Payment Terms | 50% prepaid, 50% paid before shipment |
Supply Ability | 10 sets per month |
Delivery Time | 30 days, negotiable |
Packaging Details | standard export packing |
Material | Carbon Steel |
Size | Can be customized |
Product name: | Domestic sewage treatment equipment |
Appliaction | Hotels, restaurants,residential and many more |
Usage | Waste water treatment |
Warranty | 1 Year |
Brand Name | Chen Kan |
Model Number | AO |
Certification | ISO9001 |
Place of Origin | HeNan, China |
View Detail Information
Explore similar products
Containerized Household Waste Water Treatment Plant Effluent Sewage Treatment
3m3/H 7m3/H Biological Household Waste Water Treatment Plant Carbon Steel
2m3/H 5m3/H 25m3/H Household Sewage Treatment Plant Stainless Steel
6m2 To 58m2 Sewage Waste Water Treatment Plant For School Hotel Station
Product Specification
Payment Terms | 50% prepaid, 50% paid before shipment | Supply Ability | 10 sets per month |
Delivery Time | 30 days, negotiable | Packaging Details | standard export packing |
Material | Carbon Steel | Size | Can be customized |
Product name: | Domestic sewage treatment equipment | Appliaction | Hotels, restaurants,residential and many more |
Usage | Waste water treatment | Warranty | 1 Year |
Brand Name | Chen Kan | Model Number | AO |
Certification | ISO9001 | Place of Origin | HeNan, China |
High Light | 14m2 integrated sewage treatment equipment 14m2 ,integrated sewage treatment equipment 3m3/H ,2kw household water purification equipment |
Integrated Domestic Sewage Treatment Equipment Household Waste Water And Sewage Treatment Equipment
Product Description
As the most efficient sewage treatment device,It's used for the treatment and reuse of domestic sewage and similar slaughter,aquatic product processing, and food,and other small and medium-sized industrial organic watsewater. The quality of the sewage treated by this equipment can reach the national comprehensive sewage treatment discharge standard. The water after be treated can be used to irrigation.
Product Advantages
1, Integrated device, no need construction, which is easy to be installed.
2, Full Automatic machine, which is easy to operate and maintain.
3, Compact design, which is easy to transport.
4, Low noise, less odor, less impact on the surrounding environment.
5, Can be fixed on underground, which can save space above ground.
Integrated sewage treatment equipment
① The main equipment can be buried below the underground frozen layer, and the surface above the main equipment can be used as greening or other land, without building houses and heating insulation. According to the customer's requirements, the equipment host can also be placed on the ground.
② Compared with the activated sludge tank, it has smaller volume, strong adaptability to water quality, good impact load resistance and stable effluent quality,No sludge bulking.
③ Biological contact oxidation method is adopted in biochemical tank, the volume load of the filler is relatively low, the microorganism is in its own oxidation stage, and the mud production is small ,It takes more than three months (90 days) to discharge the mud (use the manure truck to pump or dehydrate into mud cake for transportation).
④ Conventional high-altitude exhaust is adopted for the deodorization of the buried sewage treatment equipment.
⑤ The whole equipment processing system is equipped with a full-automatic electrical control system, which is safe and reliable in operation. Generally, it does not need special personnel to manage, but only needs timely to maintain the equipment.
Technical Data
Model | WAZ1 | WAZ2 | WAZ3 | WAZ5 |
Processing capacity | 1m³h | 2m³/h | 3m³/h | 5m³/h |
power | 1.1kw | 1.3kw | 2kw | 2.2kw |
area | 6㎡ | 10㎡ | 14㎡ | 19㎡ |
Fan air volume | 0.31m³/min | 0.59m³/min | 0.67m³/min | 1.02m³/min |
Wind pressure of fan | 5000m.mH2O | 5000m.mH2O | 5000m.mH2O | 5000m.mH2O |
Pump flow | 1m³/h | 2m³/h | 3m³/h | 5m³/h |
Pump head | 8m | 8m | 8m | 8m |
Note: we can design the different size based on the different water capacity(m3/h).
Our Service
1. The warranty period is from the date of handover and acceptance of the equipment. Within the scope of equipment warranty, our company will guide maintenance or replacement of facility failures free of charge.
2. According to the user's needs, after the equipment is handed over, our company can send technical personnel to train the user's operation and maintenance personnel at any time.
3. After the warranty period expires, spare parts shall be provided at the cost.
Company Details
Business Type:
Manufacturer
Year Established:
1970
Total Annual:
700000-1000000
Employee Number:
1000 ~2000
Ecer Certification:
Active Member
KaiYuan Environmental Protection (Group) Co., Ltd. was founded in 1970. It began to produce environmental protection water treatment equipment in 1980. It has been engaged in the environmental protection industry for nearly 40 years. It was the first batch of designated production of environmental p... KaiYuan Environmental Protection (Group) Co., Ltd. was founded in 1970. It began to produce environmental protection water treatment equipment in 1980. It has been engaged in the environmental protection industry for nearly 40 years. It was the first batch of designated production of environmental p...
Get in touch with us
Leave a Message, we will call you back quickly!