Payment Terms | T/T, Western Union |
Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days |
Packaging Details | Standard Export Package |
Product Name | Gy 200 Crawler Mounted Portable Borehole Drilling Machine 400 Meters Depth |
Condition | New |
Type | Core Drilling Rig,water well drilling rig |
Power Type | Diesel |
Usage | Water Well,geological exploration |
Voltage | 380V |
Power(W) | 16.2kw |
Dimension(L*W*H) | 1730*860*1360mm |
Weight | 585kg |
Drilling Depth | 300m |
Drilling Diameter | 75-200mm |
Engine | Diesel Power |
Brand Name | JINZHOU SHITAN |
Model Number | Gy 200 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Hydraulic GK200 2200r/Min Borehole Drilling Machine
XY-1A 150 Meters Small Portable Water Well Borehole Drilling Machine
Water Well Railways GK180 Mining Core Drilling Equipment
Mines 600m 2200rpm Borehole Drilling Machine
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days | Packaging Details | Standard Export Package |
Product Name | Gy 200 Crawler Mounted Portable Borehole Drilling Machine 400 Meters Depth | Condition | New |
Type | Core Drilling Rig,water well drilling rig | Power Type | Diesel |
Usage | Water Well,geological exploration | Voltage | 380V |
Power(W) | 16.2kw | Dimension(L*W*H) | 1730*860*1360mm |
Weight | 585kg | Drilling Depth | 300m |
Drilling Diameter | 75-200mm | Engine | Diesel Power |
Brand Name | JINZHOU SHITAN | Model Number | Gy 200 |
Certification | ISO9001 | Place of Origin | China |
High Light | crawler mounted portable borehole drilling machine ,400meters depth portable borehole drilling machine ,400 meters depth borehole machine |
Gy 200 Crawler Mounted Portable Borehole Drilling Machine 400 Meters Depth
GY 200 Hydraulic Borewell Machine
It is a light multifunctional engineering project prospecting drilling rig,with 300 meters depth and 300mm hole diameter, It was designed for geologic structure prospecting of industrial and civil constructions.
GY 200 Hydraulic Borewell Machine Technical
Drilling depth | 60 225 295m |
Drilling hole diameter | 300 76 46mm |
Pipe rod diameter | 50 42mm |
Spindle Turnable Angle | 0-360degree |
Net weight(excluding the power machine) | 670kg |
Dimension(length*width*height) | 1820*980*1400mm |
Revolving Plate | |
Spindle speed | 900 475 388 205 157 68 r/min |
Maximum torque | 2000N*m |
Driving travel | 400mm |
Maximum Cylinder driving force | 2,9000N |
Maximum Cylinder lifting force | 3,9000N |
Lifter | |
Lifting capacity | 3,0000N |
Bobbin line speed (2 layers) | 0.27 0.64 0.83 1.58 1.64 m/s |
Bobbin diameter | 135mm |
GY 200 Hydraulic Borewell Machine Advantages
1.Wide range if P.R.M and well-set gears
2.Great torque in low P.R.M, fit for coring drilling and piling hole works.
3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.
4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.
5.With light single derrick cell, the derrick can be dismantled and handled easily and safely.
GY 200 Hydraulic Borewell Machine Application
1.1.1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.
1.1.2 geological core drilling and physical survey.
1.1.3 drilling of small grouting holes and blasting holes.
1.1.4 small water well drilling
How are the drill pipes in the well drill connected?
The water well drilling rig can be used only after all parts are firmly installed and connected before being used for drilling.
The following are the relevant operation steps of adding and connecting the drill pipe of the water well drilling machine:
Operation of well drilling machine when adding drill pipe
1. When the depth of one drill pipe needs to be connected after drilling, stop the propulsion first, then stop the rotation, and turn off the cooling water;
2. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation);
3. The rotator reverses, and at the same time, retracts the feed oil cylinder to rotate the water braid shaft away from the drill pipe;
4. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly return to place;
5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!