China factories

China factory - Jinzhou City Shitan Machinery Equipment  CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Commerical Business Hydraulic Borewell Machine For 400 Meters Depth Water Well
China Commerical Business Hydraulic Borewell Machine For 400 Meters Depth Water Well

  1. China Commerical Business Hydraulic Borewell Machine For 400 Meters Depth Water Well
  2. China Commerical Business Hydraulic Borewell Machine For 400 Meters Depth Water Well

Commerical Business Hydraulic Borewell Machine For 400 Meters Depth Water Well

  1. MOQ: 1 set
  2. Price: 35000 USD-45000 USD
  3. Get Latest Price
Payment Terms T/T, Western Union
Supply Ability 2000 sets/month
Delivery Time 5 days
Packaging Details Wooden box
Product Name 400 Meters Depth Commerical Business Pneumatic Borewell Machine For Water Well
Drilling depth 400meters
Drilling diameter Φ140-Φ350mm
Dimension 5900x2100x2850mm
Feeding type hydraulic
One push length 6M
Length of drill pipe 1.5m, 2.0m, 3.0m,6.0m
Drilling pipe diameter Φ89, Φ102mm, Φ108mm
Weight 9.8T
Working air pressure 1.7-3.5MPa
After-sales service provided Video technical support
OEM avaliable
Brand Name Shitan
Model Number ST-400
Certification ISO 9001
Place of Origin Hebei China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union Supply Ability 2000 sets/month
Delivery Time 5 days Packaging Details Wooden box
Product Name 400 Meters Depth Commerical Business Pneumatic Borewell Machine For Water Well Drilling depth 400meters
Drilling diameter Φ140-Φ350mm Dimension 5900x2100x2850mm
Feeding type hydraulic One push length 6M
Length of drill pipe 1.5m, 2.0m, 3.0m,6.0m Drilling pipe diameter Φ89, Φ102mm, Φ108mm
Weight 9.8T Working air pressure 1.7-3.5MPa
After-sales service provided Video technical support OEM avaliable
Brand Name Shitan Model Number ST-400
Certification ISO 9001 Place of Origin Hebei China
High Light 400meters depth hydraulic borewell machinepneumatic hydraulic borewell machinepneumatic mini borewell machine

400 Meters Depth Commerical Business Pneumatic Borewell Machine For Water Well

 

 

ST 400 Pneumatic Borewell Machine Information

 

With 400 meters depth ,suitable for geothermal air conditioning holes and other wells, especially suitable for water intake projects in mountainous areas and rock formations,this rig can both work with mud pump and air compressor .This drilling rig needs to be used with an air compressor. If you want to buy an air compressor at the same time, please tell us your drilling depth and diameter, and we will give the corresponding recommendation

 

ST 400 Pneumatic Borewell Machine Technical Data

 

Product Name  ST 400 Drilling Rig 

Max drilling depth
400 Meters

Drilling diameter
105-325 mm

Air pressure
1.2-3.5mpa

Rod length
3 meter

Rod diameter
89-102-114mm

Main shaft pressure
5T

Lifting force
25T
Power head stroke 6.6M

Max rotary torque
12000Nm

Max rotary speed
100r/ rmin

Secondary winch liftng force
3T

Jacks stroke
1.5m

Moving speed
2.5km/h

Uphill angle
21°Slope

Weight of the rig
8.8T
The engine 92KW / 6 cylinder

Overall dimensions
3900*1600*2350mm

Working condition
Loose layer and bedrock

Drilling method
Hydraulic rotary, down-the-hole impactor

 

ST 400 Pneumatic Borewell Machine Features

 

1. The drilling rig hydraulic transmission of the rig effectively utilizes the power. This makes the overall power loss small and the drilling cost low.

2. The drill rig has more positive speed stages and 14-500r / min speed range, and the output torque is 13428-250N.m.
3. The drilling rig has 2 reverse speeds, which is convenient for handling accidents.
4. The air compressor drilling rig adopts a long-stroke double-speed mechanism, a mechanical power head, and a power head stroke of 3400MM to improve drilling efficiency and reduce the occurrence of plugging and burning accidents.
5. The water well drilling rig rig uses dual oil pumps for oil supply. A single pump is used for drilling, and a double pump is used for confluence when lifting. The power loss is small and the auxiliary time is short.
6. The drilling rig machine has advanced structure and reasonable layout, which is convenient for maintenance, maintenance and repair.
7. The crawler water drilling rig machine chassis is adopted, and the trip of the outrigger
cylinder can be automatically loaded for 1.5m, which is convenient for relocation and transportation.
8. The drill rig reserves some functional interfaces in the hydraulic system, and can expand the functions according to the technological requirements of different users.
 

What is the construction technology of de watering well?

 

Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.

 

Precautions for drilling machine working at low temperature

 

1. In the low temperature environment, the land will become hard, so when we choose the site, we need to have some requirements. The site needs to be flat and the road needs to be unblocked. This must be ensured.

2. The drilling machine mainly uses triangular support, especially in the case of low temperature, we should ensure that the support of the drilling machine is firm and reliable. Our staff need to regularly check and deal with hidden dangers in time once they are found. We must not be careless

3. Although we work at low temperature, we can not ignore the problem of fire prevention. The configuration of fire-fighting equipment must be reasonable and meet the fire-fighting requirements.

4. Low temperature, low temperature, what is the most important? Of course, our friends should pay attention to their warmth when working. Only when they are warm can we better put ourselves into work.

5. The temperature is low, which will definitely have certain impact on the construction. We must pay attention to warmth and safety

 

 
 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    8000000-15000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Village,Jinzhou City,Hebei province,China
  • https://www.drillingrigmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement