Payment Terms | T/T |
Supply Ability | 600K pieces per month |
Delivery Time | 7 to 15 days |
Packaging Details | Customized wooden box |
Type | Laminated core |
Material | Silicon steel |
Dimensions | Customized as required |
Mold | Custom make in house |
Trade term | FOB, CIF, EXW etc. |
Lead time | depends on the quantity, 7-15 days in general |
Brand Name | XWT |
Model Number | Custom-made |
Certification | ISO 9001:2008 |
Place of Origin | China, shenzhen |
View Detail Information
Explore similar products
Customized Silicon Steel Motor Lamination Stamping With Progressive Die
High Tolerance Stator And Rotor Electric Motor Silicon Steel Laminations
Electric Motor Core Stator And Rotor Silicon Steel Sheet Lamination Customized
Customized stator lamination and winding assembly manufacture
Product Specification
Payment Terms | T/T | Supply Ability | 600K pieces per month |
Delivery Time | 7 to 15 days | Packaging Details | Customized wooden box |
Type | Laminated core | Material | Silicon steel |
Dimensions | Customized as required | Mold | Custom make in house |
Trade term | FOB, CIF, EXW etc. | Lead time | depends on the quantity, 7-15 days in general |
Brand Name | XWT | Model Number | Custom-made |
Certification | ISO 9001:2008 | Place of Origin | China, shenzhen |
High Light | motor lamination stamping ,motor stator laminations |
Lamination stack stator type motor core lamination stator rotor stamping
Material | Cold rolled non-oriented silicon steel | ||
Manufacturing Type | Cold stamping with high speed press machine | ||
Mold | Making in house | ||
Dimension | Customized as required | ||
Service | OEM&ODM | ||
Packing | PP + Solid Sea-worthy Carton with good protector | ||
Delivery Time | 10 Days if existing compound tools are available/50 Days if we need to making tools | ||
Application | Kinds of motors and generator |
Our service
Drawing and mould-designing.
1. Your specific drawing will be checked carefully by our engineers.
2. If there is no question, quotation will be provided you within 2-3 days, otherwise ,feedback will be sent immediately to confirm the required information.
3.If you are developing a new project, our engineer will provide some professional suggestions as you request.
4.Engineers will provide solutions of mold via 3-D drawing within 3-5 working days, finishing molds within 15-25 days after confirmation.
Samples
1.The manufacturing technique will be confirmed with you in advance. and the sample and mass products will be manufactured according to technique you confirm.
2. If the samples do not meet your rquirement, we will reproduce samples and give you free samples
3.All the samples will be inspected fully.
Production
1.Both online and offline trade operation are available in TELEC.
2.Photos and detailed information will be provided for your reference during the process of production.
3.If you don't have special requirements,, we'll pack the goods in our general packing material.
4.During the process of mass prodcution, the product will be inspected randomly according to our process control.
Packaging
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
4 million-5 million
Employee Number:
70~80
Ecer Certification:
Active Member
Xinwangtai Profile Xinwangtai factory is specilaized in stamping par... Xinwangtai Profile Xinwangtai factory is specilaized in stamping par...
Get in touch with us
Leave a Message, we will call you back quickly!