Payment Terms | Western Union, T/T, MoneyGram, D/P, D/A, L/C |
Supply Ability | 1000m2/per pay |
Delivery Time | 10 working days |
Packaging Details | Wooden,cartons,custom package |
Cooling Type | Cooling Tower Parts |
Material | PVC,PP,CPVC |
Warranty | 1 Year |
Name | 915mm 1220mm 1520mm PVC Filler Cooling Tower Filling material Fill Types Cooling Tower PVC Filler Filling Cooling Tower |
Width | 750/820/920/1020/1220/1520mm |
Wave Height | 19-20mm |
Usage | Cooing Tower |
MOQ | 10 square meters |
Thickness | 0.32-0.6mm |
Brand Name | XL |
Model Number | XL-1520-MA |
Certification | SGS |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
EAC 385mm Counter Flow Media Cooling Tower Components 19-20mm
PVC PP Cooling Tower Fill Material OF21 Counterflow Systems Pvc Fills For
500mm Cooling Tower Fill Media Replacement Counter Flow Media PVC Fill Packs
500mm S Wave Counter Flow Cooling Tower Fill Material Cooling Tower Fill Pack To
Product Specification
Payment Terms | Western Union, T/T, MoneyGram, D/P, D/A, L/C | Supply Ability | 1000m2/per pay |
Delivery Time | 10 working days | Packaging Details | Wooden,cartons,custom package |
Cooling Type | Cooling Tower Parts | Material | PVC,PP,CPVC |
Warranty | 1 Year | Name | 915mm 1220mm 1520mm PVC Filler Cooling Tower Filling material Fill Types Cooling Tower PVC Filler Filling Cooling Tower |
Width | 750/820/920/1020/1220/1520mm | Wave Height | 19-20mm |
Usage | Cooing Tower | MOQ | 10 square meters |
Thickness | 0.32-0.6mm | Brand Name | XL |
Model Number | XL-1520-MA | Certification | SGS |
Place of Origin | Jiangsu, China | ||
High Light | 1220mm film fill cooling tower xianglong ,1520mm film fill cooling tower xianglong ,915mm pvc fills price xianglong |
*The material used for the ML cooling tower filler is PVC/PP/ CPVC. The purpose of the filler is to increase the viscosity of the product, especially the small filler to increase the viscosity significantly. ML cooling tower fill before accumulation is subject to dehydration sale to avoid consuming some of the isocyanate. It must be noted that the changeable carbon anhydride will cause the resin to foam, which will deter the physical properties of the polyurethane resin.
*In order to speed up the wetting speed of ML cooling tower fill and reduce system viscosity. Still more and more fillers are increasing in the polyurethane resin, sometimes it is necessary to add a wetting and wetting dispersant in the resin in advance. In-mold paint is an additive with three benefits of coating, colorant and release agent.
*The ML cooling tower filler is evenly burst into the mold, and after the paint film is dried, the polyurethane sole, self-skin foam, and polyurethane soft foam can be molded. necessary products. If the envoy wants to say that the quality of the filling habits is determined, it still depends on the following aspects:
①ML cooling tower packing has a larger specific surface area (m2/m3 packing layer);
②ML cooling tower filler liquid has better mechanical properties of uniform distribution on the surface of the filler;
③The packing airflow of Marley cooling tower can be evenly distributed in the packing layer;
④ML cooling tower packing material is not without large porosity (m3/m3 packing layer). There are other caves, and factors such as its doctrinal strength, origin, artificiality and price should also be considered when choosing fillers carefully.
Tech Date | |
Sheet Width(mm) | 750/920/1020/1220/1320/1530-1510mm |
Sheet Length | 206MM*N(N=4,5,6,7,8,9,10,11,12......)/customized |
Thickness | 0.32-0.6mm/customized |
Sheet Spacing | 19-20mm |
Color | grey/white/black |
Material | PP/PVC/CPVC |
Cooling tower packing cleaning method:
1. Manual cleaning of the slag falling off in the cooling tower;
2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;
3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;
4. After confirming that all parts of the system are cleaned, drain the sewage;
5. Rinse the packing and the inside and outside of the tower body with clean water;
6. Restore all parts of the system, replenish water and use it;
7. After all recovery, please check and accept the management personnel of Party A;
8. Evacuate Party B's belongings and clean the site;
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2014
Total Annual:
5000000-7000000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Wuxi Xianglong Plastic Technology Co., Ltd. was established in 2014 and is located in Jiangsu Province, near Shanghai and Ningbo Port. For the past few years, we have devoted ourselves to provide high quality products to the oversea markets. Our products mainly include Cooling Tower Accessor... Wuxi Xianglong Plastic Technology Co., Ltd. was established in 2014 and is located in Jiangsu Province, near Shanghai and Ningbo Port. For the past few years, we have devoted ourselves to provide high quality products to the oversea markets. Our products mainly include Cooling Tower Accessor...
Get in touch with us
Leave a Message, we will call you back quickly!