Payment Terms | L/C, T/T |
Supply Ability | 50 Sets / Year |
Delivery Time | 8months-18months |
Packaging Details | container, wooden case ,bulk |
Condition | New |
Material | Stainless steel, Carbon steel, Aluminum |
Application | Petrochemical, ASU,Gas, Hydrocarbon recovery, ethylene,CO2 recovery |
Pressure | 110bar |
Brand Name | SASPG |
Model Number | Cold box LNG,Heat exchanger, Hydrocarbon recovery, ethylene,CO2 recovery, |
Certification | ASME/CE/GB |
Place of Origin | China |
View Detail Information
Explore similar products
Ethylene Hydrocarbon Recovery Stainless Steel Cold Box LNG 110bar
ASME Cold Box LNG Petrochemical Aluminum Plate Fin Heat Exchanger
CO2 Recovery ASU Carbon Steel Cold Box LNG 4.2×3.5×12.2m
CO2 Recovery Ethylene Carbon Steel Aluminum Cold Box LNG 110bar
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 50 Sets / Year |
Delivery Time | 8months-18months | Packaging Details | container, wooden case ,bulk |
Condition | New | Material | Stainless steel, Carbon steel, Aluminum |
Application | Petrochemical, ASU,Gas, Hydrocarbon recovery, ethylene,CO2 recovery | Pressure | 110bar |
Brand Name | SASPG | Model Number | Cold box LNG,Heat exchanger, Hydrocarbon recovery, ethylene,CO2 recovery, |
Certification | ASME/CE/GB | Place of Origin | China |
High Light | ODM LNG Cold Box ,OEM LNG Cold Box ,Cold Box in Oil and Gas Industry ODM |
CNOOC 2.6 million tons Iran, South pars,LNG,Cold box
Project and Engineering Services, Ltd. (hereinafter referred to as SASPG) will design, manufacture and supply a brand new air separation plant using the latest technology of molecular sieve adsorption, booster turbo expander, structured packing upper column and GOX internal compression process. The device is equipped with air filtration system, air compressor system, air pre-cooling system, molecular sieve purification system, supercharged turbo expander system, cold box system, LOX storage and evaporation system, instrumentation and electrical control system, etc.
LNG cold box is used in natural gas liquefaction plant for liquefaction and purification of natural gas. If the nitrogen content in the natural gas exceeds the standard, a denitrification tower should be installed to purify the natural gas to meet the requirements of the combustion value of LNG norms.
Certificate
Wind tunnel test
Precooling Heat Exchanger (Stage IV Propane Precooling):
Quantity: 4 single row cold box, 8 in total;
1100×1789×8000mm
Liquefaction Heat Exchanger:
Quantity: 4 single row cold box, 8 in total;
1250×2350×8000mm
Sub-cooling Heat Exchanger:
Quantity: 2 single row cold box, 4 in total;
1000×1350×4200mm
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1966
Total Annual:
600million-700million
Employee Number:
2000~2500
Ecer Certification:
Active Member
Situated in the affluent city of Jianyang, SASPG covers an area of 800000m2 with a floor space up to more than 300000m2. Since its founding in 1966, the company has kept on increasing its operation scales and in 2014, the annual production capacity reached 50000 tons. Through many years of develo... Situated in the affluent city of Jianyang, SASPG covers an area of 800000m2 with a floor space up to more than 300000m2. Since its founding in 1966, the company has kept on increasing its operation scales and in 2014, the annual production capacity reached 50000 tons. Through many years of develo...
Get in touch with us
Leave a Message, we will call you back quickly!