Payment Terms | L/C, T/T |
Supply Ability | 3000 PCS/DAY |
Delivery Time | 35 days after deposit |
Packaging Details | 1 set in 1 Innder Box 5 sets in Master Carton |
Operation | Non Maintained or Maintained |
Lamp Application | 1-45w led lights |
Battery | Li-ion Battery |
Construction | PC Casing, PS Diffuser |
Duration | 3 Hours |
Input Voltage | 110-240v 50/60Hz |
Size | 220mmx30mmx30mm |
Brand Name | Zhui Ming |
Model Number | F355M |
Certification | CE |
Place of Origin | China |
View Detail Information
Explore similar products
Full Output Emergency Light Conversion Kit With Li - Ion Battery , OEM / ODM
Li-Ion Battery Rechargeable Emergency Conversion Kit With 1-3hour Emergency Time
Self-Test Li-Ion Battery Led Emergency Conversion Kit With 1-3 Hours Emergency
3H Operation Self Test LED Emergency Conversion Kit Power Souce For LED Lights
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 3000 PCS/DAY |
Delivery Time | 35 days after deposit | Packaging Details | 1 set in 1 Innder Box 5 sets in Master Carton |
Operation | Non Maintained or Maintained | Lamp Application | 1-45w led lights |
Battery | Li-ion Battery | Construction | PC Casing, PS Diffuser |
Duration | 3 Hours | Input Voltage | 110-240v 50/60Hz |
Size | 220mmx30mmx30mm | Brand Name | Zhui Ming |
Model Number | F355M | Certification | CE |
Place of Origin | China | ||
High Light | led light conversion kits , emergency light conversion kit |
Customized IP65 Waterproof Battery Powered Led Emergency Lighting
Parameters
Operation | Non-Maintained |
Input Voltage | 110V-127V 50/60Hz;220V-240V 50/60Hz |
Charging Current | 120mA (Nominal) |
Lamp Used | 15 pcs DIP white LED |
Battery | Nickel-Cadmium Battery 3.6V 0.6Ah |
Indication | GREEN LED Indicates Charging |
Installation | Wall Surface Mounted |
Weight | 1.4KG |
Product Size | 415mm×188mm×82mm |
Duration Time | >3HRS |
IP Rate | IP65 |
Construction | PC Casing, PC Diffuser |
Operating Temperature | -10°C to 55°C |
Specification:
Function
Over 3hrs emergency lighting after sudden blackout
Application
For shoping malls, office buildings,goverment buildings, teaching buildings, Dormitories and so on
Package
Delivery Time
1. What is the main differences of Fluorescent lamp and LED?
Main difference is power consumption and life span.
For same brightness, the power consumption of fluorescent lamps 2 to 3 times that of LED lamps.
The life span of LED lamps 10 times that of fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.
Product Show:
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2006
Ecer Certification:
Verified Supplier
Hangzhou Dreamy Technology Co.,Ltd. established in 2006, is a manufacturer and trader specialized in the research, development and production of emergency lights. All of our products use environmental protection material, and we make the Environmental assessement files that are shown in fo... Hangzhou Dreamy Technology Co.,Ltd. established in 2006, is a manufacturer and trader specialized in the research, development and production of emergency lights. All of our products use environmental protection material, and we make the Environmental assessement files that are shown in fo...
Get in touch with us
Leave a Message, we will call you back quickly!