Payment Terms | T/T, Western Union |
Supply Ability | 2000sets/month |
Delivery Time | 5 days after advance payment |
Packaging Details | bulk packing |
Drilling Rig Product Name | ST 200 Crawler Mounted Drill Rig |
Drilling Depth | 200 meters |
Drilling diameter | 140-200mm |
Drilling type | Water Well Drilling |
Mobility | crawler |
Drilling unit | tophammer |
Feeding type | hydraulic |
Drill rod diameter | 76/89 |
Swing speed | 45-70rpm |
Swing torque | 3500-4800N.M |
Drill rod length | 1.5m 2.0m 3.0m |
OEM | Acceptable |
Brand Name | ShiTan |
Model Number | ST200 |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
550KG Hydraulic Core Drilling Machine
Multifunctional 1.9m/S 600m Crawler Mounted Drill Rig
GK 200 Portable Hydraulic Crawler Mounted Drilling Rig With 8 Wheels Folding
Diesel Rock 28kw 180m Crawler Mounted Drill Rig
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 2000sets/month |
Delivery Time | 5 days after advance payment | Packaging Details | bulk packing |
Drilling Rig Product Name | ST 200 Crawler Mounted Drill Rig | Drilling Depth | 200 meters |
Drilling diameter | 140-200mm | Drilling type | Water Well Drilling |
Mobility | crawler | Drilling unit | tophammer |
Feeding type | hydraulic | Drill rod diameter | 76/89 |
Swing speed | 45-70rpm | Swing torque | 3500-4800N.M |
Drill rod length | 1.5m 2.0m 3.0m | OEM | Acceptable |
Brand Name | ShiTan | Model Number | ST200 |
Certification | ISO | Place of Origin | China |
High Light | impactor borewell crawler mounted drill rig ,140mm dia crawler mounted drill rig ,140 mm hole diameter crawler drill rig |
Impactor Borewell Rubber Crawler Mounted Drill Rig With 200 Meters Depth For Borehole Blasting
ST 200 Crawler Mounted Drill Rig Introduction
High quality, competitive price, 200 m drilling rig depth ,crawler assembly, powerful, variety terrain, stable operation, flexible volume, driven by hydraulic motor, large traction, various models, support customization.Pneumatic drilling rig is especially suitable for water intake in mountainous and rocky strata
ST 200 Crawler Mounted Drill Rig Parameters
Drilling Rig Model | ST-200 |
Weight | 5.8T |
Bore diameter | 140-305mm |
Drilling depth | 200m |
Stroke | 3.4m |
Travelling speed | 2.5km/h |
Gradeability | 30% |
Power | 65-70KW |
Rated pressure | 1.7-3.0mpa |
Air consumption | 17-30m³/min |
Drill rod diameter | Φ76, Φ89 |
Drill rod length | 1.5m 2.0m 3.0m |
Elevating capacity | 15T |
Swing speed | 45-70rpm |
Swing torque | 3500-4800N.M |
Dimensions | 4000*1750*2450mm |
ST 200 Crawler Mounted Drill Rig Features:
ST 200 Crawler Mounted Drill Rig Service:
Before sales: Engineering Consultance Service & Technical Support;
After sales: Process clients' feedback and or problems during the operation of the machines within 24 hours;
OEM service: We accept OEM orders and 70 percent of our clients are enjoying OEM services;
Specific requirements for drilling equipment installation
1. The length, quantity, and foundation type of various machine logs should be determined based on the type of equipment, drilling design angle, depth, and regional conditions.
2. Regardless of the use of wooden bases, channel steel, or I-beam machines, their layout requirements are stable, square, and horizontal. The cross connecting bolts of each part should be equipped with washers and tightened with nuts to increase the bearing capacity of the foundation and the stability of the equipment;
3. In deep pit construction, if the foundation rock layer is not firm, concrete foundation should be poured into the four legs of the drilling tower, drilling rig, power machine, and lower excavation pit.
4. The installation sequence of drilling equipment is the drilling rig (intermediate shaft), power machine, mud pump, and other auxiliary equipment;
5. The bolts of the drilling rig and power machine base are integrated with the intersection of the machine bed wood and machine sleepers;
6. Install the drilling rig so that the center of the crown block (or leading edge), the center of the vertical shaft (or center of the rotary table), and the center of the drilling hole are in a straight line;
7. When installing the intermediate shaft, power machine, and mud pump, if belt transmission is used, the distance between each part should be appropriate, and the belt pulley should be aligned;
8. The installation of bolts for various equipment and auxiliary equipment must be equipped with washers and tightened;
9. After the installation of various equipment is completed, the team must organize relevant personnel for inspection and acceptance. Only after the installation quality and safety protection devices meet the requirements can drilling be started.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!