Packaging Details | Protect the part with film, Put box in plastic bag with label |
Delivery Time | 4.It only takes 7-8 working days once the order is placed. Priority arrangement for urgent orders |
Supply Ability | 1200-1500 units per month |
Payment Terms | T/T 50% as deposit 50% before shipment or negotiation |
Product Name | Auto Connector Mold Parts |
Application | Auto Connector Mold |
Main Machining | Suface Grinding, EDM |
Hardness | 58HRC |
Service | Custom |
QC System | 100% inspection |
Place of Origin | Dongguan, China(Mainland) |
Certification | ISO9001: 2015 |
Brand Name | Guan Yao |
View Detail Information
Explore similar products
Structural Strength Automobile Casting Components Grinding Accuracy 0.001mm
Wire Cutting Injection Molding Automotive Parts Grinding Accuracy 0.001mm
Customized Automobile Casting Components Mould Precise 0.002mm - 0.01mm
Electric Discharge Machining Precision Automotive Parts , Auto Parts Mold OEM
Product Specification
Packaging Details | Protect the part with film, Put box in plastic bag with label | Delivery Time | 4.It only takes 7-8 working days once the order is placed. Priority arrangement for urgent orders |
Supply Ability | 1200-1500 units per month | Payment Terms | T/T 50% as deposit 50% before shipment or negotiation |
Product Name | Auto Connector Mold Parts | Application | Auto Connector Mold |
Main Machining | Suface Grinding, EDM | Hardness | 58HRC |
Service | Custom | QC System | 100% inspection |
Place of Origin | Dongguan, China(Mainland) | Certification | ISO9001: 2015 |
Brand Name | Guan Yao | ||
High Light | precision automotive parts ,precision car parts |
Auto Connector Mold Parts EDM Processing Accuracy 0.002-0.005mm
Instruction & Maintenance
Mould parts regular maintenance for mould's lifespan effect mostly.The the question is: how do we do the maintenance job while using the parts?
Step 1. Make sure you have a vacuum machine to clear the scrap automatically and regularly, if the scrap clearned well, the broken rate on punch pin will be smaller.
Step 2.Make sure the density of the oil is correct, not too sticky or attenuate.
Step 3. If punch die and die edge have wear issue should stop using, and grinding in time , otherwise it will wear rapidly expanding edge of the mold, and reduce the lifespan of mould and parts.
Step 4. Ensure the life of the mold, the spring also should regularly replaced, prevent spring will damage and affect the use of mold.
Machined Processing
Grinding Mirror EDM
1. EDM Processing
Finish(Ra): 0.13
Accuracy: 0.002-0.005mm
Min Clear radius: 0.03mm
2. Grinding Machine Processing
Finish(Ra): 0.05
Accuracy: 0.001mm
Wire Cutting and CNC
1. Wire-cutting Processing
Finish(Ra): 0.08
Accuracy: 0.002mm
Min Clear radius: 0.05mm
2. High Speed CNC Processing
Finish(Ra): 0.1-0.15
Accuracy: 0.002mm
RPS: 35000
Milling Assembly
1. Professional tool makers for prefect assembly.
2. Milling Processing For pre-rough machining.
Stamping Insert Molding
We have 2 automatic stamping machines with 45 tons to produce terminals for insert molding parts. We can provide one-step service for our customers.
Company Details
Business Type:
Manufacturer
Year Established:
2000
Total Annual:
8000000-10000000
Employee Number:
100~200
Ecer Certification:
Active Member
Welcome to GY ! Our product’s raw material of stable property is imported from Japan, Germany and Sweden, and we also have professional suppliers for the heat treatment service. GY has a professional R&D team, each of whom has rich experiences in mould and mechanical... Welcome to GY ! Our product’s raw material of stable property is imported from Japan, Germany and Sweden, and we also have professional suppliers for the heat treatment service. GY has a professional R&D team, each of whom has rich experiences in mould and mechanical...
Get in touch with us
Leave a Message, we will call you back quickly!