Payment Terms | T/T, L/C |
Supply Ability | 150 sets per month |
Delivery Time | 25-30 days |
Packaging Details | Export package |
Name | Rack And Pinion Elevator |
Application | Veritcal transportation |
Design | According to EU regulation |
Material | Q345B steel |
Production | As per EN 12159:2012, EN 60204-1:2006/A1:2009. |
Feature | Anti Fall Protection |
Brand Name | KANGBO |
Model Number | Construction Hoist Elevator SC200BZ MP-B07 SC200/200BZ MP-B08 |
Certification | TUV, CCC |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Direct Start Up And Stop 46 M / Min Construction Hoist Elevator
Vertical Transportation 36M / Min 2000kg Construction Site Elevator
Double Cage 250M Rack Pinion Construction Hoist Elevator
Low Noise 3200 Kg Construction Material Lifting Hoist
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 150 sets per month |
Delivery Time | 25-30 days | Packaging Details | Export package |
Name | Rack And Pinion Elevator | Application | Veritcal transportation |
Design | According to EU regulation | Material | Q345B steel |
Production | As per EN 12159:2012, EN 60204-1:2006/A1:2009. | Feature | Anti Fall Protection |
Brand Name | KANGBO | Model Number | Construction Hoist Elevator SC200BZ MP-B07 SC200/200BZ MP-B08 |
Certification | TUV, CCC | Place of Origin | CHINA |
High Light | rack and pinion lift ,steel rack pinion lift |
Anti Fall Protection Q345B Steel Rack And Pinion Elevator
Rack And Pinion Elevator Manufacturing Technique
1. Guide rail system
Guide rail system made of 20# steel that is 4.5mm thick.
2. Gear rack
The gear rack is made of 55# steel and its service life is more than 10 years.
3. Power system
The operating time of the construction hoist is 10 to 15 years.
4. Safety devices
a. Fall arrest device
b. Loading capacity limiter
c. Limit switch
d. Upper limit protection device
e. Lower limit protection device
f. Door limit protection device
g. Escaping window limit protection device
h. Bell warning device
i. Emergency stop protection device
j. Buffering protection device
k. Motor overload protector
l. Transformer short-circuit protection device
m. Phase sequence protection device
5. Cable
We employ genuine GB cable that is guaranteed on quality.
6. Electrical system
The main devices in the electrical system are all Name Brands, like Schneider, Siemens.
a. The fan installed helps dissipate the heat effectively.
b. With a time delay relay, the construction lift can stop smoothly and steadily.
c. Alarm bell informs users of the starting of the fall arrest device.
d. Failure warning light will send light signals when there is a failure of the motor or electrical system.
7. Protection fence
The outside fence and fence gate are built with plastic-sprayed perforated plate.
8. Additional scaling ladder
For each construction hoist, two scaling ladders are added to the drive system to ensure more convenient and flexible
installation.
Rack And Pinion Elevator Optional Configuration
Rack and pinion elevator cage flap door as loading/unloading ramp.
Sliding Contact Line (Integrated Conductive Rail or Busbar) specially for rack and pinion lifts.
An intelligent elevator control system, Multi-function Control System, with functions of fault detect, display and alarm, and automatic cage landing/stop and floor selector, is available.
Automatic greasing machine for rack and pinion elevator is availble.
Rack And Pinion Elevator Technical Data
Item & Article No. | SC200BZ, MP-B07; SC200/200BZ, MP-B08 Rack And Pinion Elevator |
Payload Capacity | 2,000 KG per Cage |
Lifting Speed | 0–46 m/min. |
Max. Lifting Height | 250/400 m* |
Cage Width (Internal) | 1.5 m |
Cage Length (Internal) | 3.2 m |
Cage Height (Internal) | 2.35 m |
Cage Doors | 3 Doors, Entry Door + Exit Door + Side Door |
Motor Control | FC (Frequency Control) |
Engine Power | 2x15 KW per Cage |
Gearbox | Helical Gearbox |
Safety Device Type | Centrifugal Brake |
Power Supply Range | 380–500 V, 50 or 60 Hz, 3 Phase |
Mast Section | Square Column 650*650*1508 mm with Bolted Rack |
Rack module | 8 |
* Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer. |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1997
Total Annual:
55,000,000-65,000,000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
Xiamen KANGBO Machinery Group Co., Ltd., has been specializing in manufacturing Construction Hoists and Hoist Spare Parts for more than 20 years. Products: Construction Hoists and Spare Parts Capacity: Annual sales quantity is more than 3500 units Construction Hoist. With experianced me... Xiamen KANGBO Machinery Group Co., Ltd., has been specializing in manufacturing Construction Hoists and Hoist Spare Parts for more than 20 years. Products: Construction Hoists and Spare Parts Capacity: Annual sales quantity is more than 3500 units Construction Hoist. With experianced me...
Get in touch with us
Leave a Message, we will call you back quickly!