Item Type | Brick Lights |
Color Temperature(CCT) | 2700K (Soft Warm White), White |
Lamp Luminous Efficiency(lm/w) | 15 |
Warranty(Year) | 1-Year |
Color Rendering Index(Ra) | 50 |
Light Source | LED |
Lighting solutions service | Lighting and circuitry design |
Lifespan (hours) | 6000 |
Product Weight(kg) | 7 |
Input Voltage(V) | DC 36V, AC90-240V |
Lamp Body Material | ABS |
IP Rating | IP54 |
Application | stage |
Color | Color Mixture |
Control mode | DMX512 |
Lamp Power(W) | 120 |
Product name | Disco Light |
Leds | RGB5050 |
Operation mode | DMX Control Mode |
Keyword | led dance floor |
Name | dance floor led |
Working Time (hours) | 50000 |
Working Lifetime(Hour) | 5000 |
Packaging Details | wooden case for the led dance floor |
Place of Origin | Guangdong, China |
Brand Name | Gteak |
View Detail Information
Explore similar products
Product Specification
Item Type | Brick Lights | Color Temperature(CCT) | 2700K (Soft Warm White), White |
Lamp Luminous Efficiency(lm/w) | 15 | Warranty(Year) | 1-Year |
Color Rendering Index(Ra) | 50 | Light Source | LED |
Lighting solutions service | Lighting and circuitry design | Lifespan (hours) | 6000 |
Product Weight(kg) | 7 | Input Voltage(V) | DC 36V, AC90-240V |
Lamp Body Material | ABS | IP Rating | IP54 |
Application | stage | Color | Color Mixture |
Control mode | DMX512 | Lamp Power(W) | 120 |
Product name | Disco Light | Leds | RGB5050 |
Operation mode | DMX Control Mode | Keyword | led dance floor |
Name | dance floor led | Working Time (hours) | 50000 |
Working Lifetime(Hour) | 5000 | Packaging Details | wooden case for the led dance floor |
Place of Origin | Guangdong, China | Brand Name | Gteak |
Shenzhen Shinning led dance floor panels for stage club
Voltage: AC36V, 50/60HZ
Color: white color switch
Size:600*600mm mm/panel
Installation: Easy to install.
Protection: IP55 for outdoor waterproof
Function:led dance floor
Application:Club, Stage, shopping mall, cool led displaying,for wedding etc.
Support: Customized color and control system
Other related products:
1. The lead time for the manufacturing of the led dance floor?
Actually we need 20-25 days to manufacture!
2. How about the guarantee for the dance floor led?
We provide 1 year guarantee .
3. How about the payment if we prefer to order the led dance floor?
You can pay by alibaba online trade assurance or by T/T
Company Details
Ecer Certification:
Active Member
SZ Gteak Technology Co., Limited,is the new family member of Gteak GROUP. We believe that Quality Is Our Culture.Our Group have two factories, One factory for the led display and another for the led light, especially for the led solar light. ( 2 factories- +300 workers- +20 senior technicians- + mor... SZ Gteak Technology Co., Limited,is the new family member of Gteak GROUP. We believe that Quality Is Our Culture.Our Group have two factories, One factory for the led display and another for the led light, especially for the led solar light. ( 2 factories- +300 workers- +20 senior technicians- + mor...
Get in touch with us
Leave a Message, we will call you back quickly!