Payment Terms | L/C,T/T |
Supply Ability | 200, 000 Tons / Year |
Delivery Time | 3-5 week |
Packaging Details | Container 40HQ |
Residential Wall Structure | Bottom Wall Beam |
Surface Treatment | Painted or Galvanized |
Forming | Hot-Rolled Steel |
Windows | Allumimium Alloy/PVC |
HS Code | 7308900000 |
Doors | Sliding Door/Roll-up Door |
Name | Metal Frame Building Construction |
Brand Name | CT Steel Structure |
Model Number | Warehouse86602 |
Certification | SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Customized Steel Structure Manufacturing For Office Building / Poultry Farm /
Modern Steel Structure Warehouse Storage Building Fast Install
Lightweight Galvanized Steel Structure Building Warehouse Customized
Space Frame Steel Structure H Beam Building Construction Warehouse
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 200, 000 Tons / Year |
Delivery Time | 3-5 week | Packaging Details | Container 40HQ |
Residential Wall Structure | Bottom Wall Beam | Surface Treatment | Painted or Galvanized |
Forming | Hot-Rolled Steel | Windows | Allumimium Alloy/PVC |
HS Code | 7308900000 | Doors | Sliding Door/Roll-up Door |
Name | Metal Frame Building Construction | Brand Name | CT Steel Structure |
Model Number | Warehouse86602 | Certification | SGS |
Place of Origin | China | ||
High Light | Custom Steel Prefabricated Building Structure ,Steel Prefabricated Building Structure Lightweight ,Lightweight Metal Frame Building Construction |
Multi Use Warehouse In Panama Steel Structure Supplier Designer Engineer
Product Introduce
Location:Mexico
Dimensions:39 x 28 x 8 meters
Square Footage:1102 Square Meters
His goal was to find a supplier of prefabricated steel to provide high quality materials for his latest building project.The building, an 11,868 sq ft flexible warehouse, will be the first of six identical phases, all of which will be leasehold warehouses built for future tenants.
Quality under our control
After working with a local supplier on a previous pre-engineered metal building project, the client recognised the benefits of steel and made sourcing quality materials a priority for all their future projects.
Based on the client's initial design concepts, it was decided to supply all of the building's main frames, columns and beams from our Spanish factory, thereby having complete control over the quality of most of the building's components.The client is confident in our ability to fulfil our commitments
We'll supply the steel, but we're also an engineering firm.Trust us to find the most effective solution.
Working with their architects, we revised the architectural drawings to improve functionality and efficiency.We dropped unnecessary internal columns to free up more space.Temperature and noise control was improved by introducing higher quality insulated metal panels.Our upgraded design integrated a much-needed mezzanine office and improved the warehouse's inefficient cubicle spacing design.
We can be the best at what we do: being committed solutionists, effectively scrutinising every angle of a project to deliver the best possible building.
Trusting the customer, seamlessly
This custom-designed building consists of steel frames, columns and beams.
This is in addition to the insulated sheet metal roof and wall panels from a reliable supplier, which are currently being installed and are expected to be completed by July 2023.So far, every part of the design, delivery and installation process has gone smoothly and without any complications.This satisfied client is eager to find tenants to occupy the first phase of his latest project, at which time we will begin the second phase of construction.
Whilst this project does not stand out in terms of engineering complexity, size or significance, it clearly depicts our commitment to excellence every step of the way.By handing over control and allowing us to lead with our definition of success, we are able to translate our team, values and expertise into results that exceed our clients' expectations.
We complete construction projects with local certification for front building work and provide our clients with information on the benefits of building work and public materials as a priority for future projects.
The involvement of the client's preliminary design concepts determined the general design of the columns and main buildings of the Marcos, Spanish National building, but we were not able to fully control the temperature of the building components.
The personalised architecture, the building structure, the columns and Vegas, the entire process of the Spanish Allied Factory, the panels of the Metal Aerospace Technology Panel and the panels of the Conference Proofing Process, the Installation Process and the Pre-Installation Process were finally completed in July 2023.
Product Features
Application
Our steel structure warehouses are widely used in the following areas:
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2004
Employee Number:
500~500
Ecer Certification:
Verified Supplier
China CT Steel Structure Group Co., Ltd. is a comprehensive industrial group that integrates steel structure R&D, design, manufacturing, production, and installation. Since its establishment in 2004, it covers an area of approximately 300000 square meters and produces 200000 tons of steel struct... China CT Steel Structure Group Co., Ltd. is a comprehensive industrial group that integrates steel structure R&D, design, manufacturing, production, and installation. Since its establishment in 2004, it covers an area of approximately 300000 square meters and produces 200000 tons of steel struct...
Get in touch with us
Leave a Message, we will call you back quickly!