Henan Coal Science Research Institute Keming Mechanical and Electrical Equipment Co. , Ltd.
Payment Terms | T/T, Western Union, D/A, D/P |
Supply Ability | 20 sets per month |
Delivery Time | 2-3weeks |
Packaging Details | wooden box |
Weight | different model different weight |
Condition | new |
Power type | diesel engine |
Warranty | 12 month |
After-sales service provided | instruction book |
Power(w) | 15-55kw |
Color | customized |
Name | concrete pump |
Brand Name | KeMing |
Model Number | KMB series |
Certification | CE, MA, ISO |
Place of Origin | Zhengzhou |
View Detail Information
Explore similar products
Filling Small Concrete Pump Reinforcement Compact Grout Concrete Pump
Portable Small Concrete Pump Diesel Driven Environmental Flexible Movement
Long Pumping Distance Small Concrete Pump Mini Concrete Pump Machine
Secondary Structure Small Concrete Pump Full Hydraulic Concrete Casting Pump
Product Specification
Payment Terms | T/T, Western Union, D/A, D/P | Supply Ability | 20 sets per month |
Delivery Time | 2-3weeks | Packaging Details | wooden box |
Weight | different model different weight | Condition | new |
Power type | diesel engine | Warranty | 12 month |
After-sales service provided | instruction book | Power(w) | 15-55kw |
Color | customized | Name | concrete pump |
Brand Name | KeMing | Model Number | KMB series |
Certification | CE, MA, ISO | Place of Origin | Zhengzhou |
High Light | Diesel Engine Concrete Gunite pump ,Concrete Gunite pump For Pouring Mould ,Wet Concrete Gunite pump |
Discharge Pressure 100m Concrete Pumping Diesel Engine Wet Concrete Gunite
Application:
Concrete pouring refers to the process of pouring concrete into the mold until it is plasticized. In civil construction engineering, the concrete and other materials are put into the mold to make a predetermined shape. When the concrete is poured, the free height of the concrete should not exceed 2m. When it exceeds 3m, it should be Take corresponding measures.
Pouring of columns
1. Before pouring the column, the bottom of the column should be filled with 5-10cm thick halved gravel concrete with the same mix ratio as the concrete. The column concrete should be vibrated in layers. When using the plug-in vibrator, the thickness of each layer is not more than 50cm, vibrating rod Do not touch the steel bars and embedded parts. In addition to the vibrating on the top, someone below needs to beat the template at any time.
2. If the column height is within 3 meters, the ash can be poured directly from the top of the column. When the column height exceeds 3 meters, measures should be taken to use stringed cylinders to cast in sections. The height of each section shall not exceed 2 meters.
3. The column concrete should be poured at one time, if construction joints are needed, it should be left under the main beam.
Features:
1. Optimal design of the hopper. low resistance parabolic S tube. suction excellent performance;
2. Configuration with a large row of imported most open pump and hydraulic components imported.
3. With Relay-based integrated electronic control system, simple and reliable, more user-friendly design; surfacing Shaped glasses plate, cutting ring is not only high hardness, and repair. use and low cost.
4. Can also choose the high life of carbide cutting ring plate glasses. Well-designed open.
5. Double-circuit hydraulic system, for the small impact: can lift guide rollers.
Specification:
Items | Unit | Parameter | |||||||
KMB-50 | KMB-40 | KMB-30 | KMB-20 | KMB-10 | KMB-8 | ||||
Capacity | m3/h | 50(30-34) | 40_25-30) | 30(20-25) | 20(15) | 10(8) | 8(6) | ||
Max. aggregate size | mm | 40 | 30 | 20 | 20 | 25 | 15 | ||
Delivery pipe | mm | DN150/DN125 | DN125/DN100 | DN125/DN100 | DN125/DN100 | DN100/DN80 | DN80 | ||
Max. dist | horizontal | m | 300 | 300 | 300 | 200 | 150 | 50 | |
vertical | m | 100/80 | 100/80 | 80/60 | 40 | 60 | 20 | ||
Diesel engine | KW | 84 | 56 | 44 | 40 | 40 | none | ||
Main oil pump | 140 double | 140/112 double | 112/80 double | 80 | 50 | 40 | |||
Cylinder diameter | 200 | 180 | 140 | 120 | 140 | 120 | |||
Motor power | KW | 55 | 45 | 37 | 22 | 22 | 15/11 | ||
OutPut pressure | Mpa | 8-13 | 8-13 | 6-8 | 5-8 | 5-8 | 3-5 |
Certification:
In March 1979, our company was established in Zhengzhou, Henan.
In July 2009, the company passed the ISO9001:2008 Quality Management System Certification.
In October 2010, the company was entitled as the “Henan Provincial High-tech Enterprise”.
In 2013, the new wet shotcrete technology was reward the second prize of Henan Provincial S&T Progress Award.
In December 2014, the brand “KEMING” was awarded the “Henan Provincial Famous Trademark”.
In October 2016, “KEMING” series products have been certified by CE Certification.
Why choose us:
Henan Coal Science Research Institute Keming Mechanical and Electrical Equipment Co. , Ltd. (the former Keming Mechanical and Electrical Department of Henan Coal Scientific Research Institute) is a holding subsidiary of Henan Coal Scientific Research Institute Co., Ltd.
Our company is dedicated to the research and development, production and sales of shotcrete machine, grouting pump, and complementary products. Up to now, we have developed more than 50 kinds of products, covering spraying machines, pumps and other series of products.
Achievements: Our company has obtained more than 20 national invention patents and utility model patents, more than 10 scientific and technological achievements appraisal awards, 8 awards from China National Coal Association and Department of science and technology of Henan province, and the second prize of Henan Provincial S&T Progress Award.
Business Scope: As a comprehensive high-tech enterprise, our company is engaged in the research and production of mining machinery, engineering machinery and supporting equipment for underground engineering, as well as environment protection, chemical industry, inspection and testing of mining equipment, research and production of mechanical and electrical products, technology and finance, management and technology consulting service, and other industries.
Exhibition:
Bauma Shanghai 2018
FAQ:
1. Q:How to pay for this order?
A:Generally, TT, 30% deposit 70% before shipment; L/C at sight (high bank charge, not suggest, but acceptable);100% TT in advance (especially for small amount and spare parts etc.)
2. Q:How to place an order?
A:Both online order and offline order are acceptable.
3. Q:How about the package?
A:We have fumigation-free wooden case to protect the machine from damage during the long-distance delivery.
4. Q:What is the lead time?
A:1 week for sample model, 2~3 weeks for customized model. It depends for mass production.
5. Q:What should we do if there are some problems with the machine?
A:You can refer to the Operate Instruction or call our 24-hour service hotline. Also, our engineers are available to service overseas.
6. Q:Do i need technical skills to operate this machine?
A:Yes. Please read the Operation Instruction for some basic technical skills. And, we provide online and onsite technical training if necessary.
Company Details
Business Type:
Manufacturer
Year Established:
1979
Total Annual:
20000000-30000000
Employee Number:
300~400
Ecer Certification:
Verified Supplier
The earliest domestic institute engaged in the research and development of shotcrete technology The most representative institute standing for the contemporary development of shotcrete technology The first institute realizing the leap development from technology development to mass production ... The earliest domestic institute engaged in the research and development of shotcrete technology The most representative institute standing for the contemporary development of shotcrete technology The first institute realizing the leap development from technology development to mass production ...
Get in touch with us
Leave a Message, we will call you back quickly!