Packaging Details | Plastic sheeting or wooden case for drilling rig |
Delivery Time | 10 days |
Payment Terms | T/T, West union, L/C |
Supply Ability | 100 sets per month |
Warranty | 12 months |
Place of Origin | Chongqing |
Brand Name | GOLD |
Model Number | zdy-1550 |
Certification | CE |
View Detail Information
Explore similar products
anchors drilling rig for tunnel supporting, Safety of tunnel prop
small underground drilling rig ZLJ-3300 coal tunnel stabilization
Portable underground drilling rig ZLJ-3300 spindle type core drilling rig
Portable underground drilling rig ZLJ-3300 small drilling machine
Product Specification
Packaging Details | Plastic sheeting or wooden case for drilling rig | Delivery Time | 10 days |
Payment Terms | T/T, West union, L/C | Supply Ability | 100 sets per month |
Warranty | 12 months | Place of Origin | Chongqing |
Brand Name | GOLD | Model Number | zdy-1550 |
Certification | CE | ||
High Light | underground drill rigs ,well drilling rig ,micropiles drilling rig |
Diesel type tunnel drilling rig ZDY-1550Gison the basis of hydraulic drilling machine for small Tunnel ,especially the construction characteristics of coal mine tunnels, developed A new generation of type high speed hydraulic drill machine ,which can be widely Used in coal mine, water and electricity, railways, advanced exploration of gas Drainage, grouting hole and pipe roof construction.
1.Drill machine adopts fission structure design, when using,connected by hydraulic Quick connector is advantageous to the machine move .
2.The drill machine speed wide speed range and convenient user use diamond, Alloy, and DTH hammer drilling technology.
3.The drill machine head drilled with chuck clamping, chuck holder with twist drill Pipe. improve labor efficiency, reduce labor intensity.
4.The power head guide roller design is adopted to avoid guide rail wear too fast;
Drill pipe drilling adopt guide roller suppprt, further reduce the gripper slip rapid Wear and improve the reliability fo drill to use.
5. The hydraulic system of drill machine adopts quantitative pump gear pump System, speed adjustment adopts quantitative pump series parallel+motor gear, Speed changes in drill machine torque at low speed, the use of high speed low Torque characteristics. to further ensure the reliablility of the drill machine ,reduce The user maintenance costs.
1 | Drilling capacity | m | 200 |
2 | Max. hole | mm | Φ115 |
3 | End hole caliber | mm | Φ75 |
4 | Drilling specifications | mm | Φ50 |
5 | Single and joint pipe length | mm | Φ50x1200 |
6 | Hole angle | º | 90 |
7 | Chuck hole | mm | Φ53 |
8 | The mast vertical distance adjustment | mm | 600 |
9 | Power head rotation speed | r/min | 510;255;150;75 |
10 | Power head torque | N.m | 250;500;1000;1600 |
11 | Single time to ride | mm | 850 |
12 | Propulsion/pull force | KN | 0-45/60 |
13 | Feeding speed | M/S | 0-0.04;0-0.42 |
14 | The engine power | KW | 22 |
15 | Drill to adapt to the process | diamond, alloy, DTH hammer drilling | |
16 | General water pipe diameter | mm | 48 |
17 | Ventilation tube inner diameter | mm | 48 |
18 | Overall dimension | mm | 2250x850x1300 |
19 | Machine weight | kg | drilling body:500,pump:200x2,consolo60 |
Package: Wooden Case or Plywood
Delivery: Container ship, 10 days after receiving deposit
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2009
Total Annual:
10000000-50000000
Employee Number:
50~100
Ecer Certification:
Active Member
Chongqing Gold Mechanical & Electrical Equipment Co.,Ltd is a high-tech enterprise for researching,designing,developing and producing oil treatment equipment.With it’s continuous drawing... Chongqing Gold Mechanical & Electrical Equipment Co.,Ltd is a high-tech enterprise for researching,designing,developing and producing oil treatment equipment.With it’s continuous drawing...
Get in touch with us
Leave a Message, we will call you back quickly!