Payment Terms | T/T, Western Union |
Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days |
Packaging Details | Standard Export Package |
Product Name | Multifunctional Engineering Project Prospecting 400 Meters Depth Borehole Drilling Machine |
Type | Core Drilling Rig,water well drilling rig |
Power Type | Diesel |
Usage | Water Well,geological exploration |
Voltage | 380V |
Power(W) | 16.2kw |
Dimension(L*W*H) | 1730*860*1360mm |
Weight | 585kg |
Drilling Depth | 300m |
Drilling Diameter | 75-200mm |
Engine | Diesel Power |
Brand Name | JINZHOU SHITAN |
Model Number | Gy 200 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Hydraulic GK200 2200r/Min Borehole Drilling Machine
XY-1A 150 Meters Small Portable Water Well Borehole Drilling Machine
Water Well Railways GK180 Mining Core Drilling Equipment
Mines 600m 2200rpm Borehole Drilling Machine
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days | Packaging Details | Standard Export Package |
Product Name | Multifunctional Engineering Project Prospecting 400 Meters Depth Borehole Drilling Machine | Type | Core Drilling Rig,water well drilling rig |
Power Type | Diesel | Usage | Water Well,geological exploration |
Voltage | 380V | Power(W) | 16.2kw |
Dimension(L*W*H) | 1730*860*1360mm | Weight | 585kg |
Drilling Depth | 300m | Drilling Diameter | 75-200mm |
Engine | Diesel Power | Brand Name | JINZHOU SHITAN |
Model Number | Gy 200 | Certification | ISO9001 |
Place of Origin | China | ||
High Light | 400M Depth Borehole Drilling Machine ,Multifunctional Borehole Drilling Machine ,Prospecting Borehole Drilling Machine |
Multifunctional 400 Meters Depth Borehole Drilling Machine Engineering Project Prospecting
Multifunctional Engineering Project Prospecting 400 Meters Depth Borehole Drilling Machine
GY 200 Borehole Drilling Machine Introduction:
It is a light multifunctional engineering project prospecting drilling rig,with 300 meters depth and 300mm hole diameter, It was designed for geologic structure prospecting of industrial and civil constructions.
GY 200 Borehole Drilling Machine Technical Information:
Drilling depth | 60 225 295m |
Drilling hole diameter | 300 76 46mm |
Pipe rod diameter | 50 42mm |
Spindle Turnable Angle | 0-360degree |
Net weight(excluding the power machine) | 670kg |
Dimension(length*width*height) | 1820*980*1400mm |
Revolving Plate | |
Spindle speed | 900 475 388 205 157 68 r/min |
Maximum torque | 2000N*m |
Driving travel | 400mm |
Maximum Cylinder driving force | 2,9000N |
Maximum Cylinder lifting force | 3,9000N |
Lifter | |
Lifting capacity | 3,0000N |
Bobbin line speed (2 layers) | 0.27 0.64 0.83 1.58 1.64 m/s |
Bobbin diameter | 135mm |
GY 200 Borehole Drilling Machine Features
1.Wide range if P.R.M and well-set gears
2.Great torque in low P.R.M, fit for coring drilling and piling hole works.
3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.
4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.
5.With light single derrick cell, the derrick can be dismantled and handled easily and safely.
GY 200 Borehole Drilling Machine Application
1.1.1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.
1.1.2 geological core drilling and physical survey.
1.1.3 drilling of small grouting holes and blasting holes.
1.1.4 small water well drilling
Correct Use of Small Geophysical Drilling Rig
In order to ensure the normal construction of the drilling rig and avoid failures as much as possible, it is important to know the correct use of the drilling rig in addition to selecting a drilling rig with good quality and performance
1, First of all, there must be an essential first step, that is, the installation and preparation of the drilling rig. 1. Prepare the rock drilling cavern. The cavern specifications can be determined according to the drilling method. Generally, when drilling horizontal holes, the cavern height is 2.6-2.8 meters, when drilling upward holes, and when drilling downward holes or inclined holes, the cavern width is 2.5 meters, and the height is 2.8-3 meters. 2. Lead the air and water pipelines, lighting lines, etc. to the working face for future use. 3. The column shall be erected firmly according to the design requirements of the hole. The upper and lower ends of the pillar shall be padded with wood plates, and the horizontal shaft and snap ring shall be installed on the pillar according to a certain height and direction. The machine shall be lifted by the hand winch, fixed on the pillar according to the required angle, and then the hole direction of the drill shall be adjusted.
2, Secondly, the second key step is the inspection before operation. 1. When starting work, carefully check whether the air and water pipelines are firmly connected and whether there is air and water leakage. 2. Check whether the oil injector is filled with oil. 3. Check whether the screws, nuts, joints, etc. of each part have been tightened, and whether the column is firmly jacked.
3, Then, it is the drilling operation procedure
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!