per year |
Delivery Time | 7-10 days |
Packaging Details | standard export packing |
Product Name | Crawler Mounted Drill Rig |
Drilling Depths | 260Meters |
Place Of Origin | China (Mainland) |
Model Numbe(m) | ST-260 |
Voltage | Differ |
Open Hole Caliber | 75m'm |
Warranty | 1 year |
Material | Steel |
Condition | New |
OEM | Customized Drilling Rig |
Color | Yellow ,Red |
Brand Name | ShiTan |
Model Number | ST-260 |
Certification | ISO,CE,SGS,TUV,BV |
Place of Origin | China |
View Detail Information
Explore similar products
550KG Hydraulic Core Drilling Machine
Multifunctional 1.9m/S 600m Crawler Mounted Drill Rig
GK 200 Portable Hydraulic Crawler Mounted Drilling Rig With 8 Wheels Folding
Diesel Rock 28kw 180m Crawler Mounted Drill Rig
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 5000 sets per year |
Delivery Time | 7-10 days | Packaging Details | standard export packing |
Product Name | Crawler Mounted Drill Rig | Drilling Depths | 260Meters |
Place Of Origin | China (Mainland) | Model Numbe(m) | ST-260 |
Voltage | Differ | Open Hole Caliber | 75m'm |
Warranty | 1 year | Material | Steel |
Condition | New | OEM | Customized Drilling Rig |
Color | Yellow ,Red | Brand Name | ShiTan |
Model Number | ST-260 | Certification | ISO,CE,SGS,TUV,BV |
Place of Origin | China | ||
High Light | underground crawler mounted drill rig ,deep geotechnical crawler mounted drill rig ,high efficiency crawler drill rig |
Underground Deep High Drilling Efficiency Geotechnical Crawler Mounted Drill Rig
ST260 Crawler Mounted Drilling Rig Introduction
This is a multi-functional drilling equipment and mainly suitable for drilling wells, agricultural irrigation wells, geothermal air conditioning holes and other wells, especially for water intake projects in mountainous areas and rock strata.
ST260 Crawler Mounted Drilling Rig Parameter
Drilling Depth | 260meters |
Hole Diameter | 140-260mm |
Advance Length once | 63m |
Working pressure | 1.7-3.0MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m,6m |
Dia. Of rod | φ76, φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 8500-11000N.m |
Rotation Speed | 40-70r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 6000kgs |
Dimension | 4m×1.7m×2.2m |
Application | Complicated geological conditions:Rock,Mud,Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling |
Dth Hammer | 4",5",6",8" Drill hammer or CIR110, 130, 150,170 |
ST260 Crawler Mounted Drilling Rig Features
Large drilling diameter, deep drilling, fast footage, flexible and efficient.It is equipped with high-torque hydraulic motor and large-bore hydraulic cylinder for propulsion, and the pump set design is convenient for maintenance.
The drilling rig adopts the excavator crawler chassis, which has strong off-road capability,independent modular design, and superior maneuverability. The combined positioner can be adjusted and replaced according to different types of drill rods and impactors to ensure accurate positioning and centering.
Oil Filter Element Replacement
1. Unscrew and discard the oil filter.
2. Clean the filter shell by self suction and dredge the front and rear differential pressure through holes.
3. Check whether the differential pressure transmitter is normal.
4. Fill the new filter element with oil and apply a layer of oil on the sealing ring of the filter element.
5. When installing the filter element, screw it until it contacts the sealing gasket, and then manually tighten it by 1 / 3 turn.
6. After startup, check whether there is leakage.
Note: the filter element can be replaced only after the screw machine is stopped and the pressure is released. Be careful of hot oil to prevent scalding.
When the well bit slips, it can be handled.
After two times of tripping in, the thickness of the muck is determined through the number on the display. After looking at the soft and hardness of the dropped address, if there is a lot of soil and it is hard clay, a drill bucket smaller than the pile diameter is used to solve the problem of slipping. Because there is a large gap between the diameter drill bucket and the hole wall, the dropped soil is under the action of the total amount of drill pipe bucket and pressure, Through the gap between the drill bucket and the hole wall, the small-diameter drill bucket can normally drill when it contacts the solid soil. The large-diameter drill bucket is squeezed into the small hole after two times of running in, so that the large-diameter drill bucket can normally enter the small hole
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!