Zhejiang Huier Coating Environmental Protection Equipment Co., Ltd
Products
Manufacturer of a wide range of products which include Customizable Steel Speed Adjustable Chain Suspended Conveyor Systems Ceiling,PLC Controlled Heavy Duty Steel Hanging Conveyor System Chain System,Double Door Industrial Oven S...
MOQ:
Price:
Track turning radius | Generally Between 1 - 5 Meters |
Carrying capacity | Ranging From Tens Of Kilograms To Several Tons, Depending On Different Models And Designs |
Installation Method | Ceiling-mounted |
Driving power | Determined According To Factors Such As Conveying Length And Load |
Control System | PLC |
Conveying speed | Usually Between 0.5 - 20 M/min, Adjustable |
Material | Steel |
Hanging Type | Chain |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Control System | PLC |
Material | Steel |
Track turning radius | Generally Between 1 - 5 Meters |
Hanging Type | Chain |
Operating noise | Usually Between 60 - 80 Decibels |
Installation Method | Ceiling-mounted |
Driving power | Determined According To Factors Such As Conveying Length And Load |
Conveying distance | Can Be Customized According To Actual Needs, Hundreds Of Meters Or Even Longer |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Ratio of equipment uptime | Measures Equipment Stability |
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Ratio of equipment uptime | Measures Equipment Stability |
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Ratio of equipment uptime | Measures Equipment Stability |
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Ratio of equipment uptime | Measures Equipment Stability |
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Ratio of equipment uptime | Measures Equipment Stability |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Ratio of equipment uptime | Measures Equipment Stability |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Ratio of equipment uptime | Measures Equipment Stability |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Brand Name | Huier |
Place of Origin | zhejiang |
MOQ:
Price:
Cost reduction rate brought by process improvement | The Proportion Of Production Costs Reduced Due To Process Optimization |
Fault response time | The Time From Receiving The Fault Report To The Technician Arriving At The Site |
Painting qualification rate | The Proportion Of Qualified Painted Products In The Total Output |
Parts inventory turnover rate | Reflects The Efficiency Of Parts Inventory Management |
Ratio of equipment uptime | Measures Equipment Stability |
Repair completion time | The Time From The Occurrence Of The Fault To The Completion Of The Repair |
Service satisfaction | The Survey Results Of Customer Satisfaction With Supporting Facilities And Services |
Brand Name | Huier |
Place of Origin | zhejiang |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!