Payment Terms | T/T,, L/C, Western Union |
Supply Ability | 100 Piece/Pieces per Month |
Delivery Time | 5...15Days OR To be negotiated |
Packaging Details | wooden box/standard exporting carton |
Product namein | Combined maintenance-free outdoor pre-installed European-style substation |
Rated current | 200/400/630/1000(A) |
Material | Support customization |
Impulse withstand voltage | 75(KV) |
certified product | iso9001 |
Custom processing | Yes |
weight | Support customization |
Shell protection level | ip44 |
colour | Support customization |
Brand Name | Baikong |
Model Number | YBW |
Certification | IEC,GB |
Place of Origin | Sichuan,China |
View Detail Information
Explore similar products
IP44 Anti Corrosion Portable Power Substation High Temperature 630kva
75KV Efficient Prefab Substation 1000A Compact Transformer Substation IP44
Complete Set 630kva Prefab Substation 45kv Prefabricated Substation
4000A American Box Type Substation Complete Set Outdoor Pre Installed 1000kg
Product Specification
Payment Terms | T/T,, L/C, Western Union | Supply Ability | 100 Piece/Pieces per Month |
Delivery Time | 5...15Days OR To be negotiated | Packaging Details | wooden box/standard exporting carton |
Product namein | Combined maintenance-free outdoor pre-installed European-style substation | Rated current | 200/400/630/1000(A) |
Material | Support customization | Impulse withstand voltage | 75(KV) |
certified product | iso9001 | Custom processing | Yes |
weight | Support customization | Shell protection level | ip44 |
colour | Support customization | Brand Name | Baikong |
Model Number | YBW | Certification | IEC,GB |
Place of Origin | Sichuan,China | ||
High Light | Combined European Packaged Transformer Substation ,maintenance free Packaged Transformer Substation ,Combined substation 630A |
Combined maintenance-free outdoor pre-installed European-style substation
The main technical parameters
The main technical parameters | |||||
Serial number | name | unit | High-voltage electrical appliances | transformer | Low-voltage electrical appliances |
1 | Rated voltage | KV | 6/10 | 6/0.4 10/0.4 | 0.4 |
2 | Rated Capacity | KVA | 50-1600 | ||
3 | Rated current | A | 200,400,630 | 100-3200 | |
4 | Rated short-circuit breaking current | A | Load switch 400-630 | 15-63KV | |
KA | Combination switch depends on fuse | ||||
5 | Rated short-time withstand current | KA | 16,20(4S) | 15(1S) | |
30(1S) | |||||
6 | Rated peak withstand current | KA | 31,5.50 | 30 | |
63 | |||||
7 | Power frequency withstand voltage (1MIN) | KV | Relatively and alternately 32/42 | 25/35 (oil diffused) | ≤0.3,2 |
Height port 36/48 | 20/28 (dry type) | >0.3,2.5 | |||
8 | Lightning impulse withstand voltage (peak value) | KV | Relatively and alternately 32/42 | 60/75 | |
Isolated port 70/85 | |||||
9 | Cabinet protection level | IP44 | |||
10 | Noise level | ab | 55 | ||
11 | Executive standard | GB/T 17467 "High-voltage and low-voltage prefabricated substation" | |||
DL/T537 "6-35KV box-type substation ordering technical conditions" |
Overview
European-style box-type substations(MV/LV Prefabricated Substations) arrange high-voltage, distribution transformers, low-voltage power distribution devices, and electric energy metering equipment into a compact power distribution device according to a certain circuit plan, with a small footprint.
device installation
(1) The location of the box transformer should be close to the load center. According to the load distribution of the district, the load moment is calculated to determine the load center. The box transformer should be installed near the load center. Power loss ≤12%, improve voltage quality Convenient operation and maintenance
(2) Strong vibrations and shocks are not allowed in the use location of the box substation, and no large electromagnetic induction intensity is allowed. For the buried circuit of the box substation, the laying path of each circuit outlet should be arranged, and the safety distance to the underground facilities should be arranged. , And does not affect the long-term development of the power supply area;
(3) The place of use must not have explosive dangerous substances, and the surrounding medium must not contain gases that corrode metals and destroy insulation and conductive media;
(4) The vertical inclination angle of the cabinet installation should not exceed 5°, the outdoor wind speed should not exceed 35m/s, and the relative air humidity should not exceed 90% (25°C);
(5) The installation of box substation does not require the construction of a control room and corresponding workshops. There is no structure for 10kV equipment and a small area. The site only needs to make a reinforced concrete foundation according to the size of the box substation provided by the manufacturer;
(6) Appropriate lifting equipment should be selected for hoisting according to the standard weight and relevant safety regulations. The angle of the hoisting wire rope is less than 60°. When hoisting, the rope should be used to pull the box diagonally to ensure its stable position;
(7) The European box transformer has been debugged before leaving the factory, only need to connect the box transformer high voltage and low voltage cables to the box transformer;
(8) Lightning rods should be arranged around the cabinet and the main transformer, and the equipment should be within its safety protection range. The grounding grid should be buried before the prefabricated foundation, and the grounding resistance should be less than 4Ω. Connect the ground terminal of the box firmly to it;
(9) Since the European-style box substation has reached the technical requirements of unattended operation, there is no need to set up background equipment. When operating, it is necessary to consider strengthening the anti-theft.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler
Year Established:
2020
Total Annual:
1000000-100000000
Employee Number:
30~100
Ecer Certification:
Active Member
Sichuan Baikong Electric Technology Co., Ltd. is located in Pengzhou, Chengdu, Sichuan Province—the hometown of the beautiful panda, the land of abundance, with a registered capital of 106800000 yuan. It is a member of the Standing Committee of the Foreign Trade Commission of the S... Sichuan Baikong Electric Technology Co., Ltd. is located in Pengzhou, Chengdu, Sichuan Province—the hometown of the beautiful panda, the land of abundance, with a registered capital of 106800000 yuan. It is a member of the Standing Committee of the Foreign Trade Commission of the S...
Get in touch with us
Leave a Message, we will call you back quickly!