Payment Terms | Western Union, T/T, MoneyGram, D/P, D/A, L/C |
Supply Ability | 1000m2/per pay |
Delivery Time | 10 working days |
Packaging Details | Wooden,cartons,custom package |
Condition | New |
Cooling Type | Cooling Tower Parts |
Material | PVC,PP,CPVC |
Warranty | 1 Year |
Name | length 1000*850mm cooling tower fill material Cooling Tower PVC Film Fill for Packaged Cooling Towers |
Width | 850/1000mm |
Height | 1000mm |
Usage | Cooing Tower |
MOQ | 10 square meters |
Thickness | 0.32-0.6mm |
Wave Height | 16mm |
Brand Name | XL |
Model Number | XL-1000-SP |
Certification | SGS |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
EAC 385mm Counter Flow Media Cooling Tower Components 19-20mm
PVC PP Cooling Tower Fill Material OF21 Counterflow Systems Pvc Fills For
500mm Cooling Tower Fill Media Replacement Counter Flow Media PVC Fill Packs
500mm S Wave Counter Flow Cooling Tower Fill Material Cooling Tower Fill Pack To
Product Specification
Payment Terms | Western Union, T/T, MoneyGram, D/P, D/A, L/C | Supply Ability | 1000m2/per pay |
Delivery Time | 10 working days | Packaging Details | Wooden,cartons,custom package |
Condition | New | Cooling Type | Cooling Tower Parts |
Material | PVC,PP,CPVC | Warranty | 1 Year |
Name | length 1000*850mm cooling tower fill material Cooling Tower PVC Film Fill for Packaged Cooling Towers | Width | 850/1000mm |
Height | 1000mm | Usage | Cooing Tower |
MOQ | 10 square meters | Thickness | 0.32-0.6mm |
Wave Height | 16mm | Brand Name | XL |
Model Number | XL-1000-SP | Certification | SGS |
Place of Origin | Jiangsu, China | ||
High Light | 1000mm Cooling Tower Fill Material xianglong ,850mm Cooling Tower Fill Material xianglong ,fill packing cooling tower xianglong |
Description:
Cooling Tower Fill provides sheets of material that are shaped into a corrugated pattern for the water to travel across. It can be combined and stacked into blocks, to create various thicknesses and heights to fit individual cooling towers.
The largest disadvantage of film fill is that it doesn’t provide an opportunity for the water to redistribute itself. The initial water distribution at the top of the fill must be uniform, or the process won’t work well. The close spacing created by the narrow passages of film fill also makes film fill more challenging to maintain. If the water includes large debris like leaves, the fill is prone to clogging.
Tech Date |
|
Sheet Width(mm) | 850/1000mm |
Sheet Length | 1000mmcustomized |
Thickness | 0.32-0.6mm/customized |
Sheet Spacing | 16mm |
Color | grey/white/black |
Material | PP/PVC/CPVC |
*Cooling towers reject heat from water-cooled systems to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which is collected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently.
*There are two main configurations of factory assembled cooling towers: crossflow and counterflow. In crossflow cooling towers, the water flows vertically down the fill as air flows horizontally across. In counterflow cooling towers, the water flows vertically down the fill as air flows vertically up.
Supply in industry
Cooling tower packing cleaning method:
1. Manual cleaning of the slag falling off in the cooling tower;
2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;
3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;
4. After confirming that all parts of the system are cleaned, drain the sewage;
5. Rinse the packing and the inside and outside of the tower body with clean water;
6. Restore all parts of the system, replenish water and use it;
7. After all recovery, please check and accept the management personnel of Party A;
8. Evacuate Party B's belongings and clean the site;
About US
Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.
Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2014
Total Annual:
5000000-7000000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Wuxi Xianglong Plastic Technology Co., Ltd. was established in 2014 and is located in Jiangsu Province, near Shanghai and Ningbo Port. For the past few years, we have devoted ourselves to provide high quality products to the oversea markets. Our products mainly include Cooling Tower Accessor... Wuxi Xianglong Plastic Technology Co., Ltd. was established in 2014 and is located in Jiangsu Province, near Shanghai and Ningbo Port. For the past few years, we have devoted ourselves to provide high quality products to the oversea markets. Our products mainly include Cooling Tower Accessor...
Get in touch with us
Leave a Message, we will call you back quickly!