Supply Ability | 40 SETS PER YEAR |
Delivery Time | 50 WORKING DAYS |
Packaging Details | Iron frame ,iron plate |
material | 304 |
power supply | according to your local supply |
filling speed | 100KPH |
filling liquid | beer , carbonated drink |
container | 5L |
guarantee | 1 year after installation |
filling container | tinplate keg |
Brand Name | GD |
Model Number | GD-WJGZ-01 |
Certification | CE,UL,ISO |
Place of Origin | China |
View Detail Information
Explore similar products
3 Kw Beer Membrane Filtration System Candle Type Diatomite Filter Machine
SUS304 Candle Type Diatomite Filter Machine
Filter Press Proposal Packaging Production Line Equipment Glass Bottle Filling
Filter Press Proposal Packing Production Line Aerated Beverage Mixer
Product Specification
Supply Ability | 40 SETS PER YEAR | Delivery Time | 50 WORKING DAYS |
Packaging Details | Iron frame ,iron plate | material | 304 |
power supply | according to your local supply | filling speed | 100KPH |
filling liquid | beer , carbonated drink | container | 5L |
guarantee | 1 year after installation | filling container | tinplate keg |
Brand Name | GD | Model Number | GD-WJGZ-01 |
Certification | CE,UL,ISO | Place of Origin | China |
High Light | packaging production line ,monoblock filler and capper |
Two In One Aseptic Glass Bottle Filling And Capping Machine For 5L Beer Cans
This equipment is specially designed for 5L beer cans. It fills beer at aseptic environment, extend the storage period.
This machine finishes the can pressing, pre-evacuation and filling etc. automatically.
All the valves and pneumatic components are world famous brand.
Form the whole filling area aseptic, confirm no damage to the beer.
Pasteurize the beer can outside environment.
Steady filling, beer lose below 0. 5%
Payment
Price term: EXW price, China. It is valid within 14 working days.
Payment: T/T.
50%: The buyer should pay the deposit within 10 working days after signed contract.
50%: The buyer should pay after inspection.
The above quotation is based on machines only, not include related conveyors.
2) Production, Inspection, Delivery, Packing & Shipping, Installation, Debug, Training and After Sales
Production Time: 50 working days
Inspection: 1 days
Packing & Shipping: 40days
Installation, Debug, Training : 10 days
Packing way: Iron packing outside.
We will send 1 man install the machine for you . The buyer needs to supply the air tickets, accommodation, visa fees and salary. Salary for engineer is 120USD per day and 80USD per day for technician.
and we will guarantee the machine in 1 year.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Seller
Year Established:
1997
Total Annual:
20000000-40000000
Employee Number:
200~500
Ecer Certification:
Site Member
dehui established in 1997,headquartered in Jinan,Shandong provide,registered capital 52,300,000,with more than 800 staff.The company is a High-tech enterprise on the fermentation field,and the productive modern service enterprise on the fermentation field.Provide the customers with the systemic solu... dehui established in 1997,headquartered in Jinan,Shandong provide,registered capital 52,300,000,with more than 800 staff.The company is a High-tech enterprise on the fermentation field,and the productive modern service enterprise on the fermentation field.Provide the customers with the systemic solu...
Get in touch with us
Leave a Message, we will call you back quickly!