China factories

China factory - Jinzhou City Shitan Machinery Equipment  CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Impactor Borewell Rubber Crawler Mounted Drill Rig With 200 Meters Depth For
China Impactor Borewell Rubber Crawler Mounted Drill Rig With 200 Meters Depth For

  1. China Impactor Borewell Rubber Crawler Mounted Drill Rig With 200 Meters Depth For
  2. China Impactor Borewell Rubber Crawler Mounted Drill Rig With 200 Meters Depth For

Impactor Borewell Rubber Crawler Mounted Drill Rig With 200 Meters Depth For

  1. MOQ: 1 set
  2. Price: USD46000/set
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 2000sets/month
Delivery Time 5 days after advance payment
Packaging Details bulk packing
Drilling Rig Product Name ST 200 Crawler Mounted Drill Rig
Drilling Depth 200 meters
Drilling diameter 140-200mm
Drilling type Water Well Drilling
Mobility crawler
Drilling unit tophammer
Feeding type hydraulic
Drill rod diameter 76/89
Swing speed 45-70rpm
Swing torque 3500-4800N.M
Drill rod length 1.5m 2.0m 3.0m
OEM Acceptable
Brand Name ShiTan
Model Number ST200
Certification ISO
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 2000sets/month
Delivery Time 5 days after advance payment Packaging Details bulk packing
Drilling Rig Product Name ST 200 Crawler Mounted Drill Rig Drilling Depth 200 meters
Drilling diameter 140-200mm Drilling type Water Well Drilling
Mobility crawler Drilling unit tophammer
Feeding type hydraulic Drill rod diameter 76/89
Swing speed 45-70rpm Swing torque 3500-4800N.M
Drill rod length 1.5m 2.0m 3.0m OEM Acceptable
Brand Name ShiTan Model Number ST200
Certification ISO Place of Origin China
High Light impactor borewell crawler mounted drill rig140mm dia crawler mounted drill rig140 mm hole diameter crawler drill rig

Impactor Borewell Rubber Crawler Mounted Drill Rig With 200 Meters Depth For Borehole Blasting

 

 

ST 200 Crawler Mounted Drill Rig Introduction

 

High quality, competitive price, 200 m drilling rig depth ,crawler assembly, powerful, variety terrain, stable operation, flexible volume, driven by hydraulic motor, large traction, various models, support customization.Pneumatic drilling rig is especially suitable for water intake in mountainous and rocky strata

 

ST 200 Crawler Mounted Drill Rig Parameters

 

Drilling Rig Model ST-200
Weight 5.8T
Bore diameter 140-305mm
Drilling depth 200m
Stroke 3.4m
Travelling speed 2.5km/h
Gradeability 30%
Power 65-70KW
Rated pressure 1.7-3.0mpa
Air consumption 17-30m³/min
Drill rod diameter Φ76, Φ89
Drill rod length 1.5m 2.0m 3.0m
Elevating capacity 15T
Swing speed 45-70rpm
Swing torque 3500-4800N.M
Dimensions

4000*1750*2450mm

 

 

ST 200 Crawler Mounted Drill Rig Features:

 

1.Small profile for easy access to narrow job sites. 
2.Simple but reliable design with adequate rotary torque and lifting force for widely used for civilian market.
3.Hoist and winch able to lift drill tools and accessories up to 1,500kg,much reducing workload of operators.
4.Rotation with two speed adjustable for different hole ranges and rock conditions.
 

ST 200 Crawler Mounted Drill Rig Service:

 

Before sales: Engineering Consultance Service & Technical Support;
After sales: Process clients' feedback and or problems during the operation of the machines within 24 hours;
OEM service: We accept OEM orders and 70 percent of our clients are enjoying OEM services;

 

Specific requirements for drilling equipment installation

 

1. The length, quantity, and foundation type of various machine logs should be determined based on the type of equipment, drilling design angle, depth, and regional conditions.

2. Regardless of the use of wooden bases, channel steel, or I-beam machines, their layout requirements are stable, square, and horizontal. The cross connecting bolts of each part should be equipped with washers and tightened with nuts to increase the bearing capacity of the foundation and the stability of the equipment;

3. In deep pit construction, if the foundation rock layer is not firm, concrete foundation should be poured into the four legs of the drilling tower, drilling rig, power machine, and lower excavation pit.

4. The installation sequence of drilling equipment is the drilling rig (intermediate shaft), power machine, mud pump, and other auxiliary equipment;

5. The bolts of the drilling rig and power machine base are integrated with the intersection of the machine bed wood and machine sleepers;

6. Install the drilling rig so that the center of the crown block (or leading edge), the center of the vertical shaft (or center of the rotary table), and the center of the drilling hole are in a straight line;

7. When installing the intermediate shaft, power machine, and mud pump, if belt transmission is used, the distance between each part should be appropriate, and the belt pulley should be aligned;

8. The installation of bolts for various equipment and auxiliary equipment must be equipped with washers and tightened;

9. After the installation of various equipment is completed, the team must organize relevant personnel for inspection and acceptance. Only after the installation quality and safety protection devices meet the requirements can drilling be started.

 

 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    8000000-15000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Village,Jinzhou City,Hebei province,China
  • https://www.drillingrigmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement